CPA Projects Database

City/Town Name Description Approval Date
Categories
Randolph Stetson Hall Entrance Project

The east entrance at Stetson Hall is deteriorating and in need of new decking, walkway, steps and benches along with trim, framing and lattice. The Trustees will hire someone to remove and replace these areas with composite board decking and pressure treated lumber. The Historical Commission has approved the materials and colors.

09/14/2020
 
Randolph Young School Tennis Courts

Since the resurfacing of the Young School Tennis Courts back in 2015, the courts have grown even more popular than they were before. Due to regular usage, wear and tear and the weather, the courts need to be completely removed and redone. The current asphalt will be removed and a new court installed and lined and striped for 3 courts. The fencing will also need to be repaired where it can be or replaced. The DPW will be involved with this project to help when they can.

09/14/2020
 
Randolph Town Hall Rehabilitation

Town Hall is desperately in need of repairs. Trim around the windows and doors will be repaired when possible, with new windows and steel doors being installed. There is also concrete work needed to the facade of the building. The front deck had been repaired and painted previously and it is now in need of replacement. Composite decking will be used to help with maintenance. The clock and related parts including lighting needs complete replacement to restore the clock to proper working order again.

09/14/2020
 
Randolph Land Purchase Powers Farm- Rear Niles Road

The Town will purchase 6.3 Acres of land at Rear Niles Road to add to Powers Farm and complete a full circle around Norroway Pond and legally grant the Town access to the far side of the property. The parcel is Map 39, Block A, Parcel 57, Rear Niles Road

03/31/2021
 
Randolph Archival Cataloging & Preservation

This is the final phase of the project and will hire the same student intern from Simmons College as before to finalize the process of reviewing and sorting the items for storage, scanning and digitizing of the items and online sharing with researchers, in collaboration with the Omeka Program at the Turner Free Library to process access and education.

06/21/2021
 
Randolph Randolph Dog Park

The CPA funded the creation of the Randolph Dog Park back in 2011 and supported improvements/maintenance over the years. The dog park is in need of some fencing repairs and replacements around the perimeter and within the park itself. Mulch and stone will be added throughout the park to replace that which has worn away over time.

06/21/2021
 
Randolph Theodore Luddington Memorial Park

The Theodore Luddington Memorial Park is located between the Turner Free Library and the Randolph Central Fire Station. Some of the existing materials will be re-used and re-worked to create an ADA accessible walkway from Memorial Parkway to Turner Lane. This will enhance pedestrian safety and allow for the creation of a patio area with benches and table games for residents of all ages to enjoy.

06/21/2021
 
Randolph Shared Housing Services

This project supports the Town's participation in a Shared Housing Services Organization (SHSO) to track, administer, support, and promote affordable housing. The Shared Housing Services Organization (SHSO) is a collaboration with seven other communities to augment existing staff capacity by providing the expertise and staffing needed to manage and monitor the affordable housing track on a continual basis. The SHSO would provide Monitoring Services to ensure and enforce compliance of existing affordable housing restrictions with the goal of preserving the affordable units, provide local support value-added responsibilities focusing on assisting specific projects and locally sponsored unit creation development and administration, and regional services which will provide training, workshops and referrals of resources to existing owners and renters by connecting them to programs and services available regionally.

06/29/2022
 
Randolph Stetson Hall Gutter Installation

Installation of historically appropriate copper gutters, brackets and downspouts to the main building, porch and addition at Stetson Hall. This funding will be used to apply for a matching grant from the State to reimburse the Town for up to 50% of the appropriation.

06/29/2022
 
Randolph Theodore Luddington Memorial Park

This is the second phase of the project between the Turner Library and the Central Fire Station. This project promotes recreation activities for residents of all ages while enjoying outdoor open space. This phase will complete the work begun in phase one by enclosing and securing the antenna tower for the Fire Department, installing the game tables and benches along with the bike racks. Grass and native plants along with artwork and site rule signage will be added to round out the space.

06/29/2022
 
Randolph Belcher Park Girl Scout House Rehab

The roof to the “Girl Scout House” is in need of replacement. There are some mold and insect issues that were addressed, but now the damage they have caused needs to replaced. The House is used for storage, and by the Summer Recreation Program and local Girl Scouts.

06/29/2022
 
Randolph Stetson Hall- Insulation Installation

Installation of insulation in the roof at the east end of Stetson Hall to fill an existing gap that allows snow and ice to melt off the main and porch roofs over the ramp/handicap access to the building, making it hazardous to visitors.

06/29/2022
 
Randolph Stetson Hall Roof & Wood Repair

The contractor will locate the source of the leak on the roof/cupola; strip, repair (including replacement of any damaged wood), replace shingles and repair the damaged plaster in the balcony of the great Hall. This project includes identifying and repairing all locations where wood has rotted around exterior windows and doors and along the stairs/ramp at the east entrance.

06/29/2022
 
Randolph Stetson Hall HVAC Renovation

This project will replace HVAC controllers at Stetson Hall. Honeywell Jace 8000 controllers will be installed, for the boiler and chiller, along with new thermostats, discharge air sensors, relays, status relays and establish a communications network. New programming schedules and graphics will be introduced. Costs include training to end users. This renovation will eliminate the frequent emergency repairs to the existing aged system and this upgrade will help control the climate at the Hall aiding in the preservation of the historic structure,

06/29/2022
 
Randolph Open Space & Recreation Plan

The Open Space & Recreation Plan (OSRP) is filed with the State and allows the Town of Randolph to be eligible for OSRP-required grant proposals. This project will finish the OSRP that was started in 2017. The OSRP is supposed to be one outcome of the Master Plan, focusing on the "Open Space and Recreation" recommendations of the Master Plan. The Master Plan was completed in 2017, but there was no Master Plan Implementation Committee until 2022, and the OSRP component remains incomplete.

07/20/2022
 
Randolph Signage- South Randolph and other areas

This project will add signage to some entrances near area parks and trail locations, denote parking, include wayfinding & other information such as rules. This project also includes funding for the DPW to maintain the signage and trails leading from those entrances. Locations may include, the Lokitis Conservation area in South Randolph, Powers Farm, the Blue Hills Entrance near the Donovan School, Reservoir Walk and the Old Colony Rail Trail.

08/03/2022
 
Randolph Belcher House ADA Rehabilitation

The Jonathan Belcher House is over 100 years old; due to its age, the house does not meet many ADA requirements of today. This rehabilitation will include the installation of a lift, widening of doorways and installation of handicap restrooms. The funding from the Town will be a match to monies already received from the Mass Cultural Facilities Fund. The Women’s Club will be raising the additional money needed through additional grants and fundraising. The State Grant does have a time limit and the complete funding must be raise by June of 2024.

08/03/2022
 

Pages

CSV