CPA Projects Database

City/Town Namesort ascending Description Approval Date
Categories
Bedford #13-Shawsheen Pump House-from Hist Prop Preserv Fd

Shawsheen Pump House

01/04/2016
 
Bedford Bicycle Repair Stand

For a secured, outdoor bicycle stand, pump, and tool set which would allow bicyclists to do quick or emergency repairs (tire inflation/repair, brake and shift adjustments, minor tune-up). Expected to be sited along the Minuteman Bikeway at Depot Park.

03/23/2015
 
Bedford Comm/Affordable Housing Consulting Services

Services of housing consultant for community/affordable housing purposes.

03/23/2015
 
Bedford Narrow Gauge Rail Trail

For resurfacing of 10,625 linear feet of the stone dust section of the Narrow Gauge Rail Trail from The Great Road to the end at the Billerica Town Line.

03/23/2015
 
Bedford Historic Properties Preservation Fund

Additional appropriation to the Historic Properties Preservation Fund. Appropriations will be eventually transferred out from this "fund" for appropriation for specific Historic Preservation projects. This is the same method of handling these as for all of the previous "Historic Properties Preservation Fund" projects.

03/23/2015
 
Bedford Washington Street Bridge (foot bridge)

To replace existing (recently condemned) Washington Street foot bridge which is a key link for pedestrian traffic from the surrounding neighborhood to the Town Center, especially for students. Will also improve access to the Minuteman Bikeway Extension and school campuses.

03/23/2015
 
Bedford Town Hall Building Systems Replacement

Remodeling, reconstructing and making extraordinary repairs to the Town Hall. This building had previously been a school in the Town and is historic.

11/06/2014
 
Bedford Municipal Affordable Housing Trust

For 2 Bedford Housing Authority Projects at Ashby Place, an existing public housing complex for low income/elderly/handicapped residents. $88,272 is for replacement of all windows at Ashby Place in order to increase energy efficiency and remove any lead paint and asbestos. $216,000 for refurbishing the original kitchens and bathrooms (c.1969) in 8 Ashby Place units.

11/06/2014
 
Bedford #12-Old Burial Ground Reconstruction-from Hist Prop Preserv Fd

Reconstruction of the Old Burial Ground's southern stone wall using funds previously appropriated into the "Historic Properties Preservation Fund" articles dated 3/25/08. $22,500 was transferred from into this new article for the specific project leaving a balance of $174,099 in the article dated 3/25/08.

09/08/2014
 
Bedford Pedestrian Master Plan

Creation of a long range pedestrian master plan which would improve connectivity through trail development, path enhancements, and sidewalks improvements around Bedford. This master plan is compatible with the goals of the Town Comprehensive Plan.

03/25/2014
 
Bedford Shawsheen Pump House Restoration

Significant exterior preservation work to the 103 year-old historic pump house. Work would include shingles and roofing, rebuilding of the chimney, and repointing of the brick masonry below the windows.

03/25/2014
 
Bedford Historic Properties Preservation Fund

Additional appropriation to the Historic Properties Preservation Fund.

03/25/2014
 
Bedford Irrigation System Refurbishment

To update and refurbish the irrigation systems at Town fields by the DPW, including new clocks with software at 17 locations. This is expected to decrease water usage by approximately 20% and reduce staff time needed.

03/25/2014
 
Bedford Affordable Housing Consulting Services

Continued use of Affordable Housing consulting services.

03/25/2014
 
Bedford Cooling Tower and Pump Renewal-Police Station

Replace Cooling Tower and pump for the historic Police Station building. $15,847 to be paid from CPA and $53,414 from the tax levy.

03/25/2014
 
Bedford Depot Building Exterior Restoration

Final phase of exterior refurbishment of the Passenger Depot Building.

03/25/2014
 
Bedford Town Hall MEP Design

Transferred from Project # 3486 and 6031-Historic Properties Preservation Fund by 2/18/14 vote of Board of Selectmen. Further design services for the historic Town Hall building mechanical, electrical, and plumbing design. Project # 11

02/18/2014
 
Bedford Bicycle Master Plan

Prepare a detailed Bicycle Master Plan to use in the development of safe, functional, convenient, and attractive bicycle facilities throughout the Town.

11/04/2013
 
Bedford Life Management Collaborative-Bedford Housing Authority

Fund a 2-year pilot program to form a collaborative between the Bedford Housing Authority and a social services provider to assist families and individuals who live in Bedford Housing Authority units with obtaining access to various life management skills, job training and educational programs, and job referrals.

11/04/2013
 
Bedford Fawn Lake Conservation Area Management Plan

Shoreline restoration, removal of invasive aquatic vegetation, assessment of trails and public use

11/04/2013
 
Bedford Depot Building Exterior Preservation

Transferred from Project # 3486-Historic Properties Preservation Fund, by 10/21/2013 vote of Board of Selectmen.

