City/Town Name | Description | Approval Date |
Categories |
|
---|---|---|---|---|
Littleton | SURVEY OF CULTURAL RESOURCES |
UPDATE SURVEY OF CULTURAL RESOURCES |
05/02/2016 |
|
West Newbury | Survey of Historical Properties |
Conduct a survey of historical properties in the town. |
04/29/2019 |
|
Southampton | Survey of immediate needs to stabilize the Old Town Hall |
The historic building, currently known as The Old Town Hall, needs stabilization soon. The front steps cannot be used, bricks are unstable in walls, windows are no longer tight, in addition to other problems. This project would allow for an assessment of immediate needs. |
01/16/2018 |
|
Longmeadow | Survey of Pre-1911 Structures |
2022-2: after the success of the pre-1902 structures' survey, the applicant wishes to create a historical survey of a different decade. |
05/10/2022 |
|
Southampton | Survey of Sczcypta Farm |
While the Town has held this property for some time, a survey indicating wet lands and other geographical factors has not been done. This would allow for better planning for the use of this land. |
01/12/2010 |
|
Mattapoisett | Survey of Town's historic records |
survey by an outside consultant to determine if historic record management and oversight meets the Comm of Mass requirements |
05/09/2022 |
|
Belmont | Survey William Flagg Homer House |
Survey to determine the work needed to maintain the property. The project came in $500 under budget. |
05/01/2013 |
|
Oak Bluffs | Surveying town lots |
Additional funds to pay for surveying work on town owned lots. |
05/28/2018 |
|
Oak Bluffs | Surveying town lots |
Funds from AH Trust to cover revised estimate for surveying work that's part of the Title Research project approved at ATM2016. |
06/27/2017 |
|
Nantucket | Sustainable Nantucker |
Funds for outdoor classroom structure, educational workshops and site manager for farming |
04/03/2018 |
|
Nantucket | Sustainable Nantucker |
Sustainable Nantucket Community Farm Institute, Phase VI ~ Funds for creation of deer fencing, new well and pump for irrigation for back of farm and fruit and berry orchard, including extension of farm electrical system and plumbing infrastructure, split rail fence and vegetative screening to protect other areas of the farm |
05/02/2022 |
|
Nantucket | Sustainable Nantucker |
Funds to enclose and prepare an additional 6.5 acres for farming. |
04/01/2017 |
|
Nantucket | Sustainable Nantucket |
Funds for extension of farm heating system, new bee yard shed, produce preservation equipment and infrastructure. |
06/05/2021 |
|
Nantucket | Sustainable Nantucket |
Phase 4 for extension of farm electrical system and infrastructure upgrades other than for pump |
06/24/2020 |
|
Nantucket | Sustainable Nantucket |
Improvements to farm location |
04/01/2019 |
|
Nantucket | Sustainable Nantucket |
Funds for he creation of a two acre community farm institute on Land Bank property on Hummock Pond Road |
04/06/2015 |
|
Harwich | Sutphin Property: Purchase 2.9 acres property for Open Space |
Purchase 2.9 acres sloping woodland continguous to other Town-owned conservation land. Seller: Sutphin. Assessor's Map # 49 Parcel A2-2 |
05/04/2009 |
|
Peabody | Sutton Room |
Additional appropriation for restoration of historic Sutton Room |
07/15/2003 |
|
Peabody | Sutton Room |
To restore the Peabody Institute Library's Sutton Room. The City also received a Essex National Heritage Area Grant. |
12/05/2002 |
|
Provincetown | Suzanne's Garden |
Preserve an existing garden as open space/recreation |
04/06/2009 |
|
Dennis | Swan Lake Cemetery Repair Historic Gravestones |
To repair Historic Gravestones at Swan Lake Cemetery |
10/16/2018 |
|
Dennis | Swan Lake Gravestone Restoration |
REPAIR AND RESET A NUMBER OF OLD GRAVESTONES IN THE CEMETERY. THE GRAVESTONES SELECTED FOR REPAIR ARE THOSE REMAINING FROM A PRIOR AUTHORIZATION. |
11/16/2010 |
|
Dennis | Swan Lake Gravestone Restoration |
Restoration of ancient cemetery gravestones |
10/16/2007 |
|
Stoughton | Swan's Tavern Preservation |
Acquisition and restoration of the historic Swan's Tavern property located on Turnpike street in Stoughton. |
05/14/2014 |
|
Swansea | Swansea Housing Authoirty Electircal Panel Replacement |
Replacement of unsafe electrical panels in all of 64 units and 8 buildings |
05/20/2019 |
|
Swansea | Swansea Library Painting |
Painting of trim at Historic Swansea Town Library |
06/15/2020 |
|
Swansea | Swansea Memorial Park Playground |
Purchase or recreational playground equipment |
05/16/2022 |
|
Swansea | Swansea Veterans Memorial Park Lighting |
