City/Town Name | Description | Approval Date |
Categories |
|
---|---|---|---|---|
Abington | Dursin Field |
Phase II of funding to repair Dusin Little League Field. Repairs will be to the snack shack, sheds, fields and dug outs. |
05/24/2021 |
|
Abington | Document Preservation |
Digitalization and preservation of various town records |
04/04/2022 |
|
Abington | Mt. Vernon Cemetery Record Preservation |
Digitization and preservation of records from the Mt. Vernon Cemetery. |
04/04/2022 |
|
Abington | Woodsdale Field Updates |
Updates to Woodsdale baseball fields. Updates include major drainage repairs, reseeding and lining. |
04/04/2022 |
|
Abington | Memorial Bridge |
Cost estimate and grant writer to determine the cost of repairs needed for Memorial Bridge at Island Grove. |
04/04/2022 |
|
Abington | Griffin Dairy Farm |
Phase 3 of Griffin Dairy Farm. This phase consist of removal of material on Pattison St side of the farm, additional trails and fencing. |
06/22/2020 |
|
Abington | Dursin Field |
Phase 1 of updates to the baseball field, Dursin Field. Updates will consist of irrigation updates, updates to the dug outs and general repairs to the snack shack. |
06/22/2020 |
|
Abington | Woodsdale School Playground |
New play structure at Woodsdale field |
06/22/2020 |
|
Abington | Document Preservation |
Phase 2 of preserving town records in digital format and sealing records in protective cases. |
06/22/2020 |
|
Abington | Historical Markers |
Restoration of five historical markers located throughout the town. |
05/20/2019 |
|
Abington | Pickleball Courts |
Addition of three new pickleball courts, including fencing, signage, and netting located behind the Senior Center. |
05/20/2019 |
|
Abington | Memorial Building (American Legion) |
Phase III of external repairs to the Memorial Building. Repairs include painting and renovations to the siding of the last side of the building to protect and preserve the structure. |
05/20/2019 |
|
Abington | Island Grove Pond Study |
Study to determine the type of invasive plant species growing in the Island Grove Pond. The study will then be used to determine the method and cost of removing the plants. |
05/20/2019 |
|
Abington | Island Grove Bridge |
Additional funds needed to begin the study of Island Grove Bridge. The study is set to determine the need and cost of restoration. |
05/20/2019 |
|
Abington | Document Preservation |
Digitization and preservation of various town records. |
05/20/2019 |
|
Abington | Griffin Dairy Farm |
Phase III: Additional walking paths and walking bridges added to Griffin Dairy Farm. Fields will be leveled and a walking path with be built around the fields with added wheelchair and stroller access. |
05/20/2019 |
|
Abington | Turntable Park |
Engineering study and excavation of the old railroad turntable located on the Rail Trail. Study will determine if the area can be used to create a park in the future. |
05/20/2019 |
|
Abington | Summer Concerts Pt. 2 |
Additional funds needed to begin work on the entrance and bridge at Reilly Field used for the Summer Concert series. Funds will be put towards an engineering study and a more detailed bridge design. |
05/20/2019 |
|
Abington | Library Story Garden |
Restoration and preservation of library garden. |
05/20/2019 |
|
Abington | Pickleball Courts |
Lighting for town pickleball courts. |
05/21/2018 |
|
Abington | Reilly Track |
Track resurfacing. |
05/21/2018 |
|
Abington | Summer Concerts Pt. 1 |
Lighting installed around open space for town use and summer concerts. |
05/21/2018 |
|
Abington | Memorial Building (American Legion) |
Renovations and updates to exterior of building to help preserve the building. |
05/21/2018 |
|
Abington | DPW Fencing |
New fencing for various town fields and playgrounds. |
05/21/2018 |
|
Abington | Summer Concerts Pt. 2 |
Improvements to bridge and entrance to town open space and summer concert field. |
05/21/2018 |
|
Abington | Griffin Dairy Farm |
