CPA Projects Database

City/Town Name Description Approval Datesort descending
Categories
Maynard Alumni Field Bleacher Replacement

The Alumni Field Bleacher Design project will fund the design, scope of work, engineering and plans to be used to initiate the procurement process required to begin construction on new bleachers at Alumni Field. The 75% cost allowance accounts for CPC funds to be expended on only CPA eligible aspects of the design process.

05/15/2023
 
Maynard Regional Housing Services Office Membership

The major funding for the Regional Housing Services Office Membership will help the Town of Maynard effectively implement administer and monitor affordable housing projects.

05/15/2023
 
Maynard Concord Circle Door Replacement Project

Funds contribute to the installation of modern, energy-efficient, and accessible exterior doors on the Maynard housing Authority apartments at Powder Mill Circle.

05/15/2023
 
Somerset Pottersville Fields Dugouts

Installation of dugouts and bullpens at Pottersville Field

05/15/2023
 
Somerset Recreation property sign replacement

Installation of entrance/main signs at all Somerset playground and recreation facilities

05/15/2023
 
Somerset Hillside playground and basketball court replacement

Removal and replacement of existing playground equip and basketball court

05/15/2023
 
Somerset Leahy Park basketball court rehab

Rehab and reconfiguration of basketball courts

05/15/2023
 
Somerset Swing set Potterville Field

Removal and replacement of swing set at Potterville Field

05/15/2023
 
Somerset Pierce playground basketball and tennis court maintenance

Rehab of existing basketball and tennis courts. Including striping of tennis courts to include a pickle ball court.

05/15/2023
 
Stockbridge Chesterwood

Restore the brick garden wall.

05/15/2023
 
Stockbridge TOS - Foot Bird Sanctuary

Plant trees and clean up entry. Remove invasive species plants.

05/15/2023
 
Stockbridge Laurel Hill Association - Mary Flynn Trail

Reconstruct damaged infrastructure.

05/15/2023
 
Stockbridge Friends of Gould Meadows

Continuation of invasive plant removal and tree work.

05/15/2023
 
Stockbridge Pine Woods Additional funding

Driveway reconstruction.

05/15/2023
 
Stockbridge Stockbridge Housing Authority

Replace sidewalks and walkways.

05/15/2023
 
Stockbridge Riverbrook Residence

Reconstruct the failing fire escape.

05/15/2023
 
Stockbridge Stockbridge Housing Authority

Replace siding.

05/15/2023
 
Stockbridge Berkshire Waldorf High School

Preservation/renovation of the Old Town Hall in preparation for housing the new Waldorf High School

05/15/2023
 
Stockbridge Stockbridge Library Museum and Archives

Digitize microfilm of historic documents.

05/15/2023
 
Stockbridge TOS Cemetery Committee

Restore / conserve Sergeants' tomb stones.

05/15/2023
 
Stoughton Hansen School Playground Renovations

Reconstruct Hansen School playground. Design will also include drainage design and installation.

05/15/2023
 
Swansea Purchase of Levesque Property Bark St M10 L 3

Purchase of 13.96 acres of land for $4500.00, Map 10 lot 3, listed as 0 E.S. Bark Street from the Open Space Reserve for the purpose of passive recreation and conservation.

05/15/2023
 
Swansea Purchase Hallock Land Richard Rd

Purchase of total 44.8 acres of land off of Richard Rd, Assessors Map 54 Lot 15 and Assessors Map 59 Lots 3,4,9,10,16,and 17 on the Coles River.

05/15/2023
 
West Boylston PRIDE PARK-ADA COMPLIANCE

Additional Funding to bring Pride Park into ADA Compliance

05/15/2023
 
Wilbraham Lighting of flagpole at Bruuer Pond and Glendale Cemetery

Install lighting for two flagpoles for the American flag to be illuminated at night.

05/15/2023
 
Wilbraham ADA Compliant Playground Structures at Mile Tree School

Purchase and install two ADA compliant playground structures for Mile Tree School

05/15/2023
 
Wilbraham Wilbraham Children’s Museum Playground Structure

Purchase and install playground structure at the Wilbraham Children’s Museum.

05/15/2023
 
Wilbraham Wilbraham Children’s Museum Fencing

Purchase and install security fencing to secure gap in existing fencing made by an abutting property.

05/15/2023
 
Wilbraham Water Flow Assessment and Device Installation at 12 Mile Brook

Assessment and installation of a water flow device to protect a bridge from damage of a beaver dam.

05/15/2023
 
Wilbraham Open Space Kiosks, Trail Maps, Trail signs, and Trail Marking

Build 4 area informational kiosks, create and print area maps, create “you are here” signs for complex trail area intersections, and mark trails.

05/15/2023
 
Wilbraham New Access Road Safety Lighting for Spec Pond Recreation Area

Install new lighting for pedestrian safety at the Spec Pond Recreation access road.

05/15/2023
 
Wilbraham Pickleball Courts

Install 4-6 Pickleball courts at a Wilbraham recreation area location.

05/15/2023
 
Agawam Historical Documentation of Joseph and Malvina Beaumier Confectionary Store and Garage

Architectural documentation of the Joseph and Malvina Beaumier Confectionary Store and Garage for the Preservation of Historic Resources

05/16/2023
 
Agawam Historic Graves & Monuments Restoration Phase 2

Restoration and Preservation of historical graves and monuments.