Lighting for ball fields and recreational facilities in Swansea Memorial Park |
05/15/2017 |
|
Duxbury | Swanson Land Acquisition |
For the purchase of 11.5 acres of open space off Franklin Street. Seller: Swanson Realty Trust. Parcel id(s): 014-502-033 |
03/08/2003 |
|
Cambridge | Swedenborg Chapel, Church of the New Jerusalem |
Exterior restoration of significant 1901 late Gothic Revival building, a rare example of Swedenborgian church architecture in Massachusetts, including repair and rebuilding of damaged finials and replacement of slate; restoration of the bell tower, masonry of the left front buttress, bell tower, and front façade; resetting the front steps; and restoration of the wrought iron gates. (NR) |
07/19/2004 |
|
Manchester | Sweeney Park Basketball Hoops |
Basketball hoops for Sweeney Park for recreation. |
04/04/2016 |
|
Manchester | Sweeney Park Bathrooms |
Funds allow for the installation of two permanent bathrooms, ADA compliant. |
04/06/2015 |
|
Manchester | SWEENEY PARK ENGINEERING STUDY |
The engineering study will define the location of wetlands, appropriate parking areas, potential sewer tie in and bathrooms. |
04/06/2015 |
|
Manchester | Sweeney Park Pickleball Courts |
Pickleball courts at Sweeney Park |
06/21/2021 |
|
Manchester | Sweeney Park: Design/engineering for field upgrades |
Design and engineering work for field upgrades at Sweeney Park |
06/21/2021 |
|
Upton | Sweetwilliam Farm - Purchase of land and CR |
Purchased 63.06 acres of farm property and established a Conservation Restriction on another 32.65 acres. Totals 95.71 acres. It includes an easement for a trail that will link town owned land with the Upton State Forest property. This property is also historic since it was owned by relatives of Eli Whitney, including his grandfather and cousin. The purchase was contingent upon a $500,000 land grant from the Massachusetts Division of Conservation Services. The 63 acre parcel now owned by town is known as the Whitney Conservation Area. The town also purchased a parking easement. Assessors Map 5, Parcels 5-4, 5-16, 5-17, and 5-17.1 |
01/11/2011 |
|
Wareham | swift beach engineering plan |
engineering plan for swift beach play area, including access to beach and restrictions to vehicle traffic on beaches |
10/23/2015 |
|
Wareham | SWIFT BEACH PLAYGROUND |
BULD RECREATION AREA AT SWIFT BEACH, INCLUDES PLAYGROUND, BASKETBALL COURT, PICKLEBALL COURTS AND PATHWAYS |
10/28/2021 |
|
Bourne | Swift Memorial Church |
Restoration of the Swift Memorial Church's historic slate roof. |
05/05/2009 |
|
Falmouth | Swift Park Tennis Courts Rehabilitation |
This project includes the removal of two deteriorated tennis courts and fencing and installing two new, post tensioned concrete tennis courts, nets, and black vinyl perimeter fencing. The project construction will be in accordance with ADA and MAAB regulations. |
11/17/2014 |
|
Belchertown | Swift River Elementary School Playground |
To the Cold Spring Swift River PTO for creation of a playground to be used by children ages 2-12 |
05/14/2007 |
|
Belchertown | Swift River Site Study |
Site study for Belchertown Land Trust land on both sides of Swift River: currently a Brownfields project |
05/12/2008 |
|
Falmouth | Swift's Crossing Coonamessett Greenway Heritage Trail and Gateway Park |
This project will construct a 510 foot wetland walkway and river crossing over the Coonamessett River to complete the lower loop of the Coonamessett Greenway Heritage Trail. This project is part of the overall Coonamessett River Restoration Plan. |
11/13/2018 |
|
Easton | Swift's Park Design, Construction & Bid Documents |
Create design, construction & bid documents for Swift's Park. |
05/15/2023 |
|
Wareham | Swifts Beach |
To purchase a parcel on Swifts Beach that would join two parcels already owned by the town and allow for 2,400 feet of conuous frontage at the beach. |
01/01/2004 |
|
Wareham | Swifts Beach settlement |
Eminent domain court-ordered settlement |
10/25/2007 |
|
Edgartown | Swimming Place Path |
Capital Improvements to increase access for passive recreation along Swimming Place Path, an ancient way. |
04/12/2022 |
|
Somerset | Swing set Potterville Field |
Removal and replacement of swing set at Potterville Field |
05/15/2023 |
|
Chatham | Sylvan Gardens ADA Access Trail |
Construction of an ADA compliant trail for access to the Rolf. E. Sylvan Gardens Conservation Area, including benches, informational signs and handicap parking. |
05/09/2016 |
|
Hopkinton | Sylvan Way Conservation Restriction Endowment |
Placement of a conservation restriction on the Sylvan Way Open Space |
05/04/2015 |