Will be adding walking paths, foot bridges, and fields to town owned open space area. |
05/21/2018 |
|
Abington | Memorial Building (American Legion) |
Restoration to Abington Memorial Building. Construction to envelope of building in order to preserve the building. |
06/01/2017 |
|
Abington | DPW Playground |
Replacement of broken playground equipment for Arnold and Laidler Park. Replacement of wood chips and fence at Laidler. |
06/01/2017 |
|
Abington | Griffin Dairy Farm |
Open space walking paths, recreation field space, fencing and parking lot |
06/01/2017 |
|
Abington | Island Grove Bridge |
Study of Island Grove Bridge. Determining what is needed for restoration. |
06/01/2017 |
|
Abington | Open Space/Recreation Plan |
Updated open space/recreation plan |
04/03/2023 |
|
Abington | Green Wave Connector Trail Design |
Design of walking trail connecting Abington High School to Buckboard Lane through existing easement on conservation land. This is phase 1 of a multiphase project. |
04/03/2023 |
|
Abington | Griffin Dairy Farm |
New fencing along walking trails through Griffin Dairy Farm. |
04/03/2023 |
|
Abington | Interpretive Signs |
Interpretive signs for Island Grove Park noting historical significance. |
04/03/2023 |
|
Abington | Historical Inventory |
Match for grant to provide a historical inventory report throughout Abington. |
04/03/2023 |
|
Abington | Island Grove Bridge |
Design of repairs to the historic Island Grove Bridge. This is a multiphase rehabilitation project. |
04/03/2023 |
|
Abington | Island Grove Pavilion Repairs |
Rehabilitation of historic pavilion built in 1893 at Island Grove Park. |
04/03/2023 |
|
Abington | Affordable Housing Trust Fund |
Funds for the Abington Affordable Housing Trust to be used for future housing projects, housing aid for first time homebuyers and repairs to make potential housing projects up to code. |
04/03/2023 |
|
Abington | Housing Trust Action Plan |
Third party report plan to list and prioritize all existing housing needs and potential housing related projects. |
04/03/2023 |
|
Abington | Orchard Lane Land Purchase |
Purchase or acquire two parcels of land located on Orchard Lane for use of conservation land. |
09/27/2022 |
|
Abington | Beaver Brook Playground |
Removal of old Beaver Brook Playground and materials/installation of new playground. Removal of trees and materials around the existing playground to expand the space. |
04/04/2022 |
|
Abington | Affordable Housing Trust Fund |
Affordable Housing Fund to ease home costs for existing residents and/or assist in construction of affordable and senior housing. |
04/04/2022 |
|
Abington | Island Grove Pond Cleanup |
Treatment of invasive plant species growing in the Island Grove Pond. Treatment is based of recommendation from the 2019 pond study completed. |
04/04/2022 |
|
Abington | Island Grove Snack Shack |
Replacement of the Island Grove Pool snack shack |
04/04/2022 |
|
Abington | Softball Fields Updates |
Updates to the Beaver Brook softball fields. Updates include a new backstop, fencing, irrigation and dug out improvements. |
04/04/2022 |
|
Abington | Restoration of the Exedra |
Restoration of the exedra and historical marker for local veterans |
04/04/2022 |
|
Abington | Beaver Brook Playground |
Phase II of funding for removal of old wooden playground, removal of dangerous trees and materials/installation of new playground. |
05/24/2021 |
|
Abington | Griffin Dairy Farm |
Instillation of new well at Griffin Dairy Farm. The well will support the community garden and fields. |
05/24/2021 |
|
Abington | Beaver Brook Playground |
Removal of old Beaver Brook Playground and materials/installation of new playground. Removal of trees and materials around the existing playground to expand the space. |
06/22/2020 |
|
Abington | Affordable Housing Trust Fund |
Affordable Housing Fund to ease home costs for existing residents and/or assist in construction of affordable and senior housing. |
06/22/2020 |