CPA Projects Database

City/Town Name Description Approval Date
Categories
Manchester Town Hall Boat Ramp

Rehabilitation of the town's boat ramp for recreation.

04/06/2015
 
Manchester Town Hall Boat Ramp

Town Hall Boat Ramp engineering and permits for the repairs to the boat ramp.

04/07/2014
 
Barnstable Town Hall Building Improvements

Funding will cover soft costs and construction costs for professional roof and foundation assessments, brick and tuck pointing repairs and the replacement of 22 unsafe windows.

07/31/2007
 
Bedford Town Hall Building Systems Replacement

Remodeling, reconstructing and making extraordinary repairs to the Town Hall. This building had previously been a school in the Town and is historic.

11/06/2014
 
Hamilton Town Hall ceiling

To fund the repair of the 1898 plaster ceiling of the second floor of the Town Hall

05/07/2007
 
Edgartown Town Hall Ceiling & Front

To historically preserve the arched ceiling of the Town Hall and additional funds for the facade of Town Hall due to finding rot when original preservation project started.

12/09/2008
 
Bedford Town Hall Chimmey Repointing

To fund the chimney repointing at Town Hall

03/29/2011
 
Georgetown Town Hall Chimney

For the repair of one of the chimneys at Town Hall

05/07/2007
 
Provincetown Town Hall Clock

To restore the clock on the Town Hall

04/04/2007
 
Hadley Town Hall Columns

Additional funds for preservation and/or rehabilitation of the historic four pillars in front of Town Hall

10/16/2021
 
Hadley Town Hall Columns

Repair and restore the four columns at the Town Hall

05/03/2018
 
Belmont Town Hall Complex Slate Roofs

The scope of the project is to stop the water intrusion from the slate roofs into the buildings in the Town Hall complex. The scope of the project will include, at a minimum, the following: 1. Identify active roof leaks caused by failures of slate, rubber membrane or copper flashing 2. Repair the leaks to stop further deterioration of the structural dimensional lumber that has been exposed to many years of water intrusion. Leaks could be caused from missing or cracked slate, copper that has become permeable, failed flashing around chimney and pipe penetrations. Areas of greatest concern include the valleys, hips, rafters, and deck sheeting 3. Repair and or replace wood that is water-logged, contains black mold, or is structurally compromised 4. Install Grace “Ice and Water Shield” membrane where necessary to replace damaged material 5. Reinstall original slate that has been saved 6. Remove and replace any wet insulation 7. Repair damaged original horsehair plaster with like kind and paint to match 8. Remove equipment from the roof(s) and repair leaks under them

05/06/2019
 
Provincetown Town Hall Corridor Cases

Construction of moveable cases for displaying historic documents and small objects

04/04/2011
 
Royalston Town Hall Cupola & Dormers

Restore cupola & dormers on historic district town hall

04/18/2013
 
Rowley Town Hall Cupola and Clock

Reconstruct rotting cupola and repair clock, which are historical features of Town Hall

05/03/2010
 
Stoughton Town Hall Cupola and Cornices Rehabilitation

Repair, paint and preserve Town Hall cupola and cornices

05/14/2018
 
Nahant Town Hall Cupola Restoration

Restoration of Town Hall Cupola

04/30/2016
 
Templeton Town Hall Cupole Restoration

Restoration of the cupola atop the historic culturally significant Town Hall building in East Templeton.

05/10/2023
 
Harvard Town Hall Debt service

Debt payment on bonds for the restoration of Town Hall

04/01/2017
 
Westford Town Hall Design

For the design, engineering and providing detailed costs estimated for renovations and/or upgrade to the current Town Hall and any other related costs from Historic Reserve.

10/20/2008
 
Stow Town Hall Design Funds

Funds are needed to explore the exterior and interior to determine how to restore the worn down building.

05/07/2018
 
Barnstable Town Hall Door

To fund preservation of the Town Hall Door and Entryway from the Village Green by refurbishing the existing exterior doors and frame. This building is located within the Hyannis Main Street Waterfront Historic District. and is on the National Register.

01/18/2007
 
Belmont Town Hall Door Remediation

Rehabilitate six historic town hall doors. As of 8-18-15, the project has been completed. $129.50 to be transferred back to the CPA Fund.

05/01/2013
 
Royalston Town Hall Elevator

To install an elevator in town hall to reach 1st, 2nd and stage area for individuals requiring assistance and to complete project to ensure town hall maintains historical status.

