City/Town Name | Description | Approval Date |
Categories |
|
---|---|---|---|---|
Westfield | American Legion Building |
Restoration, rehabilitation and preservation of the historic "Noah Strong House" |
05/18/2023 |
|
Westfield | Pine Hill Cemetery Gates |
Restoration of deteriorating stone gates at the historic rural garden cemetery |
05/18/2023 |
|
Greenfield | Historical Society Document Preservation |
Preservation of documents from the Estate of Peter Miller. |
05/17/2023 |
|
Greenfield | FCAS Barn Rehabilitation |
Rehabilitation of cattle barn roofs at Franklin County Fairgrounds for the Franklin County Agricultural Society. |
05/17/2023 |
|
Greenfield | MOIH Shop Equipment Restoration |
Restoration of antique Goodell-Pratt Light Machine Shop. |
05/17/2023 |
|
Greenfield | CSO Wells Street Shelter Expansion |
Clinical and Support Options is creating 36 studio apartments for permanent support of housing at 60 Wells Street. |
05/17/2023 |
|
Greenfield | Pickleball Court Expansion |
Design, engineering, and site readiness of a multi-court pickleball facility adjacent to Abercrombie Field. |
05/17/2023 |
|
Greenfield | Highland Park Trail Restoration |
Renovation of trails in Highland Park and Temple Woods. |
05/17/2023 |
|
Greenfield | GHS Track ADA Access |
Creation of concrete connection path to provide access to the GHS track and spectator viewing area. |
05/17/2023 |
|
Greenfield | Beacon Park Improvements |
Installation of two new bocce courts and replacement of two water fountains at Beacon Park. |
05/17/2023 |
|
Greenfield | Shattuck Park Fitness Cluster |
Installation of a fitness cluster at Shattuck Park. |
05/17/2023 |
|
Greenfield | Citywide Outdoor Site Amenities |
Installation of interactive play amenities. |
05/17/2023 |
|
Norfolk | Norfolk Grabge Historic Preservation |
Allocate $40,000 for the Historic Preservation of the exterior of the Norfolk Grange |
05/17/2023 |
|
Norfolk | Updated Open Space and Recreation Plan 2023 |
Allocate $60,000 for an update of the Norfolk Open Space and Recreation Plan |
05/17/2023 |
|
Norfolk | Town Hill Infastructure an Gazebo Rehabilitation |
Allocate $15,000 for a feasibility study for the rehabilitation of Town Hill including but not limited to infastructure and Gazebo |
05/17/2023 |
|
Plympton | Funds for Open Space Land Acquisition |
Funds to be used for Open Space land acquisition efforts |
05/17/2023 |
|
Agawam | Historical Documentation of Joseph and Malvina Beaumier Confectionary Store and Garage |
Architectural documentation of the Joseph and Malvina Beaumier Confectionary Store and Garage for the Preservation of Historic Resources |
05/16/2023 |
|
Agawam | Historic Graves & Monuments Restoration Phase 2 |
Restoration and Preservation of historical graves and monuments. |
05/16/2023 |
|
Agawam | Thomas Smith House Exterior Preservation |
Thomas Smith House exterior preservation |
05/16/2023 |
|
Agawam | Hampden County Map Framing |
Framing of historical 1855 Hampden County Maps |
05/16/2023 |
|
Holyoke | Anniversary Hill Park: Day Brook Parcels Land Acquisition |
Project will fund the Acquisition and permanent protection of 7.24 acres of open space forested land (MBP 145-00-094, 146- 00-015, and 127-00-004) associated with one of the headwaters of Day Brook, adjacent to Anniversary Hill Park and Community Field. |
05/16/2023 |
|
Holyoke | Wistariahurst Museum Restoration of Damaged Porch Structures |
Restoration and replacement of damaged and rotted structural columns and beam on the covered porch for the Pine Street-facing entrance to the Main House Building. This was an emergency application, since the need for this work was revealed during a previously funded project. |
05/16/2023 |
|
Malden | Affordable Housing Trust Fund |
The goal of this project is to provide resources to the Affordable Housing Trust Fund to increase, preserve, and improve access to affordable housing in Malden. |
05/16/2023 |
|
North Andover | Lake Cochichewick Boat Ramp |
Continuation of FY 2023 original request which CPC asked to divide into 2 phases This allocation is to finalize the engineering and design work Trailer access would be prohibited other than as needed by the Fire Department Final project could include additional open space to provide more opportunities to view the lake beyond just boat access |
05/16/2023 |
|
North Andover | Stevens-Coolidge Ballroom Mural |
Project Summary: Restoration of a historic landscape mural in the ballroom of the Stevens-Coolidge estate Key Points: The Trustees have been working to improve public engagement and access at the property This restoration would allow them to eventually open the ballroom to public access As a condition, the committee wanted to see: Improved access to the building for school groups (they have recently hired an education coordinator for that purpose) School administration meetings in the space Coordination with the youth center to get access to kids in need to attend the signature events such as winter lights (beyond what has already been happening) These items will be memorialized in the warrant article and grant agreement |
05/16/2023 |
|
North Andover | Parson Barnard House Restoration |
Project Summary: Required renovations to the interior of Parson Barnard house. Key Points: Repairs are intended to prevent further deterioration and improve public accessibility to the building. |
05/16/2023 |
|
