City/Town Name | Description | Approval Date |
Categories |
|
---|---|---|---|---|
Whitman | Inventory of Historic Resources |
The goal of the Inventory of Historic Resources is to support efforts to identify and plan for the protection of the significant historic buildings, structures, archaeological sites, and landscapes in the Town of Whitman. |
05/01/2023 |
|
Whitman | Stetson Terrace Underground Wiring Project |
Currently, the Stetson Terrace development has underground wiring that is deteriorating and needs replacement as soon as possible to avoid the loss of electricity in occupied units. |
05/01/2023 |
|
Whitman | New Picnic Tables for Whitman Town Park |
The picnic tables surrounding the playground area of the playground are in need of replacement. This will replace the older tables and add additional tables that are ADA approved. These new picnic tables will promote family activity at the park and allow everyone to be able to access the park for picnics and social activities. |
05/01/2023 |
|
West Stockbridge | Historical Society |
Renovation of 2 existing bathrooms on the first and second floors of the Historical Society Building at 9 Main Street to be ADA compliant. |
01/10/2023 |
|
Shrewsbury | 1830 Brick Schoolhouse Heatpump |
This project proposes to appropriate $65,000 from the Historic Resources Reserve for installation of a highly efficient electric heat pump HVAC system which will serve the first and second floors as well as other weatherization measures throughout the entire building as identified in an energy audit conducted by the Center for EcoTechnology (CET) on December 13, 2022. Installation of these systems will assist in the preservation of this historic structure through improved temperature and humidity control. |
05/16/2023 |
|
Shrewsbury | Prospect Park Pergola Restoration |
This project proposes to appropriate $85,500 from the Historic Resources Reserve Account to conduct a Site and Structural Assessment of the Prospect Park Pergola which is over 100 years old. The site and structural assessment will be conducted by a Certified Landscape Architect with experience in Historic Preservation. The scope of the assessment will focus on restoration of the pergola, site access and use as community gathering space. Project deliverables will include the site and structural assessment, design specifications, recommendations, and assistance in preparing bid documents. |
05/16/2023 |
|
Shrewsbury | Mt. View Cemetery Historic Gravestones |
This project proposes to appropriate $5,500 from the Historic Resources Reserve Account to conduct an Inventory and Assessment of historic gravestones located in the southeast corner of the Mt. View Cemetery, Sections 1-9. The cemetery is located in the Shrewsbury Historic District and is designated on the State Register of Historic Places and National Register of Historic Places. The Inventory and Assessment will review the current condition of historic gravestones, some of which date to the 1730âs, and prioritize their specific needs for restoration and preservation in accordance with the practices of the United States National Parks Service. |
05/16/2023 |
|
Shrewsbury | District #5 Schoolhouse Facility Review |
This project proposes to appropriate $2,000 from the Historic Resources Reserve to conduct a Facility Review by the Institute for Human Centered Design. The Facilities Review will evaluate ADA accessibility and pedestrian infrastructure of the structure itself as well as surrounding routes and parking. The District #5 Schoolhouse was built in 1828, is the oldest schoolhouse in Shrewsbury and is listed on the State Register of Historic Places and National Register of Historic Places. |
05/16/2023 |
|
Shrewsbury | Arrowwood Park Restoration |
This project proposes to appropriate $40,000 from the Open Space and Recreation Reserve Account for design services for restoration of the playground equipment at Arrowwood Park. The project will redesign the existing playground equipment and surface to provide an improved playground design meeting modern design and safety standards. This park currently serves a large portion of the community, however the current condition deters significant use. |
05/16/2023 |
|
Shrewsbury | Town-wide Playground Assessment |
This project proposes to appropriate $70,000 from the Open Space and Recreation Reserve Account for design services for restoration of the playground at Edgemere Park as well as a town wide assessment of the nine (9) Town parks and six (6) school parks. Many of the playgrounds were built as part of subdivision construction or fundraising done by school PTO groups. The majority of the playgrounds do not have accessible surfaces or modern safety surfaces. The playgrounds do get a lot of use and are typically 15 to 30 plus years old. Play for children is essential for their development of social and motor skills. Designing a new playground at Edgemere Park will align with the Parks Division goals for continuing to improve recreation areas for our community. |
05/16/2023 |
|
Shrewsbury | Dean Park Basketball Courts |
This project proposes to appropriate $375,000 from the Community Preservation Reserve Account for reconstruction of the existing basketball courts. The Townâs 2018 Master Plan indicated the basketball courts were in poor condition and needed to be rebuilt. The courts currently have deep cracks, backboards which need to be upgraded, and fences which are worn. The fenced in courts will also need to have a sidewalk added to make it more accessible. This project will rebuild the three (3) basketball courts, two (2) of which are fenced in. |
05/16/2023 |
|
Shrewsbury | Camp Wunnegan Parking |
