City/Town Name | Description | Approval Date |
Categories |
|
---|---|---|---|---|
Acton | Open Space Preservation Plan |
There are many older Conservation Restrictions held by the Town or are on town owned land are not monitored as intended by the Massachusetts Conservation Restriction Handbook. The funding amount will create a survey with bounds and a Baseline Documentation Report for four (4) CRs throughout Acton. Annual monitoring will be conducted by Town Staff. CRs are a critical component to preserving open space and one of the more influential tools available to ensure the preservation of natural resources. |
05/01/2023 |
|
Acton | D. Jenks Conservation Land Culvert Replacement Phase 1: Engineering Site Work |
Jenks Conservation Land, acquired by the Town in 1973, has a deteriorating concrete culvert that is undersized in its capacity and poses a serious safety risk to pedestrians during dangerous flood conditions. Upgrading the culvert is critical to maintain climate resiliency of the area. Funds will be used for Phase 1, which consists of engineering services that will develop three viable options for the Townâs consideration to be used in Phase II: Permitting and Construction Documents and Phase III: Construction. Phase 1 funding is critical to assess the culvert and determine the best path moving forward. |
05/01/2023 |
|
Acton | NARA Bridge Boardwalk Reconstruction |
Funds will be used to replace the 300-foot NARA Bridge Boardwalk that was constructed in 1999. In 2007, extremely high spring water levels lifted the Boardwalk off its footings and permanently damaged the support structure. While numerous repairs have been made since then, the structure is in such a deteriorated state that complete replacement is needed. The Boardwalk is an essential link in the NARA Park accessible walking path system, frequented annually by thousands of park visitors. The new Boardwalk will be constructed by drilling helical piles into the substrate and building a Boardwalk out of durable, long-lasting Trex material. |
05/01/2023 |
|
Acton | Isaac Davis Monument |
The Isaac Davis Monument commemorates the sacrifices of the Acton Minutemen at the Battle of the North Bridge in Concord on April 19, 1775. Acton residents will be celebrating the 250th Anniversary of the Revolutionary War in 2025. CPA funds will be used to rehabilitate this historic monument in time for the anniversary. Funding includes repointing and repairs to the Isaac Davis Monument, professional cleaning and waterproofing to graves, plaques, and other objects on the Town Common, restoration of the 13 granite markers along the Isaac Davis Trail, and restoration of the Isaac Davis plow. |
05/01/2023 |
|
Acton | Repointing & Chimney Restoration of 1889 Memorial Library |
The funds will provide funding for necessary work to preserve and restore parts of the historic 1889 portions of the original Acton Memorial Library building. The work will include spot pointing the east, west and south sides of the buildingâs brick and brownstone exterior, resetting granite steps, repointing brownstone steps, and rebuilding approximately five feet of the west chimney top due to spalling mortar and bricks. This project received $70,000 in CPA funds in 2020, but due to rising costs, that fund amount does not cover the total cost of the work. Without this critical repair, continued degradation of the mortar, brick, and brownstone will persist, and interior water damage will be imminent. |
05/01/2023 |
|
Acton | 18 Windsor Ave Exterior Repairs and Paint |
18 Windsor Ave is on the Massachusetts State Register of Historic Places and located within the West Acton Historic District. The existing fire escape causes rain water to splash onto the south side of the building, generating decay of the exterior siding. The funds will be used to repair the exterior siding, and repaint and install gutters to prevent moisture damage to the exterior siding. |
05/01/2023 |
|
Acton | Regional Housing Services Program |
Continue the Townâs participation in a Regional Housing Services Program to assist with meeting the administrative, compliance and monitoring needs for the Townâs existing affordable housing units, update and reconciliation of local housing inventory records with those maintained by the Department of Housing and Community Development; new project review assistance; maintenance of ready-buyer lists; assistance with affordable housing lotteries and resales; conducting homeownership training, and to further regional housing goals and efforts. |
05/01/2023 |
|
Acton | 549 Main Street Conservation Restriction |
$1,030,000 will be appropriated from the Open Space Set-Aside Fund to fund the purchase of a Conservation Restriction and long-term monitoring of the 56.85-acre property at 549 Main Street associated with the purchase of the property by the Acton Water District. |
05/01/2023 |
|
Acton | Open Space Set-Aside |
Adds $775,000 to the Open Space Set-Aside fund balance. |
05/01/2023 |
|
Acushnet | White's Woods |
A 10-year bond to purchase White's Woods. |
10/12/2004 |
|
Acushnet | Scout's Pond Walking and Bike Path |
For a walking and bike path at Scout's Pond. |
09/19/2005 |
|
Acushnet | White's Woods |
Additional funding for White's Woods purchase. |
04/24/2006 |
|
Acushnet | White's Woods |
