City/Town Name | Description | Approval Date |
Categories |
|
---|---|---|---|---|
Quincy | United First Parish Church Bell Tower Paint Project |
The exterior paint is currently chipping on the bell tower . The bell tower is a focal point in the downtown area. This project will take four weeks and will not require scaffolding. |
06/20/2023 |
|
Quincy | United First Parish Church Crypt Handicapped Accesibility |
To construct handicapped accessibility structures for public access to the historic Adams Family crypts located beneath the now United First Parish Church. |
05/01/2018 |
|
Quincy | United First Parish Church Master Facilities Plan |
Develop a master facilities plan for the United First Parish Church. |
06/05/2017 |
|
Nantucket | United Methodist Church |
For continued restoration of the United Methodist Church |
04/09/2007 |
|
Nantucket | United Methodist Church |
Continuation of the United Methodist Church Restoration |
04/15/2003 |
|
Nantucket | United Methodist Church |
For continuation of restoration of the Union Methodist Church |
04/03/2006 |
|
Nantucket | United Methodist Church |
For the restoration of the historic United Methodist Church |
04/15/2002 |
|
Nantucket | United Methodist Church |
Additional funds for preservation of the Historic Methodist Church Building. |
04/15/2005 |
|
Oak Bluffs | United Methodist Church Stained Glass Restoration |
Continued restoration of Trinity church stained glass windows. |
04/09/2013 |
|
Oak Bluffs | United Methodist Church Stained Glass Restoration |
Repairmore of the church's stained glass windows |
04/10/2012 |
|
Oak Bluffs | United Methodist Church Stained Glass Restoration |
Continuation of project to restore the stained glass windows on the exterior of Trinity Church. |
04/14/2015 |
|
Westford | United Methodist Church Stained Glass Windows & Frames |
For the restoration and preservation of stained glass windows and frames at the historic United Methodist Church at Graniteville and any other related costs. |
03/22/2014 |
|
Easton | Unity Church preservation project |
Additional Funding for Historic Preservation Activities at Unity Church |
10/05/2009 |
|
Easton | Unity Church preservation project |
To fund historic preservation activities at the Unity Church |
05/15/2006 |
|
Boston | Unity Sports And Cultural Club Restoration |
To rehabilitate and restore the Unity Sports and Cultural Center building by funding masonry repairs and the addition of a new roof and drainage system as well as the creation of a conditions assessment. |
04/12/2023 |
|
Georgetown | Universal Access Trails Feasibility Survey |
âUniversal Access Trails Feasibility Surveyâ. To see if the Town will vote, pursuant to G.L. c.44B, to appropriate from the Community Preservation Fund Community Preservation Open Space/Recreational Land Reserve Account the amount of $30,000.00 (Thirty Thousand Dollars) to fund a study for the identification of the optimum location for, and the design and development of, a Universal Access Trail to be created on existing Conservation and Active Recreational Town Lands, including the costs incidental and related to the engineering, legal, permitting, and development of the ultimate location; the study shall include, but is not be limited to, preparation of an analysis of the potential physical, environmental, and property ownership constraints, as well as the opportunities and advantages affecting different sites for the development of trails, and will be developed in relation to the existing 2019 Open Space Linkage Analysis report (OSLA) and Trail grading, materials, and amenities, and designed to accommodate universal access, including access for wheelchairs and those who are visually impaired; said trail will be developed for the broader goal of establishing a community open space network and an economic development plan to attract visitors to the area by highlighting Georgetownâs natural splendor as well as to enhance the quality of life for Georgetown residents and visitors; and further, to authorize the Board of Selectmen, Parks and Recreation Commission, and Conservation Commission, to enter into all agreements and execute any and all instruments for any grants to defer the costs associated with this study; any funds from this appropriation remaining unspent after a period of 3 (Three) years from the date of the approval of this article will be returned to the Community Preservation fund only after a vote by the Community Preservation Committee determining that it is unlikely the remaining appropriated funds will need to be spent to this effect; or take any ot |
06/15/2020 |
|
Sturbridge | Universal Trail Assessment Process Software and Survey Kit |