This project proposes to appropriate $142,000 from the Community Preservation Reserve Account for design and construction of nine (9) standard and one (1) ADA accessible parking spaces at 645 and 645R Grafton Street fka âCamp Wunneganâ. This will improve accessibility to and use of the associated trail systems for more equitable enjoyment by the community. The proposed design also incorporates improved storm water management systems. |
05/16/2023 |
|
Shrewsbury | Howe/Sears Farm Acquisition |
This project proposes to appropriate $435,000 from the Fund Balance Account for acquisition for conservation purposes under Chapter 44B, parcels of land located at 443 and 457 Lake Street and 104 Grove Street aka the Howe/Sears Family Farm. The proposed project would be the contribution of half of the funds required to purchase the property with the remaining funds provided via American Rescue Plan Act (ARPA) funds. With the purchase of this property the Town hopes to create connectivity between current Town owned land to promote passive recreation, such as walking trails, and preserve open and natural space in Town. These parcels help to create connectivity between Lake Street Park all the way to Camp Wunnegan through sidewalks and walking trails. The Town is working to develop a formal trail network throughout the Town and this project contributes to this effort. The Greater Worcester Land Trust has expressed interest in the project and holding the conservation restriction on the property. |
05/16/2023 |
|
Plainville | Field of dreams design |
Engineering design for expansion of Field of Dreams recreation complex |
06/05/2023 |
|
Milton | Town Lock-Up Bldg Restoration |
Restoration to historic building |
05/01/2023 |
|
Milton | Forbes House Museum |
Restoration of historic building |
05/01/2023 |
|
Milton | Milton Affordable Housing Trust |
Funding to support affordable housing projects |
05/01/2023 |
|
Milton | Milton Garden Club Spalding Garden |
Restoration of historic Spalding Garden |
05/01/2023 |
|
Milton | Turners Pond Path |
Reconstruction of recreational path |
05/01/2023 |
|
Milton | Peverly Park Playground |
Planning and design for construction of new playground |
05/01/2023 |
|
Milton | Wharf Park Plan |
Planning and design for reconstruction of park |
05/01/2023 |
|
Milton | Mary c. Lane Park Baseball Field |
Adding fencing and safety improvements to ballfield |
05/01/2023 |
|
Milton | Middle Gile Sports Complex |
Lighting improvements for safety and energy conservation |
05/01/2023 |
|
Milton | Pickleball Court Study |
Find location for new pickleball courts |
05/01/2023 |
|
Milton | Pope's Poind Pedestrian Bridge |
Design and construct pedestrian bridge |
05/01/2023 |
|
Lancaster | Thayer Memorial Library Window Restoration |
Restore two sets of window casements in the historic wing of the library. |
05/03/2023 |
|
Lancaster | Middle Cemetery Pre-restoration Assessment Plan |
Obtain an assessment of the entire Middle Cemetery to determine where the most urgent areas for restoration. Ancestors of Lancaster's founding families are buried here as well as no less the 37 Revolutionary soldiers and 14 Civil War soldiers. |
05/03/2023 |
|
Lancaster | Thayer Field and Mill St dugout replacement/build |
To provide a safe covered area to provide relief from the weather. Also, to provide equity as the girls' teams do not have such structures. |
05/03/2023 |
|
Lancaster | Thayer Field Fence Replacement |
Replacement of the fencing surrounding the baseball fields. The current chain-link fence has holes and creates safety concerns. The replacement fence will be rubber/vinyl coated, that is more suited to an athletic and the users. |
05/03/2023 |
|
Lancaster | bulfinch Meeting House brick portico restoration |
Restoration of the front and west side porticos, replace broken bricks and relevel the surface and repoint the granite steps. This building is a National Historic Landmark |
05/03/2023 |
|
Lancaster | Resurface infields at Thayer Field and Mill St |
Restore the infields of Thayer Field and Mill St. baseball and softball to ensure a safe area to play games. |
05/03/2022 |
|
Greenfield | Historical Society Document Preservation |
Preservation of documents from the Estate of Peter Miller. |
05/17/2023 |
|
Greenfield | FCAS Barn Rehabilitation |
Rehabilitation of cattle barn roofs at Franklin County Fairgrounds for the Franklin County Agricultural Society. |
05/17/2023 |
|
Greenfield | MOIH Shop Equipment Restoration |
Restoration of antique Goodell-Pratt Light Machine Shop. |
05/17/2023 |
|
Greenfield | CSO Wells Street Shelter Expansion |
Clinical and Support Options is creating 36 studio apartments for permanent support of housing at 60 Wells Street. |
05/17/2023 |
|
Greenfield | Pickleball Court Expansion |
Design, engineering, and site readiness of a multi-court pickleball facility adjacent to Abercrombie Field. |
05/17/2023 |
|
Greenfield | Highland Park Trail Restoration |
Renovation of trails in Highland Park and Temple Woods. |
05/17/2023 |
|
Greenfield | GHS Track ADA Access |
Creation of concrete connection path to provide access to the GHS track and spectator viewing area. |
05/17/2023 |
|
Greenfield | Beacon Park Improvements |
Installation of two new bocce courts and replacement of two water fountains at Beacon Park. |
05/17/2023 |
|
Greenfield | Shattuck Park Fitness Cluster |
Installation of a fitness cluster at Shattuck Park. |
05/17/2023 |
|
Greenfield | Citywide Outdoor Site Amenities |
Installation of interactive play amenities. |
05/17/2023 |
|
Framingham | Framingham Accessible Dock (Waushakum Beach) |
The purchase and installation of an adaptive boat dock at the City Beach at Lake Waushakum, to also include funding of the dock bulkhead and necessary permit expenses for environmental permitting. This project will expand recreational offerings by providing universal access to Lake Waushakum Beach, and opening up boating to people with disabilities, older people and others who might otherwise face barriers to access. This project will complement other efforts to improve the site and will allow more people to enjoy this valued resource. |
