CPA Projects Database

City/Town Name Description Approval Date
Categories
Acton Community Housing Regional Housing Services

The Town approved a two-year CPA appropriation for this regional program in 2012. This funding renews the Town's participation and will cover the fees for the next two-year contract. The regional program assists with affordable housing matters which include monitoring affordable units, compliance with regulatory agreements and home ownership training for affordable unit owners.

04/07/2014
 
Acton AHA - Windsor Ave Doors and Windows

This project will fund much needed new doors and windows at the AHA apartment complex at Windsor Ave in order to protect the housing units from further deterioration due to weather and mold.

04/07/2014
 
Acton West Acton Baptist Church - Fire Safety Systems

This project will fund an overhaul of the existing fire and safety protection systems which will include ADA compliant components. This extraordinary repair is necessary for the building to maintain its functional intended use.

04/07/2014
 
Acton Acton Woman's Club - ADA Access Improvements

Improvements made from the 2011 CPA appropriation triggered Mass Architectural Access Board requirements for full building accessibility. This will help fund a vertical lift to the second floor and renovation of the first floor bathroom to meet full accessibility requirements.

04/07/2014
 
Acton Acton Arboretum - Parking Lot Improvements

The existing parking lot conditions limit the use of the arboretum to the general public. This project will fund an enlarged, improved, handicapped accessible paved parking lot for the arboretum.

04/07/2014
 
Acton NARA Security Upgrades and Shade Structures

Improvements to recreation facility to include two additional shade structures and bathhouse security upgrades.

04/07/2014
 
Acton Schools - Nature Play Space Planning

Preliminary design and final schematic plan for the creation of handicapped accessible, simply constructed nature place spaces for all the pre-K through grade 6 schools.

04/07/2014
 
Acton Community Housing Program Fund

Replenishes the existing Community Housing Program Fund for the acquisition, creation, preservation and support of community housing in Acton. $13,275 in capital improvement for deed restricted units. $12,600 in mortgage payment and down payment assistance.

04/07/2014
 
Acton Wright Hill Land Purchase

To bond up to $900,000 and to appropriate an amount equal to the difference between $1,320,000 and the amount bonded for the purchase of approximately 14 acres of open space for conservation purposes. Seller: Wright Hill Association, L.L.C.

04/07/2014
 
Acton Acton Arboretum - Bog Boardwalk

This project will fund the construction of a new boardwalk and a paved universal access sidewalk ramp from Minot Ave. and Forest Road.

04/07/2014
 
Acton Morrison Farm Improvements

This project will fund a new handicapped accessible trail system , an archaeological survey of Robbins Homestead and Ice House area, improvements to an existing parking lot and addition of a small picnic area as well as refurbishing the boat launch and directional signs.

04/07/2014
 
Acton Community Housing Program Fund

Replenish the existing Community Housing Program Fund, held by the Acton Community Housing Corporation, for the acquisition, creation, preservation and support of community housing in Acton. $153,140 has been was made available to purchase a 3BR unit for the Acton Housing Authority

04/06/2015
 
Acton Discovery Museum- Discovery Woods & Creativity Playscape

The Discovery Museums, INC. proposes to build two main outdoor recreational activity areas, called Discovery Woods and Creativity Playscape, to relocate parking and to build a gateway/ portal to allow better access to the adjacent Great Hill conservation and recreation land. The Total project cost is 1.3 million, of which 85% is funded through private donations. Funding has been made to help fund the two main outdoor areas, Discovery Woods (a nature playscape) and the Creativity Playscape.

04/06/2015
 
Acton Ice House Pond & Robbins Mill Pond- Water Chestnut Removal

Funding has been made to fund a three-year water chestnut removal program for Ice House Pond and Robbins Mill Pond. The preservation project will be conducted by a licensed environmental company using mechanical harvesting.

04/06/2015
 
Acton Acton Women's Club- Phase 2, Preservation & Accessibility

The Acton Women's Club is located in the Acton Center Historic District. The Women's Club received Community Preservation Act (CPA) funding in 2011 for the installation for an accessible sloped walkway at the right-side building entrance to provide handicap accessibility to the first floor. Funding has been made to complete the second phase of the project and include addressable fire alarm system, illuminated signs, emergency lighting and panic devices on the exit doors.