North Andover | North Andover Historical Society Preservation of Historic Artifacts |
Project Summary: Restoration efforts to clean, re-house, and conserve NAHSâs collection of historic artifacts. Key Points: These items were previously housed in the basement of the Grange Mold, mildew, and other damage have occurred over time Now that NAHS has a proper space and venue to store and display the artifacts, the time is right to restore them |
05/16/2023 |
|
North Andover | Historic Preservation Master Plan |
Project Summary: Master plan to review all aspects of North Andoverâs historic preservation efforts including assets, processes, and procedures in accordance with the Master Plan Key Points: Grant match to an application to Mass Historic Commission (not a 50/50 split) Strategy point from the 2018 Town Master Plan Intended to give a full 360-degree view of all historic procedures, policies and commissions Will result in report with key assets to protect. |
05/16/2023 |
|
North Andover | Stevens Memorial Library Historic Entrance Stairs |
Project Summary: Construction phase of Project #1379 to restore the steps to the North side of the Stevens Library Key Points: Supplemental request is due to more accurate costs since bidders have been limited based on the RFP process If they cannot secure bidders, they may then consider an RFQ process They have design documents in place which should help guide them, but the historic nature of the project can make it difficult |
05/16/2023 |
|
North Andover | Stevens Estate-Carriage House Stabilization |
Matching funds for a Massachusetts Historic Commission grant to stabilize the Stevens Estate Carriage House Key Points: Project will stabilize the structure to prevent further damage Future use of the building is still to be determined, but it will be public |
05/16/2023 |
|
North Andover | Second Burying Ground Preservation |
Extension of previously approved project to locate and restore headstone footings in the Historic Second Burial Ground on Academy Road Key Points: More work has been uncovered since RCA assumed ownership of the lot RCA commissioned a ground penetrating radar study which uncovered quite a few damaged headstones Unlike Ridgewood, SBG has no source of revenue The goal will be to eventually cover SBG costs through the Ridgewood budget Recently received a $15,000 grant from MHC dedicated to rehabilitate grave sites of Revolutionary War veterans |
05/16/2023 |
|
North Andover | Ridgewood Cemetary - Restoration of Boundary Wall |
Restoration of boundary walls along the southeast portion of the Ridgewood Cemetery Key Points: Over the years, the boundary walls at Ridgewood have been victim to stone theft With wall footings still in place, these are a restoration rather than a recreation |
05/16/2023 |
|
Shrewsbury | 1830 Brick Schoolhouse Heatpump |
This project proposes to appropriate $65,000 from the Historic Resources Reserve for installation of a highly efficient electric heat pump HVAC system which will serve the first and second floors as well as other weatherization measures throughout the entire building as identified in an energy audit conducted by the Center for EcoTechnology (CET) on December 13, 2022. Installation of these systems will assist in the preservation of this historic structure through improved temperature and humidity control. |
05/16/2023 |
|
Shrewsbury | Prospect Park Pergola Restoration |
This project proposes to appropriate $85,500 from the Historic Resources Reserve Account to conduct a Site and Structural Assessment of the Prospect Park Pergola which is over 100 years old. The site and structural assessment will be conducted by a Certified Landscape Architect with experience in Historic Preservation. The scope of the assessment will focus on restoration of the pergola, site access and use as community gathering space. Project deliverables will include the site and structural assessment, design specifications, recommendations, and assistance in preparing bid documents. |
05/16/2023 |
|
Shrewsbury | Mt. View Cemetery Historic Gravestones |
This project proposes to appropriate $5,500 from the Historic Resources Reserve Account to conduct an Inventory and Assessment of historic gravestones located in the southeast corner of the Mt. View Cemetery, Sections 1-9. The cemetery is located in the Shrewsbury Historic District and is designated on the State Register of Historic Places and National Register of Historic Places. The Inventory and Assessment will review the current condition of historic gravestones, some of which date to the 1730âs, and prioritize their specific needs for restoration and preservation in accordance with the practices of the United States National Parks Service. |
05/16/2023 |
|
Shrewsbury | District #5 Schoolhouse Facility Review |
This project proposes to appropriate $2,000 from the Historic Resources Reserve to conduct a Facility Review by the Institute for Human Centered Design. The Facilities Review will evaluate ADA accessibility and pedestrian infrastructure of the structure itself as well as surrounding routes and parking. The District #5 Schoolhouse was built in 1828, is the oldest schoolhouse in Shrewsbury and is listed on the State Register of Historic Places and National Register of Historic Places. |
05/16/2023 |
|
Shrewsbury | Arrowwood Park Restoration |
