CPA Projects Database

City/Town Name Description Approval Date
Categories
Lenox Yokun Ridge Trail

Creation of through-trail for hiking, connecting lands owned by the Town of Lenox, BNRC and Mass Audubon-part of a larger High Road project.

05/02/2019
 
Seekonk Young Farm

Property consists of 20.55 acres, including 7 acres of fields. 12 acres of prime soils abd 5 acres of forest. Seller: Richard and Marilyn Young. Plat 16, Lot 82. Deed: BK23454/PG149

05/15/2016
 
Randolph Young School Tennis Courts

Since the resurfacing of the Young School Tennis Courts back in 2015, the courts have grown even more popular than they were before. Due to regular usage, wear and tear and the weather, the courts need to be completely removed and redone. The current asphalt will be removed and a new court installed and lined and striped for 3 courts. The fencing will also need to be repaired where it can be or replaced. The DPW will be involved with this project to help when they can.

09/14/2020
 
Holliston Youth Baseball Field Renovations

Appropriation of $100,000 in Fiscal Year 2020 from the Community Preservation Fund’s General Reserve for the purpose of assisting the Holliston Parks and Recreation Department with the rehabilitation of seven youth baseball/softball fields owned by the Town. Fields are located at Stoddard Park, Goodwill Park, Mission Springs, Patoma and Adams. Original appropriation $100,000. $28,901 in surplus funding returned to General Reserve at 5/15/2023 town meeting.

10/28/2019
 
Berlin Youth Baseball Scoreboard and Announcer's Booth

Construction, equip and install an announcer's booth and electronic scoreboard.

11/08/2021
 
Nantucket Youth Fields

construction of project field house for multi-use field complex on nobadeer farm road, phase4

03/31/2012
 
Nantucket Youth Fields

Construction of Fields for various sports on Islasnd

04/07/2008
 
Nantucket Youth Fields

For the construction of a new youth playing field

04/09/2007
 
Nantucket Youth Fields

Creation of entry and parking for multi-use field complex on Nobadeer Farm Road, Phase 3

04/04/2011
 
Nantucket Youth Fields

To design playing fields

04/03/2006
 
Wareham YOUTH SOCCER FIELDS

creation of 5 soccer fields on town owned land

10/30/2019
 
Newburyport YWCA Affordable Housing Strategic Planning

To fund an Affordable Housing Strategic Planning Study for the YWCA

08/13/2007
 
Newburyport YWCA at Hillside

To support the creation of ten (10) affordable housing units. Of these ten units, six (6) will be reserved for individuals whose income falls at or below 30% Area Median Income (AMI) and four (4) units will be for individuals whose incomes falls at or below 50% AMI. Two (2) units will be created for handicap accessibility.

08/29/2016
 
Newburyport YWCA Housing Development

Funding used to support design services associated with the expansion of a CPA-supported proposal to add 1 - 2 additional affordable units to an existing YWCA property. The Zoning Board approved plans to add 5 additional units in September 2008.

08/11/2008
 
Newburyport YWCA Housing Development

Funds to support architectural and engineering services associated with the design and permitting of additional affordable units at an existing YWCA property.

01/14/2008
 
Newburyport YWCA Housing Development

YWCA will use appropriation to leverage additional state and private funding for expansion of its Market Street housing development - adding five deed-restricted units and renovating the existing five affordable units.

08/29/2011
 
Newburyport YWCA of Greater Newburyport for the YWCA at Hillside project

In 2016, YWCA was awarded $150,000 of CPA funds to develop the YWCA at Hillside. Since then, the project has experienced some delays. The overall planning for Hillside Center for Sustainable Living took longer than anticipated after permitting was completed. One of the major changes which resulted from the project planning phase was to adopt the Passive Housing Institute Standards of the US. Hillside decided to develop the project in compliance with these, more rigorous, standards which was not originally anticipated. These design changes contributed to the delay in construction of YWCA at Hillside. YWCA at Hillside, when completed, will be a 10 unit lodging house that is designed to meet Passive Housing Institute Standards of the US and be net zero. This led to a series of engineering issues that needed to be solved, for example, air flow, heating, cooling and de-humidification. Both the delays themselves and the technical solutions to the mechanical issues resulted in additional costs to the project. The YWCA is requesting CPA funding to help close project funding gaps.