04/06/2015
 
Acton Acton Arboretum- Fern Boardwalk and Tree Removal

Funding has been made to help fund the construction of a new boardwalk and the removal of 14 trees to improve safety and forest diversity.

04/06/2015
 
Acton Schools- Nature Play Space, Construction

Funding has been made for the construction of handicapped accessible resource rich, simply constructed nature place, spaces for the elementary schools in Acton. This request is for the construction of the Nature Play Space for the Acton elementary schools as part of the regional school system.

04/06/2015
 
Acton Forest Cemetery- National Register

The Massachusetts Historic Commission has previously deemed the cemetery eligible for inclusion in the National Registry Listing and Cemetery Commissioners have affirmed their desire to pursue this designation. Funding has been made to provide funding to hire a Historic Preservation Consultant to prepare the nomination papers submitted to the National Park Service.

04/06/2015
 
Acton Acton Arboretum- Irrigation Well

Funding has been made to fund the cost and installation of an irrigation well at the Acton Arboretum. The Acton Arboretum water supply has been shut down for 2 years due to a leak. The Acton Arboretum water comes form a metered town service near the corner of Taylor Road and Main Street.

04/06/2015
 
Acton Assabet River Rail Trail

The 12.5-mile Assabet River Rail Trail (ARRT) is proposed to run from Acton via Maynard, Stow, and Hudson to Marlborough The five communities have jointly advanced the trail since 1995 and a section of the ARR5T in Marlborough and Hudson is built and actively being used. To date, the ARRT has revived close to $2.2 million in public and private funding, donations, and commitments. Acton Town Meeting has appropriation to meet their 20% local share for trail design cost. Funding has been made to help fund the easement acquisitions.

04/06/2015
 
Acton Acton Housing Authority- Project Feasibility Study

Funding has been made for the Acton Housing Authority to fund consulting service for a planning and feasibility study. The study will assist in determining the most feasible options for creating new affordable housing opportunities for low income Acton seniors.

04/06/2015
 
Acton South Acton Congregational Church – Roof Repair

Funding has been made to help preserve the historic building through funding roof repairs that prevent ice dam formation. The rehabilitation of the roof is an extraordinary repair that will reverse the deterioration of the roof and preserve the building’s historic function for use as a church and community meeting place.

04/05/2016
 
Acton Acton Congregational Church – Stained Glass Window Preservation

The Acton Congregational Church is located at 12 Concord Road in the Acton Center Historic District. It is listed on the National Register of Historic Places and the Acton Historical Commission’s Cultural Resource List. It was built in 1846 with renovations made in 1889. The funding has been made for the restoration for the approximately 120-years-old stained glass windows that need attention in the short term in order to prevent further damage.

04/05/2016
 
Acton Historic District Consultant

Funding has been made from the historic set-aside account to fund consulting services for a detailed historical inventory of the characteristics and features of each of Acton's Historic Districts.

04/05/2016
 
Acton NARA Miracle Field Sports Pavilion

Funding has been made for the construction of a multi-use building. This building will serve users of the Miracle Field by providing refreshment and bathroom facilities, plus office and storage space for Recreation and NARA staff.

04/05/2016
 
Acton Regional Housing Services Program (One Year)

The Town approved a two-year CPA appropriation for this regional program in 2012. This funding renews the Town's participation and will cover the fees for the next year. The regional program assists with affordable housing matters which include monitoring affordable units, compliance with regulatory agreements and home ownership training for affordable unit owners.

04/05/2016
 
Acton Land Acquisition – Central Street

This parcel contains 11.94 acres of open space, of which roughly eight acres is forested wetlands and floodplain. Within the wetlands on the property is the tributary that forms Muddy Brook. Mt. Hope Cemetery, which abuts the Heath Hen Conservation Area, borders the parcel on the east and south sides. Seller: William D. Chisholm

04/05/2016
 
Acton Acton Congregational Church – Preservation Master Plan

Funding has been made for a Master Plan for the three historic properties located at 8, 12, and 20 Concord Road in the Acton Center Historic District to evaluate and identify critical needs and set restoration and rehabilitation priorities to preserve these historic assets for future years. All three buildings are listed on the National Register of Historic Places and the Acton Historical Commission’s Cultural Resource List.

