This project proposes to appropriate $65,000 from the Historic Resources Reserve for installation of a highly efficient electric heat pump HVAC system which will serve the first and second floors as well as other weatherization measures throughout the entire building as identified in an energy audit conducted by the Center for EcoTechnology (CET) on December 13, 2022. Installation of these systems will assist in the preservation of this historic structure through improved temperature and humidity control.
Project in progress
05-16-2023
Project Category
Project Details
Housing Units
0
0
0
Acres
0
0
0
0
0
0
CPA Funding
$0
$0
$0
$65,000
$0
$65,000
$0
0
$0
Other Funding Sources Leveraged
$0
$0
$0
$0
$0
Total Project Cost
$65,000