City/Town Name | Description | Approval Date |
Categories |
|
---|---|---|---|---|
Hanover | Sylvester & Salmond Schools Renovation and Feasibility Consultation |
Funds to support but not limited to the renovation, concept design, architectural, and engineering work of Sylvester School and the concept design and feasibility study for the future use of Salmond School. |
05/03/2021 |
|
Hanover | Sylvester Field Conservation Restriction |
Purchase a MGL Ch. 184 sec. 31-3 conservation restriction for a 10.15 acre field between Washington Street and Third Herring Brook that will prevent development of the property in perpetuity. |
05/03/2021 |
|
Duxbury | Synthetic Athletic Fields |
To fund site work and drainage improvements to facilitate the installation of two synthetic athletic fields on the sites of Ellison High School Chandler Field and Duxbury Middle School Footbal Field. Additional funding must come from other sources such that CPA funds do not pay for more than 1/3 of any synthetic field project. |
03/10/2007 |
|
Amherst | Szwacz Property Purchase |
The Town has a long history of working to preserve forest and farm land along the Cushman Brook and Mill Rivers in N. Amherst. The Szwacz property contains significant river frontage and offers a unique opportunity to preserve water quality and wildlife habitat in the Mill River watershed. This parcel is part of a much larger block of land already protected by APRÂs. The Town has appraised the property and is working with a willing seller |
05/12/2010 |
|
Acton | T.J. O'Grady Skate Park |
The appropriation funds the addition of a beginners skate bowl where the current parking lot is located, the relocation of the existing parking lot, and the addition of various walkways and sidewalks, fencing, light poles and drainage improvements. |
04/02/2012 |
|
Acton | T.J. O'Grady Skate Park |
For the construction of the T.J. O'Grady Skate Park at 66 Hayward Road. |
04/15/2004 |
|
Edgartown | Tabernacle Bench and Chair Restoration |
Regional project to preserve and restore the benches and chairs at the Camp Meeting Association Tabernacle in Oak Bluffs. |
04/12/2016 |
|
Oak Bluffs | Tabernacle Benches and Chairs Restoration |
To help restore the Martha's Vineyard Camp Meeting Association's Tabernacle historic benches and chairs. This project is supported by other island town CPA grants. |
04/12/2016 |
|
Oak Bluffs | Tabernacle Clerestory |
Window replacement for Campground Tabernacle |
04/20/2009 |
|
Oak Bluffs | Tabernacle Cupola |
renovation of 1893 Campground Tabernacle Cupola |
04/15/2008 |
|
Edgartown | Tabernacle Roof |
Historic Restoration of the Tabernacle Roof at the Camp Meeting Association in Oak Bluffs |
04/11/2023 |
|
Edgartown | Tabernacle Roof |
Historic Restoration of the Tabernacle Roof at the Camp Meeting Association in Oak Bluffs |
04/12/2022 |
|
Oak Bluffs | Tabernacle roof |
Replace roof of Tabernacle. |
05/15/2021 |
|
Edgartown | Tabernacle Roof |
Restoration of the roof of the Tabernacle in Oak Bluffs. This is a regional project. |
05/22/2021 |
|
Pittsfield | Taconic High School Athletic Field Restoration |
This project was proposed in conjunction of the opening of the new Taconic High School this fall. Athletic fields were largely neglected in the proposal, so this request would provide for the restoration of the track surface and new fencing to secure the newly rehabilitated track. |
06/26/2018 |
|
Westford | Tadmuck Rd senior housing |
To hire consultants who will guide Housing Dept. through the process of securing funding to add 55 units to the senior housing complex at Tadmuck Rd. |
05/06/2006 |
|
Westford | Tadmuck Rd senior housing |
For the development and construction of senior, affordable housing units at Tadmuck Road from Community Housing Reserve Fund. |
05/06/2006 |
|
Newton | Taft Avenue |
Rehabilitate and expand a small, existing single-family home in West Newton to create two permanently affordable rental units: a 3-bedroom affordable at 80% of area median income, and a 2-bedroom affordable at 50% of area median income. For more information, see this project's page on our website, www.newtonma.gov/cpa, under "Proposals & Projects - Completed." |
04/06/2015 |
|
Mendon | Taft Library Roof & Belfry Restoration |
Restoration of the Taft Public Library, including, re-roofing the entire roof and repairing and reshingling the belfry. |
03/21/2016 |
|
Boston | Talbot Commons Affordable Housing |
Build 19 new rental units at 60% AMI and 9 new units at 30% AMI. Preserve 21 existing affordable rental units. |
06/20/2018 |
|
Boston | Talbot Commons II |
To partially fund the creation of 42 affordable rental units on two vacant city-owned parcels. All units will be deed-restricted with units ranging from 30% to 60% Area Median Income (AMI). |
04/13/2022 |
|
Boston | Talbot-Norfolk Children's Garden Water Installation |
Install water and irrigation system in a local children's community learning garden. |
06/20/2018 |
|
Barnstable | Tales of Cape Cod -Olde Colonial Courthouse Phase 1 |
Historic preservation and restoration of the Olde Colonial Courthouse located at 3046 Main Street, Barnstable. Phase 1 work includes roof repair, gutters and leaders, siding and trim, foundation repair, electrical system upgrade, basement entry gable, repair/replacement of porches and stairs and the removal of an exterior brick chimney that is unused. CPA funds allocated in 2016 but state grant was not awarded. TC vote for CPA funds held for 2017 state grant round. CPA funding contingent upon award of state (MPPF) grant in 2017. |