04/05/2016
 
Acton Acton Housing Authority – Windsor Green Windows Installation

Funding has been made for the Acton Housing Authority for installation and materials for window enclosures in the 68 residential units at the Acton Housing Authority’s Windsor Avenue buildings.

04/05/2016
 
Acton Skate Park Expansion – Phase 2, Skate Plaza

Funding has been made for phase two of a two-part expansion of the T.J. O’Grady Skatepark. Phase two construction consists of a triangular Skate Plaza. Phase two converts the barren 100’ x 100’ area remaining after the original Skate Park parking lot was removed to support the Lower Fields’ synthetic turf field complex installation.

04/05/2016
 
Acton Open Space Acquisition and Preservation Fund

The Community Preservation Committee may appropriate spending from the Open Space Set-Aside Fund for the purpose of acquisition, creation, and preservation of open space, or its rehabilitation or restoration.

04/05/2016
 
Acton Community Housing Program Fund

Funding has been made to replenish the existing Community Housing Program Fund for "the acquisition, creation, preservation, and support of community housing in the Town of Acton." ACHC proposes to continue its current programs and initiate new ones: Grant for Housing and Economic Development Implementation Plan with EOEEA matching grant $18,750; capital improvement for affordable unit $1800. $60,000 grant to Habitat of Humanity to subsidize a duplex at 43-45 School St.

04/22/2016
 
Acton NARA Picnic Pavilion Restroom

Funding has been made to the installation of a modular 2-stall handicap accessible restroom across from the NARA Picnic Pavilion. Restrooms will be connected to the existing septic system at the Bathhouse.

04/03/2017
 
Acton Morrison Farm Well

Funding has been made for Morrison Farm Well to be irrigated via the installation of a private well.

04/03/2017
 
Acton Regional Housing Services Program (One Year)

The Town approved a two-year CPA appropriation for this regional program in 2012. This funding renews the Town's participation and will cover the fees for the next year. The regional program assists with affordable housing matters which include monitoring affordable units, compliance with regulatory agreements and home ownership training for affordable unit owners.

04/03/2017
 
Acton Iron Work Farm – Jones Tavern Preservation Project

Funding has been made to the preservation, restoration, and protection of the original historic features including window frames, rotted clapboards, and trim elements on the 1732 main house, the ca. 1750 tavern ell, and the early 19th-century west ell. It also includes some selective repointing of the foundation, replacement of the wood shingle roof on the 1870s north ell, and the historically-appropriate replacement of some 20th- century features that have deteriorated beyond repair. The Jones Tavern has received CPA grants in prior years to restore its four brick chimneys and replace a portion of its roof. There is an existing historic preservation restriction and the historic preservation restriction may need to be updated.

04/03/2017
 
Acton NARA Parking Lot Expansion

Funding has been made to the construction of a parking expansion at the upper parking lot. The upper lot consists of a 24-car paved parking lot extension along the walking trail between the existing paved upper lot and the sports pavilion. The parking lot will include additional handicap spaces next to the sports pavilion and provide for better traffic circulation.

04/03/2017
 
Acton Acton Historical Society – Re-roof at the Jonathan & Simon Hosmer House

Funding has been made to the removal and replacement of the existing wood shingle roof. The House is in danger of water and other damage due to the deterioration of the roof. The Acton Historical Society received CPA grants in 2011 for the restoration, rehabilitation of the windows and doors and for the roof replacement of two out-buildings on the property. There is an existing historic preservation restriction and the existing historic preservation restriction may need to be updated.