05/06/2016
 
Hamilton Town Hall energy audit

To fund an energy audit of the Town Hall

05/07/2007
 
Mendon Town Hall Engineering for elevator

To fund the schematics and design options for the elevator and rear entrance area of the historic Mendon Town Hall

11/14/2022
 
Cohasset Town Hall Entrance

To fund the restoration of the entrance doors of the antique portion of the Town Hall

04/01/2006
 
Hull Town Hall Entrance Rehabilitation

Appropriate $45,000 from the Community Preservation Historic Reserve to be used by the Town of Hull for the Town Hall Entrance Rehabilitation located at 253 Atlantic Avenue

05/03/2021
 
Arlington Town Hall Envelope Preservation, Phase 1 (Town Hall Clock Tower), Town of Arlington

The Robbins Memorial Town Hall was built in 1912 and serves as Arlington’s center of civic activity. This architecturally-significant building is owned by the Town of Arlington and protected by a preservation restriction and needs reinvestment following over a century of service and decades of deferred maintenance. The entire building envelope, including the limestone façade, terra cotta Clock Tower, wooden windows and doors, and various roofing membranes need repair or replacement. Principal Patrick Guthrie conducted a preliminary assessment and prepared a preservation plan for the envelope of Town Hall. The most pressing findings relate to the dire conditions of the Clock Tower, which is losing structural integrity and causing water penetration affecting the building interior, specifically the Lyons Hearing Room. The first goal would be to complete a comprehensive 3D laser scan of the Clock Tower that will capture shape and dimensional information for the structure and its various ornate elements. The existing Clock Tower would also be safely removed and the opening into the attic would be roofed over to protect the interior from further damage. The laser scans would then be used during later phases to design and fabricate new elements off-site for reconstruction of the Clock Tower at a later date. The proposed FY2024 CPA funding would facilitate execution of this crucial preservation work. Because of the severity of the current condition, the Town has tarped the structure to stem the rapidly-worsening conditions inside the building. Beyond the Phase 1 work to be funded by the proposed CPA award, the consultants estimate that the entire exterior renovation project will be approximately $8–10M. Phase 1 intends to stabilize the structure, allowing the Town to develop a plan and timeline to fund the remaining work, likely via a borrowing supported over time by CPA funding and the Town’s Capital Plan.

05/15/2023
 
Hopkinton Town Hall Envelope Repair; Phase II

Continuation of preservation of Town Hall, including slate roof, mortar and brick preservation; overall goal to preserve a historic structure and address the need for proper archival space

05/07/2013
 
Stoughton Town Hall Exterior

Design, repair and paint exterior of Town Hall

06/06/2011
 
Nahant Town Hall Exterior Balcony

Preserve exterior balcony and balustrades

04/26/2014
 
Barnstable Town Hall Exterior Envelope

Restoration of historic Barnstable Town Hall based on teh report submitted by the CPC Historic Consultant - consisting of roof, brick, windows, exterior door and other exterior repais and replacements for the preservation and rehabilitation of the building

10/01/2009
 
Manchester Town Hall Exterior Painting

Painting of the exterior of Town Hall.

04/04/2016
 
Belmont Town Hall Exterior Railings Improvements

The exterior historical ornamental iron railings system on the Concord Avenue side of Town Hall has fallen into significant disrepair. The two upper portions of the railing system are of a condition where refurbishment consisting of a thorough grinding, priming and repainting can bring them to a suitable finish. The lower portion of the railing measures 40 feet in length. This section of railing is significantly deteriorated, rendering it in need of replacement rather than refurbishment. The project will attempt to replace this section with new, historically accurate ornamental iron railing in the same location, and of the same style.

05/02/2016
 
Wareham Town Hall exterior renovations

To replace two rubber roofs on the historic Wareham Town Hall. Also to re-glaze all windows and paint / preserve all exterior wooden surfaces.

10/24/2011
 
Easton Town Hall Exterior Restoration Supplemental Funding

Supplemental funding for comprehensive exterior Town Hall restoration to allow completion of original $1.45 million November 2020 project following pandemic-related cost increases.

05/16/2022
 
Needham Town Hall Feasibility Study

To conduct a feasibility study analyzing options for renovating the Town Hall

05/16/2007
 
Nahant Town Hall Flag Pole Restoration

For restoration work on the flag pole located outside of Town Hall.

05/21/2022
 
Hopkinton Town Hall Foundation

Funds to preserve and restore the Foundation of Town Hall

05/05/2008
 
Hopkinton Town Hall Foundation

Phase II funding for the resteration & Preservation of the Claflin Memorial Fountain

05/03/2010
 
Granville Town Hall front door restoration/replacement

funds to pay for construction of new front doors for Town Hall using the current doors as a template for historical design reproduction.

05/09/2016
 
Boxborough Town Hall front steps

Additional Funding for Restoration of Front Steps

05/09/2016
 
Boxborough Town Hall front steps

Rehabilitate steps for historical accuracy and safety.

05/12/2015
 
Hamilton Town Hall Front Steps Replacement

Includes the demolition of the existing concrete steps and replacing them with granite.

10/17/2009
 
Northfield Town Hall Front Steps Restoration

Complete restoration of the historically inaccurate and crumbling Town Hall front steps.

05/02/2011
 
Bourne Town Hall Furnace

To replace the boiler in the historic Town Hall

05/09/2006
 
Nahant Town Hall Gables

Town Hall preservation; develop required engineering specifications ($5,000) necessary to implement the repair of the failing gable arches ($25,000) as applied for by the Town

04/27/2017
 
Ayer Town Hall Generator

Generator for town hall to avoid damage to plaster in the event of burst pipes.

10/24/2011
 
Northborough Town Hall gym floor

For the replacement of the Historic Town Hall gym floor

04/23/2007
 

Pages

CSV