03/23/2017 |
|
Barnstable | Tales of Cape Cod Phase III - Exterior Access Project -Olde Colonial Courthouse Restoration |
Historic Preservation and restoration work for provision of accessibility to the historic Olde Colonial Courthouse building by installing a lift leading to a new accessible entrance on the east side of the building and regrading to create an accessible walkway to the building. Massachusetts law required the building to be made compliant with regulations relating to building access for persons with disabilities. |
02/02/2023 |
|
Barnstable | Tales of CC - Olde Colonial Courthouse - Phase II |
Restoration of the support structure of the 1st floor of the oldest portion of the Olde Colonial Courthouse. |
05/21/2020 |
|
Amherst | Tamarack Dr. affordable housing |
To assist in the cost of construction of two duplexes (4 units) of affordable housing |
10/27/2003 |
|
Weymouth | Tammy Brook Apartments |
Loan to a private owner for the purchase of these units which will remain affordable. 24 units under 50% of AMI, 41 units under 80% AMI and 25 units unrestricted |
06/15/2009 |
|
Cambridge | Tanner Residence - YWCA |
The Cambridge YWCA is using CPA funds to completely renovate its SRO housing units for very-low income women at risk of homelessness. Rehab will include all units, building common areas, systems, and elevator, and will be sensitive to the historic design of each of the 2 attached structures. CPA funds will assist in ensuring that these affordable units are preserved as housing resources for very low income women. |
07/22/2009 |
|
Peabody | Tannery Apartments |
Purchase of Tannery apartments - city & WinnDevelopment |
04/25/2019 |
|
Duxbury | Tarkiln Building |
For a historic preservation and accessibility compliance study of the historic Tarkiln Building. |
01/01/2004 |
|
Duxbury | Tarkiln Community Center |
funding for partial restoration of Historic Tarkiln Building |
03/14/2009 |
|
Duxbury | Tarkiln Community Center |
For the preparation of construction and bid documents for the historic restoration of the Tarkiln Community Center |
03/10/2007 |
|
Gloucester | TARR & WONSON PAINT FACTORY BATHROOMS |
INSTALLATION OF TWO HANDICAP ACCESSIBLE BATHROOMS IN RECENTLY RENOVATED BUILDING A |
12/10/2019 |
|
Gloucester | Tarr & Wonson Paint Manufactory - Interior Renovation Buildings A & B |
The restoration and reconstruction of buildings A & B of the Tarr and Wonson Paint Manufactory building. Work will include the removal of debris, leveling of floors, framing, finishing interior spaces and utilities installation. |
12/08/2015 |
|
Tisbury | Tashmoo Overlook Vegetation Management |
Clear trees and vegetation on Town land within view corridor. |
04/15/2015 |
|
Tisbury | Tashmoo Overlook Waterworks Park Development |
Engineering study to create safe public access for waterworks park development. |
04/10/2018 |
|
Tisbury | Tashmoo Overlook Waterworks Park Development |
Planning and design for new pedestrian public access for Tashmoo Overlook Waterworks park development. |
04/15/2015 |
|
Tisbury | Tashmoo Park plans |
For the planning and design of this recreational park |
04/10/2007 |
|
Tisbury | Tashmoo Park/Lake St. Landing Park |
Invasive species removal and pathway preservation |
04/10/2012 |
|
Tisbury | Tashmoo Preserve - Dredging for Herring Run |
To dredge the inner pond at Lake Tashmoo in preparation for the restoration of the Herring Run, including obtaining the permits necessary to do the work |
04/12/2011 |
|
Tisbury | Tashmoo Preserve - Invasive Species |
removal of invasive species including Japanese Knotweed |
04/10/2012 |
|
Tisbury | Tashmoo Preserve - Invasive Species |
To remove invasive meadow species at the Tisbury Waters Works property, Tashmoo Preserve, |
04/12/2011 |
|
Tisbury | Tashmoo Preserve - Invasive Species |
Continued removal of invasive species |
04/09/2013 |
|
Tisbury | Tashmoo Preserve, Spring Pond Dredge |
Appropriate $35,000 toward the dredging of the fresh water pond, known as 'the Spring Pond', at the Tisbury Water Works Department property at 400 West Spring Street, Tisbury. |
04/30/2014 |
|
Tisbury | Tashmoo Preserve, Spring Pond Dredge |
For dredging of fresh water pond at Tashmoo Park Preserve |
04/09/2013 |
|
Tisbury | Tashmoo Preserve- Herring Run, Shellfish Restoration |
For restoration of the Lake Tashmoo Herring Run including testing water and data collection |
04/12/2011 |
|
Tisbury | Tashmoo Spring Building preservation |
Continuing the rehabilitation of the Tashmoo Spring Building as outlined in manual prepared by Structures North Consulting Engineers,consulting w/ Einhorn Yaffee |
04/01/2008 |
|
Tisbury | Tashmoo Spring Building preservation |
Final grant to complete various resotration projects |
04/09/2013 |
|
Tisbury | Tashmoo Spring Building preservation |
Continuing rehabilitation, preservation and restoration including brickwork, coal bunker area, and other exterior items |
04/10/2012 |
|
Tisbury | Tashmoo Spring Building preservation |
For stabilizing, correcting and restoring some of the damage |
04/10/2007 |