04/03/2017
 
Acton Acton Arboretum Cedar Arbor, Kiosk and Culvert

Funding has been made to fund a three piece project to help restore existing recreational structures to enhance the Arboretum. It first helps to create a new cedar arbor to replace the broken one. Next, the it helps to the replace the old kiosk. Lastly, it helps to replace a broken culvert under the wildflower trail. The Friends of the Acton Arboretum will donate $1,000 to help offset the costs of this project.

04/03/2017
 
Acton Open Space Set-Aside

The Community Preservation Committee may appropriate spending from the Open Space Set-Aside Fund for the purpose of acquisition, creation, and preservation of open space, or its rehabilitation or restoration.

04/03/2017
 
Acton Bruce Freeman Rail Trail (BFRT) Phase 2B

Funding has been made for Acton’s portion of the 100% engineering design plan needed to bring Phase 2B to construction ready. Concord is funding its portion of the Phase 2B 100% engineering design while MassDOT is also contributing funds.

04/03/2017
 
Acton Community Housing Program Fund

The Community Housing Program Fund is for "the acquisition, creation, preservation, and support of community housing in the Town of Acton." It has been used in the past to finance a diversity of affordable housing initiatives and opportunities as they arise. This fund is managed by the Acton Community Housing Corporation (ACHC). $50,000 grant to 446 Mass Ave for local share of $550,000 for 31 rental units of housing for both seniors and disabled adults

04/03/2017
 
Acton Acton School Street Project - Historic Preservation

For rehabilitation of the historic two family dwellings at 43-45 School Street. The Historic Resource category assists Habitat with the building’s rehabilitation in accordance with the requirements of the Acton Historic District Commission and consistent with the United States Secretary of the Interior’s Standards for the Treatment of Historic Properties, including windows, doors, roofing, gutters, masonry, and exterior trim.

04/02/2018
 
Acton Regional Housing Services Program (One Year)

This funding renews the Town's participation in the RHSO and will cover the fees for the next two years. The regional program assists with affordable housing matters which include monitoring affordable units, compliance with regulatory agreements and home ownership training for affordable unit owners.

04/02/2018
 
Acton NARA Performance Improvements

For the purchase of a portable stage to be used for accessibility to the parks amphitheater performance stage.An accessible ramp is a requirement for ADA access to NARA amphitheater’s elevated Stage Risers.

04/02/2018
 
Acton Skate Park Expansion – Phase 2, Skate Plaza

The second phase of a two-part expansion of the T.J. O’Grady Skatepark. Allocating funds for the construction of a triangular Skate Plaza.Road. This provides the funds for the construction and landscaping of a triangular skate plaza built around a bio-retention area, the installation of a formal entrance and viewing area that are accessible for persons with disabilities.

04/02/2018
 
Acton McCarthy Village Siding and Deck Repair

For siding and deck replacement at the 23 unit elder/disabled development on Sachem Way. The preservation work will replace siding and decking that dates from the original building construction in the 1980’s.

04/02/2018
 
Acton Acton School Street Project - Community Housing

To preserve the existing two family affordable housing.The 2017 Annual Town Meeting voted to authorize conveyance of the property for affordable housing purposes. It is now owned by Habitat for Humanity North Central Mass, Inc.Funding will be contingent on recording a perpetual affordable housing restriction that secures the property on Acton’s Subsidized Housing Inventory.

04/02/2018
 
Acton Kennedy Building Rehabilitation at Woodlawn Cemetery

To complete funding for the rehabilitation and renovation of the Kennedy Building, located in Woodlawn Cemetery. The work includes accessibility improvement that will make the building fully ADA compliant; windows and front door; and interior rearrangement of offices, meeting room and other spaces to better fulfill their purposes. The Acton Historical Commission has determined that The Kennedy Building is an important cultural resource in its cemetery context, setting and function.

04/02/2018
 
Acton Accessible Campsite at Camp Acton

For the creation of one handicapped accessible campsite at Camp Acton, by modifying the landscape to improve overall accessibility of the site, toilets, and parking lot. Improvements include compacted surfaces, a boardwalk, a raised campfire ring, two wheelchair friendly tent sites, a wheelchair-friendly picnic table, drainage and removal of hazardous trees.

04/02/2018
 

Pages

CSV