City/Town Name | Description | Approval Date |
Categories |
|
---|---|---|---|---|
Manchester | Town Hall Boat Ramp |
Rehabilitation of the town's boat ramp for recreation. |
04/06/2015 |
|
Manchester | Town Hall Boat Ramp |
Town Hall Boat Ramp engineering and permits for the repairs to the boat ramp. |
04/07/2014 |
|
Barnstable | Town Hall Building Improvements |
Funding will cover soft costs and construction costs for professional roof and foundation assessments, brick and tuck pointing repairs and the replacement of 22 unsafe windows. |
07/31/2007 |
|
Bedford | Town Hall Building Systems Replacement |
Remodeling, reconstructing and making extraordinary repairs to the Town Hall. This building had previously been a school in the Town and is historic. |
11/06/2014 |
|
Hamilton | Town Hall ceiling |
To fund the repair of the 1898 plaster ceiling of the second floor of the Town Hall |
05/07/2007 |
|
Edgartown | Town Hall Ceiling & Front |
To historically preserve the arched ceiling of the Town Hall and additional funds for the facade of Town Hall due to finding rot when original preservation project started. |
12/09/2008 |
|
Bedford | Town Hall Chimmey Repointing |
To fund the chimney repointing at Town Hall |
03/29/2011 |
|
Georgetown | Town Hall Chimney |
For the repair of one of the chimneys at Town Hall |
05/07/2007 |
|
Provincetown | Town Hall Clock |
To restore the clock on the Town Hall |
04/04/2007 |
|
Hadley | Town Hall Columns |
Additional funds for preservation and/or rehabilitation of the historic four pillars in front of Town Hall |
10/16/2021 |
|
Hadley | Town Hall Columns |
Repair and restore the four columns at the Town Hall |
05/03/2018 |
|
Belmont | Town Hall Complex Slate Roofs |
The scope of the project is to stop the water intrusion from the slate roofs into the buildings in the Town Hall complex. The scope of the project will include, at a minimum, the following: 1. Identify active roof leaks caused by failures of slate, rubber membrane or copper flashing 2. Repair the leaks to stop further deterioration of the structural dimensional lumber that has been exposed to many years of water intrusion. Leaks could be caused from missing or cracked slate, copper that has become permeable, failed flashing around chimney and pipe penetrations. Areas of greatest concern include the valleys, hips, rafters, and deck sheeting 3. Repair and or replace wood that is water-logged, contains black mold, or is structurally compromised 4. Install Grace âIce and Water Shieldâ membrane where necessary to replace damaged material 5. Reinstall original slate that has been saved 6. Remove and replace any wet insulation 7. Repair damaged original horsehair plaster with like kind and paint to match 8. Remove equipment from the roof(s) and repair leaks under them |
05/06/2019 |
|
Provincetown | Town Hall Corridor Cases |
Construction of moveable cases for displaying historic documents and small objects |
04/04/2011 |
|
Royalston | Town Hall Cupola & Dormers |
Restore cupola & dormers on historic district town hall |
04/18/2013 |
|
Rowley | Town Hall Cupola and Clock |
Reconstruct rotting cupola and repair clock, which are historical features of Town Hall |
05/03/2010 |
|
Stoughton | Town Hall Cupola and Cornices Rehabilitation |
Repair, paint and preserve Town Hall cupola and cornices |
05/14/2018 |
|
Nahant | Town Hall Cupola Restoration |
Restoration of Town Hall Cupola |
04/30/2016 |
|
Templeton | Town Hall Cupole Restoration |
Restoration of the cupola atop the historic culturally significant Town Hall building in East Templeton. |
05/10/2023 |
|
Harvard | Town Hall Debt service |
Debt payment on bonds for the restoration of Town Hall |
04/01/2017 |
|
Westford | Town Hall Design |
For the design, engineering and providing detailed costs estimated for renovations and/or upgrade to the current Town Hall and any other related costs from Historic Reserve. |
10/20/2008 |
|
Stow | Town Hall Design Funds |
Funds are needed to explore the exterior and interior to determine how to restore the worn down building. |
05/07/2018 |
|
Barnstable | Town Hall Door |
To fund preservation of the Town Hall Door and Entryway from the Village Green by refurbishing the existing exterior doors and frame. This building is located within the Hyannis Main Street Waterfront Historic District. and is on the National Register. |
01/18/2007 |
|
Belmont | Town Hall Door Remediation |
Rehabilitate six historic town hall doors. As of 8-18-15, the project has been completed. $129.50 to be transferred back to the CPA Fund. |
05/01/2013 |
|
Royalston | Town Hall Elevator |
To install an elevator in town hall to reach 1st, 2nd and stage area for individuals requiring assistance and to complete project to ensure town hall maintains historical status. |
05/06/2016 |
|
Hamilton | Town Hall energy audit |
To fund an energy audit of the Town Hall |
05/07/2007 |
|
Mendon | Town Hall Engineering for elevator |
To fund the schematics and design options for the elevator and rear entrance area of the historic Mendon Town Hall |
11/14/2022 |
|
Cohasset | Town Hall Entrance |
To fund the restoration of the entrance doors of the antique portion of the Town Hall |
04/01/2006 |
|
Hull | Town Hall Entrance Rehabilitation |
Appropriate $45,000 from the Community Preservation Historic Reserve to be used by the Town of Hull for the Town Hall Entrance Rehabilitation located at 253 Atlantic Avenue |
05/03/2021 |
|
Arlington | Town Hall Envelope Preservation, Phase 1 (Town Hall Clock Tower), Town of Arlington |