Recently developed American with Disabilities Act (ADA) accessibility guidelines require specific Trail Access Information (TAI) to be posted at trail heads. This kit will allow volunteers, under supervision of a certified UTAP person, to assess trail access. The software will provide an electronic file for trail management and maintenance. |
06/01/2015 |
|
Gloucester | Universalist Meetinghouse Resoration Phase II |
Built in 1805-06 the Meetinghouse is listed on the National Register of Historic Places and is the oldest standing church in Gloucester. It is an often-cited example of a design popularized by an early American architect, Asher Benjamin. the 155-foot lantern tower lighted at night is an iconic symbol of the City and has guided mariners in to Gloucester Harbor for more than 200 years. The Meetinghouse hosts dozens of public events each year including theatrical and musical performances, lectures, benefit events and group meetings. The Sanctuary and other areas where these events are held are now inaccessible to persons unable to navigate stairs. CPA funding will help make this historically important building accessible to persons with disabilities, through the installatin of a platform lift elevator to serve both a downstairs Vestry and the 300 seat main Sanctuary above. Lavatories for use by persons with physical disabilities will also be constructed. |
01/28/2011 |
|
Framingham | Universally Accessible Walking Trail with Scenic View Platforms on the Carol Getchell Trail |
Construction of an ADA compliant compacted gravel walking path on the north side of the Getchell trail beginning at Little Farms Road, along the Sudbury River, and to build two viewing platforms and ramps, to replace four pedestrian bridges, and to fund the design and permitting. This project, to improve the north side of the Carol Getchell Trail in Saxonville, will expand recreational offerings with universal access. It will open up this natural environment and scenic views along the Federally designated Wild and Scenic Sudbury River to people with disabilities, older people, and others who might otherwise face barriers. |
04/25/2023 |
|
Norwood | University Avenue Trail Design Study |
Contract with an engineering firm and/or land use consultant to review the conservation land on University Avenue in order to: (1) report on the feasibility of constructing a trail through the property; (2) identify site features and potential issues; (3) flag wetland resource areas as necessary; (4) evaluate potential connections to abutting or nearby properties: (5) consider infrastructure needs such as access and parking; and (6) provide an initial trail design and layout for a recreational walking trail through the property. |
05/10/2021 |
|
Nantucket | University of Florida Preservation Institute |
3D laser scanning of Historic building for public access |
04/02/2013 |
|
Nantucket | University of Florida Preservation Institute |
Phase II Scanning of Heritage Resources |
04/06/2015 |
|
Nantucket | University Of Florida Preservation Institute Nantucket |
Document Historic Nantucket waterfront, identify vulnerable areas, streets, properties and resources and time frame of increased flooding and create tools to assist the community to make informed decisions about protection and adaptation. |
04/01/2017 |
|
Marshfield | Unknown Owners Title Search |
Search for unknown owner land parcels for open space |
10/10/2007 |
|
Templeton | Update Affordable Housing Plan |
Engage Regional Planning Commission to update Templeton Affordable Housing Plan |
05/11/2011 |
|
Easton | Update Affordable Housing Production Plan |
Funding for consultant to update Easton's affordable housing production plan |
05/17/2010 |
|
Belchertown | Update Appraisal of Mader Forest |
Funds will be used to update an appraisal of Mader Forest to enable the Conservation Commission to apply for a land grant for acquisition of Mader Forest. |
05/08/2017 |
|
Cohasset | Update Deer Hill, Osgood, Sohier & Beechwood playgrounds |
Bring playgrounds to Mass handicap regs |
05/01/2017 |
|
Arlington | Update Historic Resources Inventory |
