To survey and engineer drainage solutions to the existing system at the Park, and to provide for the necessary construction of the drainage system including perimeter drains and inlet upgrades. Project received clearance of land transfer from State to Town (07/10). 2014 still waiting on DCAM.
Project cancelled
05-09-2007
Project Category
Project Details
Housing Units
0
0
0
Acres
0
0
0
0
0
0
CPA Funding
$0
$0
$150,000
$0
$0
$150,000
$0
0
$0
Other Funding Sources Leveraged
$0
$0
$0
$0
$0
Total Project Cost
$150,000
$0
Show fields from Show fields from Show fields from a related table