The Robbins Memorial Town Hall was built in 1912 and serves as Arlingtonâs center of civic activity. This architecturally-significant building is owned by the Town of Arlington and protected by a preservation restriction and needs reinvestment following over a century of service and decades of deferred maintenance. The entire building envelope, including the limestone façade, terra cotta Clock Tower, wooden windows and doors, and various roofing membranes need repair or replacement. Principal Patrick Guthrie conducted a preliminary assessment and prepared a preservation plan for the envelope of Town Hall. The most pressing findings relate to the dire conditions of the Clock Tower, which is losing structural integrity and causing water penetration affecting the building interior, specifically the Lyons Hearing Room. The first goal would be to complete a comprehensive 3D laser scan of the Clock Tower that will capture shape and dimensional information for the structure and its various ornate elements. The existing Clock Tower would also be safely removed and the opening into the attic would be roofed over to protect the interior from further damage. The laser scans would then be used during later phases to design and fabricate new elements off-site for reconstruction of the Clock Tower at a later date. The proposed FY2024 CPA funding would facilitate execution of this crucial preservation work. Because of the severity of the current condition, the Town has tarped the structure to stem the rapidly-worsening conditions inside the building. Beyond the Phase 1 work to be funded by the proposed CPA award, the consultants estimate that the entire exterior renovation project will be approximately $8â10M. Phase 1 intends to stabilize the structure, allowing the Town to develop a plan and timeline to fund the remaining work, likely via a borrowing supported over time by CPA funding and the Townâs Capital Plan. |
05/15/2023 |
|
Hopkinton | Town Hall Envelope Repair; Phase II |
Continuation of preservation of Town Hall, including slate roof, mortar and brick preservation; overall goal to preserve a historic structure and address the need for proper archival space |
05/07/2013 |
|
Stoughton | Town Hall Exterior |
Design, repair and paint exterior of Town Hall |
06/06/2011 |
|
Nahant | Town Hall Exterior Balcony |
Preserve exterior balcony and balustrades |
04/26/2014 |
|
Barnstable | Town Hall Exterior Envelope |
Restoration of historic Barnstable Town Hall based on teh report submitted by the CPC Historic Consultant - consisting of roof, brick, windows, exterior door and other exterior repais and replacements for the preservation and rehabilitation of the building |
10/01/2009 |
|
Manchester | Town Hall Exterior Painting |
Painting of the exterior of Town Hall. |
04/04/2016 |
|
Belmont | Town Hall Exterior Railings Improvements |
The exterior historical ornamental iron railings system on the Concord Avenue side of Town Hall has fallen into significant disrepair. The two upper portions of the railing system are of a condition where refurbishment consisting of a thorough grinding, priming and repainting can bring them to a suitable finish. The lower portion of the railing measures 40 feet in length. This section of railing is significantly deteriorated, rendering it in need of replacement rather than refurbishment. The project will attempt to replace this section with new, historically accurate ornamental iron railing in the same location, and of the same style. |
05/02/2016 |
|
Wareham | Town Hall exterior renovations |
To replace two rubber roofs on the historic Wareham Town Hall. Also to re-glaze all windows and paint / preserve all exterior wooden surfaces. |
10/24/2011 |
|
Easton | Town Hall Exterior Restoration Supplemental Funding |
Supplemental funding for comprehensive exterior Town Hall restoration to allow completion of original $1.45 million November 2020 project following pandemic-related cost increases. |
05/16/2022 |
|
Needham | Town Hall Feasibility Study |
To conduct a feasibility study analyzing options for renovating the Town Hall |
05/16/2007 |
|
Nahant | Town Hall Flag Pole Restoration |
For restoration work on the flag pole located outside of Town Hall. |
05/21/2022 |
|
Hopkinton | Town Hall Foundation |
Funds to preserve and restore the Foundation of Town Hall |
05/05/2008 |
|
Hopkinton | Town Hall Foundation |
Phase II funding for the resteration & Preservation of the Claflin Memorial Fountain |
05/03/2010 |
|
Granville | Town Hall front door restoration/replacement |
funds to pay for construction of new front doors for Town Hall using the current doors as a template for historical design reproduction. |
05/09/2016 |
|
Boxborough | Town Hall front steps |
Additional Funding for Restoration of Front Steps |
05/09/2016 |
|
Boxborough | Town Hall front steps |
Rehabilitate steps for historical accuracy and safety. |
05/12/2015 |
|
Hamilton | Town Hall Front Steps Replacement |
Includes the demolition of the existing concrete steps and replacing them with granite. |
10/17/2009 |
|
Northfield | Town Hall Front Steps Restoration |
Complete restoration of the historically inaccurate and crumbling Town Hall front steps. |
05/02/2011 |
|
Bourne | Town Hall Furnace |
To replace the boiler in the historic Town Hall |
05/09/2006 |
|
Nahant | Town Hall Gables |
Town Hall preservation; develop required engineering specifications ($5,000) necessary to implement the repair of the failing gable arches ($25,000) as applied for by the Town |
04/27/2017 |
|
Ayer | Town Hall Generator |
Generator for town hall to avoid damage to plaster in the event of burst pipes. |
10/24/2011 |
|
Northborough | Town Hall gym floor |
For the replacement of the Historic Town Hall gym floor |
04/23/2007 |