To successfully preserve and enhance Arlingtonâs historic heritage, there must first be an accurate record of the townâs historic resources. As called for in the recent Master Plan, this project would update the townâs Inventory of Historically or Architecturally Significant Properties. The inventory, a very important reference for town officials, residents and community groups, is currently out of date, incomplete, and in some cases inconsistent with state records. An important part of the study is an historic structures report for the older section of the High School. It will establish baseline information that can be used in the feasibility study for rebuilding the school. 7/2022 Update . Since receiving the project funds, 135 Massachusetts Historical Commission (MHC) Inventory Forms B were completed for properties in the neighborhoods south of the High School and the Survey Master Plan was completed. No historic structure report for the High School was completed. The DPCD determined the project could not continue until such time that the AHC process becomes clearer for all involved, especially the property owners that are potentially subject to future review. Remaining funds were returned to the CPA fund. |
05/08/2017 |
|
Marion | Update Marion Open Space Acquisition plan |
update the Marion open space acquisition criteria |
05/09/2022 |
|
Marion | Update of the Town of Marion Housing Production Plan (HPP) |
To hire Southeastern Regional Planning and Economic Development District (SRPEDD) to assist the Trust in updating the Town of Marion Housing Production Plan for 2020. |
06/22/2020 |
|
Needham | Update Open Space and Recreation Plan |
5 year update of Open Space and Recreation Plan |
05/13/2013 |
|
Stoughton | Update Open Space and Recreation Plan |
Procure professional services to update Stoughton's Open Space and Recreation Plan |
05/21/2012 |
|
Tyngsborough | Update Open Space and Recreational Plan |
Update Open Space and Recreational Plan |
05/16/2017 |
|
Groveland | Update the Open Space and Recreation Plan |
To Update the town's OSRP. The current plan expires in 2019. |
04/30/2018 |
|
Tyngsborough | Update Tyngsborough Weed Control Program |
Update Tyngsborough Housing Plan |
05/16/2017 |
|
Upton | Update walkway at Kiwanis Soccer Field to meet ADA requirements |
Walkway from parking area to soccer field does not meet ADA requirements. Slope needs to be adjusted and railings added. |
11/17/2017 |
|
Norfolk | Updated Open Space and Recreation Plan 2023 |
Allocate $60,000 for an update of the Norfolk Open Space and Recreation Plan |
05/17/2023 |
|
Marion | Updating and Expansion of Marion Historic and Cultural Resource Inventory |
To further identify and document the town's historic and cultural resources, to inventory them according to state standards for digitizing cataloging, with the eventual goal of developing a Preservation Plan with priorities for protection of the Town's many unique and important historic resources. |
06/22/2020 |
|
Carlisle | Updating Historic District Map |
To Update 30 Year Old Historic District map & build inventory of Carlisle's Historic District, along with digital photographic file & an illustrative rendering of the Historic Town Center. |
10/17/2020 |
|
Westport | Updating Historic Inventory |
Updating, correcting and completing Westport Historic Inventory |
05/26/2009 |
|
Southwick | Updating the Housing Portion of Town Of Southwick Master Plan |
Updating the information to the Town of Southwick's Master Plan in concerns to the housing section. |
05/18/2021 |
|
Hatfield | Upfront costs to acquire open space and recreation resources. |
Upfront legal, feasibility study, appraisal and other project-related costs to acquire, create and/or preserve open space and recreation resources eligible for C.P.A. funding. |
05/11/2010 |
|
Boxford | Upgrade B2B Trail from Pye Brook Lane to Town line |
To upgrade the surface of the existing B2B Trail from dirt to stone dust in the area between Pye Brook Lane and the Boxford/Topsfield Town line. |
05/14/2019 |
|
Sudbury | Upgrade Existing Town Hall Vaults |
Upgrade two existing vaults in the Town Hall with climate control, fire suppression and shelving. |
04/06/2010 |
|
East Longmeadow | Upgrades to Carriage House on Norcross Property |
Upgrades made to the paint and exterior door area, to bring back up to historical standards. |
04/13/2021 |
|
Bourne | Upgrading of Electrical Service(s) |
Upgrade the Electrical Service at the Continental Apartments. |
05/03/2010 |
|
Boston | Uphams Corner Comfort Station |
Final gap funding to complete the restoration of the 1912 Comfort Station building in Uphams Corner a 1900-square-foot, severely distressed building that has been vacant for nearly 40 years. Built by Dorchester architect William Besarick, it served as public bathrooms for commuters traveling on an expanding streetcar network. |
06/20/2018 |
|
Yarmouth | Upper Bass River Watershed Restoration |
Preliminary bridge design for Weir Road; bog restoration design and permitting. |
04/25/2023 |
|
Yarmouth | Upper Bass River Watershed Restoration |
Engineering design and permitting for watershed restoration. Permitting substantially complete. |
04/26/2022 |