09/27/2021
 
Cambridge YWCA Shelter

Exterior renovations to 1869 mansard

09/15/2014
 
Newburyport YWCA Single Room Occupancy Unit and Energy Upgrades

YWCA of Greater Newburyport will increase the number of available SRO units (from 10 to 11) and complete required upgrades throughout the existing building. The project includes: bathroom renovations, structural improvements (steel columns and treatment of powder post beetles), soundproofing and a new, energy-efficient heating system.

03/29/2010
 
Newburyport YWCA Women's Residence

The CPA funding will be used in support of the YWCA 13 Market Street structure for plumbing, new fixtures, new flooring, repair and painting of the walls, and replacement of furniture in the common areas

08/13/2018
 
Newburyport YWCA Women's Residence

repaint the women’s residence at 13 Market Square

07/10/2017
 
Newburyport YWCA Women's Residence Roof Replacement

Replacement of the existing roof on the rear portion of the building and add “ice breaks” to the new roof on the front portion of the building

05/27/2014
 
Hadley Zaskey APR

APR

05/03/2012
 
Hadley Zatyrka Park

$32,000 for finishing construction of Zatyrka Park. The motion was approved 7-1-1 abstaining

05/02/2019
 
Hadley Zatyrka Park

restore and rehabilitate the property known as Zatyrka Park, located at 60-68 Huntington Road.

10/05/2017
 
Hadley Zatyrka Park

Rehabilitation of vacant Town owned land into a neighborhood park.

05/05/2016
 
Hadley Zatyrka Park equipment

To transfer $24,100 in CPA funds to the Hadley Park and Recreation Commission for improving Zatyrka Park with Playground equipment, benches, and a covered picnic table area and any and all expenses incidental thereto.

05/05/2022
 
Hadley Zatyrka Park phase 2

$32,000.00 from CPA General fund to Hadley Park and Recreation department for completion of Zatyrka Park.

05/02/2019
 
New Bedford Zeiterion Theatre Marquee Project

The Zeiterion Performing Arts Center is seeking to return a historically appropriate marquee to the front of its building for the first time since the mid-20th century. The proposed scope of this project includes engineering and installation study, the design and production of a marquee, and the physical installation of the marquee. The marquee will feature a historically accurate appropriate design combined with modern functionality that will further define and enhance the historical character of the theatre and the neighborhood.

08/16/2018
 
New Bedford Zeiterion Theatre Marquee Project

The Zeiterion Performing Arts Center is seeking to return a historically appropriate marquee to the front of its building for the first time since the mid-20th century. The marquee will feature a historically accurate appropriate design combined with modern functionality that will further define and enhance the historical character of the theatre and the neighborhood. This project will fund the next phase in the construction of the marquee.

05/09/2019
 
Hadley Zgrodnik APR

Preserve 30.2 Acres of Open Space off Knightly Rd. Seller: Joseph F Zgrodnik

05/05/2011
 
Pittsfield Zion Lutheran Church Roof Replacement

Zion Lutheran Church has become a vital multi-use space in Downtown Pittsfield. However, failures in the existing roof are putting the historic interior of the church at risk. This project involves the replacement of a failing modern asphalt shingle roof with a more historically appropriate material.

06/25/2019
 
Barnstable Zion Union

To preserve the historic structure as a museum dedicated to celebrating the cultural and ethnic diversity of the community

06/15/2006
 
Barnstable Zone 1 Land Acquisiton Program

Funding for the initial costs related to acquisitions for properties that lie within the Zone 1 area around the Hyannis water supply wells that are privately owned at this time.

09/12/2013
 

Pages

CSV