05/16/2023
 
Agawam Thomas Smith House Exterior Preservation

Thomas Smith House exterior preservation

05/16/2023
 
Agawam Hampden County Map Framing

Framing of historical 1855 Hampden County Maps

05/16/2023
 
Holyoke Anniversary Hill Park: Day Brook Parcels Land Acquisition

Project will fund the Acquisition and permanent protection of 7.24 acres of open space forested land (MBP 145-00-094, 146- 00-015, and 127-00-004) associated with one of the headwaters of Day Brook, adjacent to Anniversary Hill Park and Community Field.

05/16/2023
 
Holyoke Wistariahurst Museum Restoration of Damaged Porch Structures

Restoration and replacement of damaged and rotted structural columns and beam on the covered porch for the Pine Street-facing entrance to the Main House Building. This was an emergency application, since the need for this work was revealed during a previously funded project.

05/16/2023
 
Malden Affordable Housing Trust Fund

The goal of this project is to provide resources to the Affordable Housing Trust Fund to increase, preserve, and improve access to affordable housing in Malden.

05/16/2023
 
North Andover Lake Cochichewick Boat Ramp

Continuation of FY 2023 original request which CPC asked to divide into 2 phases This allocation is to finalize the engineering and design work Trailer access would be prohibited other than as needed by the Fire Department Final project could include additional open space to provide more opportunities to view the lake beyond just boat access

05/16/2023
 
North Andover Stevens-Coolidge Ballroom Mural

Project Summary: Restoration of a historic landscape mural in the ballroom of the Stevens-Coolidge estate Key Points: The Trustees have been working to improve public engagement and access at the property This restoration would allow them to eventually open the ballroom to public access As a condition, the committee wanted to see: Improved access to the building for school groups (they have recently hired an education coordinator for that purpose) School administration meetings in the space Coordination with the youth center to get access to kids in need to attend the signature events such as winter lights (beyond what has already been happening) These items will be memorialized in the warrant article and grant agreement

05/16/2023
 
North Andover Parson Barnard House Restoration

Project Summary: Required renovations to the interior of Parson Barnard house. Key Points: Repairs are intended to prevent further deterioration and improve public accessibility to the building.

05/16/2023
 
North Andover North Andover Historical Society Preservation of Historic Artifacts

Project Summary: Restoration efforts to clean, re-house, and conserve NAHS’s collection of historic artifacts. Key Points: These items were previously housed in the basement of the Grange Mold, mildew, and other damage have occurred over time Now that NAHS has a proper space and venue to store and display the artifacts, the time is right to restore them

05/16/2023
 
North Andover Historic Preservation Master Plan

Project Summary: Master plan to review all aspects of North Andover’s historic preservation efforts including assets, processes, and procedures in accordance with the Master Plan Key Points: Grant match to an application to Mass Historic Commission (not a 50/50 split) Strategy point from the 2018 Town Master Plan Intended to give a full 360-degree view of all historic procedures, policies and commissions Will result in report with key assets to protect.

05/16/2023
 
North Andover Stevens Memorial Library Historic Entrance Stairs

Project Summary: Construction phase of Project #1379 to restore the steps to the North side of the Stevens Library Key Points: Supplemental request is due to more accurate costs since bidders have been limited based on the RFP process If they cannot secure bidders, they may then consider an RFQ process They have design documents in place which should help guide them, but the historic nature of the project can make it difficult

05/16/2023
 
North Andover Stevens Estate-Carriage House Stabilization

Matching funds for a Massachusetts Historic Commission grant to stabilize the Stevens Estate Carriage House Key Points: Project will stabilize the structure to prevent further damage Future use of the building is still to be determined, but it will be public

05/16/2023
 
North Andover Second Burying Ground Preservation

Extension of previously approved project to locate and restore headstone footings in the Historic Second Burial Ground on Academy Road Key Points: More work has been uncovered since RCA assumed ownership of the lot RCA commissioned a ground penetrating radar study which uncovered quite a few damaged headstones Unlike Ridgewood, SBG has no source of revenue The goal will be to eventually cover SBG costs through the Ridgewood budget Recently received a $15,000 grant from MHC dedicated to rehabilitate grave sites of Revolutionary War veterans

05/16/2023
 
North Andover Ridgewood Cemetary - Restoration of Boundary Wall

Restoration of boundary walls along the southeast portion of the Ridgewood Cemetery Key Points: Over the years, the boundary walls at Ridgewood have been victim to stone theft With wall footings still in place, these are a restoration rather than a recreation

05/16/2023
 
Shrewsbury 1830 Brick Schoolhouse Heatpump

This project proposes to appropriate $65,000 from the Historic Resources Reserve for installation of a highly efficient electric heat pump HVAC system which will serve the first and second floors as well as other weatherization measures throughout the entire building as identified in an energy audit conducted by the Center for EcoTechnology (CET) on December 13, 2022. Installation of these systems will assist in the preservation of this historic structure through improved temperature and humidity control.

05/16/2023
 
Shrewsbury Prospect Park Pergola Restoration

This project proposes to appropriate $85,500 from the Historic Resources Reserve Account to conduct a Site and Structural Assessment of the Prospect Park Pergola which is over 100 years old. The site and structural assessment will be conducted by a Certified Landscape Architect with experience in Historic Preservation. The scope of the assessment will focus on restoration of the pergola, site access and use as community gathering space. Project deliverables will include the site and structural assessment, design specifications, recommendations, and assistance in preparing bid documents.

05/16/2023
 

Pages

CSV