04/25/2023 |
|
Framingham | Universally Accessible Walking Trail with Scenic View Platforms on the Carol Getchell Trail |
Construction of an ADA compliant compacted gravel walking path on the north side of the Getchell trail beginning at Little Farms Road, along the Sudbury River, and to build two viewing platforms and ramps, to replace four pedestrian bridges, and to fund the design and permitting. This project, to improve the north side of the Carol Getchell Trail in Saxonville, will expand recreational offerings with universal access. It will open up this natural environment and scenic views along the Federally designated Wild and Scenic Sudbury River to people with disabilities, older people, and others who might otherwise face barriers. |
04/25/2023 |
|
Framingham | Design Study for New Community Garden Sites in Framingham |
The funding will be used to hire a consultant to develop a Community Garden Design Study at two City parks: Bates Road Park and Roosevelt Park. Both are located on the south side of Framingham in environmental justice neighborhoods. The design process will include community participation and various options for site design, and will incorporate accessibility and universal design. The study will also include regulatory permitting and cost estimates for future implementation. |
04/25/2023 |
|
Framingham | Arlington Street Park Construction |
Providing two elements, the playground equipment and a splash pad, including materials and construction, as part of a larger construction program to update the Arlington Street Park. This project to redevelop the Playground and build a Splash Pad at the Arlington Street Park will expand recreational offerings to an underserved community. These improvements are part of a larger effort to revitalize the Park and address the current deteriorated condition, improve accessibility, expand recreational offerings, provide new amenities and furnishings, and increase security at the site. |
04/25/2023 |
|
Framingham | The Academy - Preservation and Accessibility |
The funding will be used for Design Services including site planning and construction documents to facilitate an ADA compliant walkway and public access via the main entry to the historic (1837) Academy Building, as well as plans for restoration of the front portico, and preservation treatment of historic artifacts on lawn of the building. Funding will also be used to widen the interior entry door for ADA compliant access into the building. This site is in the State MACRIS database and on the National Register of Historic Places. |
04/25/2023 |
|
Framingham | Edgell Memorial Library - Preservation and Restoration |
The funding will be used to restore broken historic Minton floor tiles in the main hall of the building, restore damaged walls and replicate an historic stenciled border on main hall walls, and restore damaged walls in the directorâs office, which will eventually become exhibit space. Project funds will also be used for the CPC to hire to an independent historic preservation consultant to ensure that the rehabilitation and restoration will be done in compliance with the Secretary of the Interiorâs Standards for Rehabilitation of Historic Structures. Funding will also pay for structural engineering review of the main hall floor. This site is in the State MACRIS database and on the National Register of Historic Places. This work will address a long-standing need to preserve this historic resource and will help facilitate better use of this space to educate more in the community about Framinghamâs history. |
04/25/2023 |
|
Framingham | Chris Walsh Memorial Trail Design |
The funding will be used to assist in the engineering, design and permitting of the Chris Walsh Memorial Trail, an accessible trail to be constructed in Farm Pond Park, around and through its Ponds, along the Sudbury Aqueduct with connections to Cushing Park and other trail networks. This project will ultimately increase recreational opportunity for all Framingham residents and will support access to this centrally located, highly utilized waterfront recreational park for South Framingham Environmental Justice neighborhoods. |
04/25/2023 |
|
Framingham | 103 Guild Street |
The funding will be used for the purchase of 11.13 acres of undeveloped land in South Framingham for resource protection, stormwater management, and passive outdoor recreation. The parcel, crossed by Beaverdam Brook, is predominantly wetlands and includes 3 to 4 acres of wooded upland and trails. It is part of a larger tract that includes land in Sherborn and Ashland. The site will also offer passive outdoor recreation with its walking trails and potential connections to current and future off-site trails in and beyond the City, thus offering a valuable passive recreation opportunity to nearby economic justice neighborhoods and the larger community. |
04/25/2023 |
|
Framingham | Edgell Grove Cemetery Tomb House Emergency Roof Repair |
The funding will be used for the emergency roof repair of the historic (1885) Tomb House in the Edgell Grove Cemetery; including replacement of the damaged slate roof, flashing, gutters, and downspouts, and associated work. This is the first phase of a long-range plan to repair, restore and repurpose the building, which is listed in the State MACRIS database and on the National Register of Historic Places. This project, to replace the damaged slate roof, underlayment, flashing, gutters, and downspouts of the historic (1885) Tomb House, previously used as a Receiving Tomb at Edgell Grove Cemetery, will help to stabilize an identified cultural resource of the City. |
04/25/2023 |