CPA Projects – Detailed Report


Project Information
NARA Bridge Boardwalk Reconstruction
Acton
53291
2
Funds will be used to replace the 300-foot NARA Bridge Boardwalk that was constructed in 1999. In 2007, extremely high spring water levels lifted the Boardwalk off its footings and permanently damaged the support structure. While numerous repairs have been made since then, the structure is in such a deteriorated state that complete replacement is needed. The Boardwalk is an essential link in the NARA Park accessible walking path system, frequented annually by thousands of park visitors. The new Boardwalk will be constructed by drilling helical piles into the substrate and building a Boardwalk out of durable, long-lasting Trex material.
Project in progress
05-01-2023
Project Category
    Yes    
Project Details
Housing Units
0
0
0
Acres
0
0
0
0
 
0
0
CPA Funding
$0
$0
$155,300
$0
$0
$155,300
$0
0
 
$0
Other Funding Sources Leveraged
$0
$0
$0
$0
$0
Total Project Cost
$155,300
$0
Show fields from Show fields from Show fields from a related table