This project proposes to appropriate $40,000 from the Open Space and Recreation Reserve Account for design services for restoration of the playground equipment at Arrowwood Park. The project will redesign the existing playground equipment and surface to provide an improved playground design meeting modern design and safety standards. This park currently serves a large portion of the community, however the current condition deters significant use. |
05/16/2023 |
|
Shrewsbury | Town-wide Playground Assessment |
This project proposes to appropriate $70,000 from the Open Space and Recreation Reserve Account for design services for restoration of the playground at Edgemere Park as well as a town wide assessment of the nine (9) Town parks and six (6) school parks. Many of the playgrounds were built as part of subdivision construction or fundraising done by school PTO groups. The majority of the playgrounds do not have accessible surfaces or modern safety surfaces. The playgrounds do get a lot of use and are typically 15 to 30 plus years old. Play for children is essential for their development of social and motor skills. Designing a new playground at Edgemere Park will align with the Parks Division goals for continuing to improve recreation areas for our community. |
05/16/2023 |
|
Shrewsbury | Dean Park Basketball Courts |
This project proposes to appropriate $375,000 from the Community Preservation Reserve Account for reconstruction of the existing basketball courts. The Townâs 2018 Master Plan indicated the basketball courts were in poor condition and needed to be rebuilt. The courts currently have deep cracks, backboards which need to be upgraded, and fences which are worn. The fenced in courts will also need to have a sidewalk added to make it more accessible. This project will rebuild the three (3) basketball courts, two (2) of which are fenced in. |
05/16/2023 |
|
Shrewsbury | Camp Wunnegan Parking |
This project proposes to appropriate $142,000 from the Community Preservation Reserve Account for design and construction of nine (9) standard and one (1) ADA accessible parking spaces at 645 and 645R Grafton Street fka âCamp Wunneganâ. This will improve accessibility to and use of the associated trail systems for more equitable enjoyment by the community. The proposed design also incorporates improved storm water management systems. |
05/16/2023 |
|
Shrewsbury | Howe/Sears Farm Acquisition |
This project proposes to appropriate $435,000 from the Fund Balance Account for acquisition for conservation purposes under Chapter 44B, parcels of land located at 443 and 457 Lake Street and 104 Grove Street aka the Howe/Sears Family Farm. The proposed project would be the contribution of half of the funds required to purchase the property with the remaining funds provided via American Rescue Plan Act (ARPA) funds. With the purchase of this property the Town hopes to create connectivity between current Town owned land to promote passive recreation, such as walking trails, and preserve open and natural space in Town. These parcels help to create connectivity between Lake Street Park all the way to Camp Wunnegan through sidewalks and walking trails. The Town is working to develop a formal trail network throughout the Town and this project contributes to this effort. The Greater Worcester Land Trust has expressed interest in the project and holding the conservation restriction on the property. |
05/16/2023 |
|
Southwick | Whalley Spray Park |
To pay for all costs incidental and related to the installation of a spray park to be located at Whalley Park, Assessors Map 090 Parcel 014. Warrant Article 22 |
05/16/2023 |
|
Southwick | Flooring Replacement- Southwick Housing Authority- Depot Street |
To replace all tile flooring in 20 common hallways with commercial vinyl plank at the Southwick Housing Authority facility, 12 Depot Street Assessors Map 089 Parcel 026. |
05/16/2023 |
|
Southwick | The Moore House Repair |
Replace one horizontal timber with posts under the north attic window, repair/replace the trim and clapboards as needed and to scrape/sand/prime/paint the exterior, Assessors Map 157 Parcel 002, Warrant Article 23 |
05/16/2023 |
|
Southwick | Repair Slate Roof and Cupola at Police Department |
Repair Slate Roof and Cupola at Police Department, Assessors Map 088 Parcel 001, Warrant Article 25 |
05/16/2023 |
|
Southwick | Hazardous Tree Removal at Old Cemetery |
To remove 44 trees that pose a hazard to monuments, gravestones, visitors and cemetery workers at the Old Cemetery Assessors Map 111 Parcel 004, Warrant Article 24 |
05/16/2023 |
|
Southwick | Restoration of Bronze Memorial Plaques |
Restoration of war memorial bronze plaques. Four located at the War Memorial and one located at the Old Cemetery, Assessors Map 089 Parcel 022, Assessors Map 111 Parcel 004, Warrant Article 21 |
05/16/2023 |
|
Williamstown | MGRSD Track and Playing Field |
To fund a grant to the Mount Greylock Regional School District for recreation purposes for an 8-lane track with field sport facilities and a natural grass playing field |
05/16/2023 |
|
Williamstown | Williamstown Housing Authority P24HA |
To fund a grant to the Williamstown Housing Authority for initiatives and programs related to furthering affordable housing in Williamstown |
05/16/2023 |
|
Williamstown | Affordable Housing Trust |
To fund a grant to the Williamstown Affordable Housing Trust for initiatives and programs related to furthering affordable housing in Williamstown P24AT |
05/16/2023 |