10/21/2013
 
Bedford Job Lane House-Reroof South Side

Transferred from Project #3486-Historic Properties Preservation Fund by 4/8/2013 voite of Board of Selectmen.

04/08/2013
 
Bedford Comm/Affordable Housing Consulting Services

Services of housing consultant for community/affordable housing purposes.

04/02/2013
 
Bedford Depot Building Restoration

Restoration work on Depot Park Building

04/02/2013
 
Bedford Town Hall MEP Design

Design of Mechanical, Electrical, Plumbing system for Town Hall.

04/02/2013
 
Bedford Sidewalk Rehab-Great Road

Great Road sidewalk rehab

04/02/2013
 
Bedford Athletic Field/High School-Sabourin Synthetic Turf

Construction/installation of an artificial turf playing surface at Sabourin Football Field.

04/02/2013
 
Bedford Minuteman Bikeway Resurfacing

Resurfacing of the Minuteman Bikepath

04/02/2013
 
Bedford Wilson Mill Dam Landscaping

Final Landscaping of the area around the reconstruction of Wilson Mill Dam. Design & Installation of native plants.

04/02/2013
 
Bedford Tennis Courts-John Glenn Middle School

Reconstruction of tennis courts near Middle School including replacing fencing.

04/02/2013
 
Bedford Depot Station Design Services/Accessibilty and Building Codes

Transferred from Project #3486-Historic Properties Preservation Fund by 1/14/2013 vote of Board of Selectmen.

01/14/2013
 
Bedford Hartwell Town Forest & Jordan Conservation Area Survey

Hartwell Town Forest & Jordan Conservation Area Survey

11/13/2012
 
Bedford Historic Properties Preservation Fund

Additional appropriation to the Historic Properties Preservation Fund.

11/13/2012
 
Bedford Athletic Field/High School Synthetic Turf

Installation of an artificial turf playing surface at Sabourin Football Field.

11/13/2012
 
Bedford Old Water Supply Dam Rehabilitation

Transferred $64,713 from Project #3476 and $10,287 from Project #3486-Historic Properties Preservation Fund by 7/16/2012 vote of Board of Selectmen.

07/16/2012
 
Bedford Springs Brook Park

Feasibility study-various methods to help with water clarity issues of manmade swimming pond.

04/02/2012
 
Bedford Town Hall Multi-Purpose Room Rehab

Design and completion of acoustical treatment, ceiling and window plaster repair, light fixture replacements, sound system upgrades, stair reconstruction and painting. $71,612 transferred out and included in funding of CP-3 Project 42830, voted 11/6/14 for full Town Hall Building Systems replacement (Orig appropriation of $76865, transfer out $71,612, leaving expended balance of $5,253 in original project).

04/02/2012
 
Bedford Job Lane House

Job Lane House reroofing South Side shingled.

04/02/2012
 
Bedford National Historic Register

Application to National Park Service to enlarge the existing National Register District to include homes on Concord, South, Springs Rd, portion of Billerica and Bedford Rail Bed, Fletcher Rd, Crescent Ave and Veterans Memorial Park.

04/02/2012
 
Bedford Conservation Area Signs

Purchase of new signs for the Altmann, O'Connor, Doyle and Mongo Conservation areas.

04/02/2012
 
Bedford Old Water Supply Reservoir Dam/Ring Well Restoration

Reconstruction of Old Reservoir Dam including removal of trees, installation of new spillway, reinforcing up/down stream slopes of Dam and restoration of the ring well.

04/02/2012
 
Bedford Comm/Affordable Housing Consultant

Services of housing consultant for community/affordable housing purposes.

04/02/2012
 
Bedford Town Center Flooring

Removal of existing wood floor, refastening and repair of subfloor/install underlayment, soundproofing and new maple flooring.

04/02/2012
 
Bedford Town Center Exterior Painting

Painting of trim and siding on Union School portion of Town Center.

04/02/2012
 
Bedford Wilson Mill Dam Restoration

Addtional funding for construction of new dam upstream to protect archaeological remains of old dam/mill building & creation of picnic area.

04/02/2012
 
Bedford Old Water Supply Reservoir Dam Signage

New signs for area surrounding the Old Water Supply Reservoir Dam and historic ring well constructed 1908

04/02/2012
 
Bedford Comm/Affordable Housing Consultant

Services of housing consultant for community/affordable housing purposes.

11/07/2011
 
Bedford Land Acquisition Fund

Additional appropriation to the Land Acquisition Fund.

11/07/2011
 
Bedford Historic Properties Preservation Fund

Additional appropriation to the Historic Properties Preservation Fund.

11/07/2011
 
Bedford Sidewalks

New sidewalks as recreational opportunities, in various areas of Town.

11/07/2011
 

Pages

CSV