Additional appropriation for White's Woods acquisition |
04/24/2006 |
|
Acushnet | Town Green Reconstruction |
For the design/plans/specifications for the renovation and reconstruction of the Town Green |
10/16/2006 |
|
Acushnet | Pope Park lighting |
To install lighting at Pope Park as part of the restoration and rehabilitation of the ball field |
10/16/2006 |
|
Acushnet | Town Green Renovation |
Preservation & restoration of Town Green. |
10/15/2007 |
|
Acushnet | Russell Memorial Library Restoration |
Restoration of Libary facade. |
10/15/2007 |
|
Acushnet | Pope Park Restoration |
Restoration of park facilities. |
10/15/2007 |
|
Acushnet | White's Factory Repairs |
Repairs to Historic White's factory. |
05/19/2008 |
|
Acushnet | Marie S Howard School & Community Center |
Restoration of portico and surrounding fascia. |
05/19/2008 |
|
Acushnet | Purchase of Keene Road Lot |
Purchase of land for Open Space. Seller: Walter E. and Alberta Hamilton, Jr. Map 3, Lot 9D |
10/25/2008 |
|
Acushnet | Affordable Housing Site Assessment |
Site assessment for Affordable Housing |
10/25/2008 |
|
Acushnet | TOWN HALL RENOVATION/RESTORATION |
RENOVATION/RESTORATION OF HISTORIC TOWN HALL BUILDING |
10/19/2009 |
|
Acushnet | COUNCIL ON AGING RENOVATION/RESTORATION |
RESTORATION/RENOVATION OF HISTORIC BUILDING |
10/19/2009 |
|
Acushnet | PARTING WAYS FACADE RESTORATION |
RESTORATION OF HISTORIC FACADE |
10/19/2009 |
|
Acushnet | HISTORIC RECORDS RETENTION |
CREATE RETENTION STORAGE AREA FOR HISTORIC RECORDS |
05/24/2010 |
|
Acushnet | ACUSHNET HOUSING GRANT |
GRANT TO FUND HANDICAP BATHROOM |
05/23/2011 |
|
Acushnet | Agricultural Preservation Restriction |
Agricultural restiction on Silverbrook Farm. CPC money paid for only 10% of the APRÂs value. It is considered agriculture. (The lot with the house on it has been subdivided out.) Acushnet does not hold the restriction. It is held and monitored by the MA Dept. of Agriculture (MDAR). Parcel ID# 7-30. Seller: Joseph J Pereira |
05/23/2011 |
|
Acushnet | Friends Meetinghouse Carriage House Construction |
Rehabilitation and reconstruction of the original 10 stall carriage house at the historic Friends meeting House |
10/24/2011 |
|
Acushnet | PartingWays Building Restoration |
Repair and restoration of Historic PartingWays Building |
10/24/2011 |
|
Acushnet | COUNCIL ON AGING RENOVATION/RESTORATION |
Preserving, restoring and rehabilitating the historic Council on Aging building, including repairing and replacing the roof. |
06/04/2012 |
|
Acushnet | ACQUISITION OF PERRY HILL CHURCH |
COSTS ASSOCIATED WITH TAKING BY EMINENT DOMAIN OF THE HISTORIC PERYY HILL CHURCH PROPERTY. |
06/04/2012 |
|
Acushnet | PERRY HILL CHURCH RESTORATION |
Preserve, renovate, rehabilitate and remodel the historic Perry Hill Church. |
06/04/2012 |
|
Acushnet | ACUSHNET HOUSING AUTHORITY RENOVATIONS |
Preserve, rehabilitate, restore community housing at the Acushnet Housing Authority Buildings. |
06/04/2012 |
|
Acushnet | Pope Park Security System |
Installation, update and upgrades to exisiting security system and lighting at Pope Park. |
06/04/2012 |
|
Acushnet | Conservation Restriction - LaPalme Property |
Purchase a Conservation Restriction over property known as the Lapalme Property - 46.6 acre parcel. Bristol South Registry of Deeds. Seller: Buzzards Bay Coalition. Assessors Map 24, Lot 145, Acushnet, MA 02743 |
06/04/2012 |
|
Acushnet | POPE PARK DUGOUTS |
INSTALLATION OF TWO NEW DUGOUTS |
10/22/2012 |
|
Acushnet | SEVERENCE HOUSE RELOCATIONS/RENOV. |
RELOCATE HISTORIC HOME AND PROVIDE RENOVATIONS |
05/20/2013 |
|
Acushnet | EMA ROOF REPLACEMENT |
REPLACE ROOF ON HISTORIC EMA BUILDING |
05/20/2013 |
|
Acushnet | FIRE/EMS STATION PRESERVATION |
REPAIR HISTORIC BUILDING - NEW WINDOWS/INSULATION |
05/20/2013 |
|
Acushnet | Long Plain Museum Insulation and Clapboards |
Add blown-in insulation in exterior walls and attic, and replace any broken or damaged clapboards. |
10/21/2013 |
|
Acushnet | PERRY HILL CHURCH RENOVATION #2 |
Continue renovations and repairs to historic church. |
10/21/2013 |
|
Acushnet | Long Plain Museum chimney repairs |
Replace stainless steel liner, change piping from furnace to chimney, clean exterior bricks on the roof and remove the blue stone cap. |
10/21/2013 |
|
Acushnet | Perry Hill Church Renovations #3 |
Additional repairs to historic church. |
05/12/2014 |
|
Acushnet | Bicycle Racks |
6 bike racks installed at various recreation locations throughout town. $2,463.05 was reimbursed by Southeast Regional Planning and Economical Development District. |
05/12/2014 |
|
Acushnet | Howard School Library Relocation Renovations |
Renovate Historic Howard School to accommodate space for Library relocation. |
05/12/2014 |
|
Acushnet | Acushnet Grange #285 Repairs |
Replace 3 doors, repairing and repainting the porch and purchasing materials for and installing a handicap accessible ramp. In exchange, town will enter into grant agreement with Grange #285, and receive a Historic Preservation Deed Restriction. |
05/12/2014 |
|
Acushnet | Perry Hill Church Renovations #3 |
CONTINUE RENOVATIONS |
05/12/2014 |
|
Acushnet | EMA BUILDING REPAIRS |
Replace insulation and sheetrock to make more energy efficient. |
05/12/2014 |
|
Acushnet | GOLF COURSE GARDEN |
POLINATOR GARDEN AT ACUSHNET GOLF COURSE |
10/27/2014 |