CPA Projects Database

City/Town Name Description Approval Datesort descending
Categories
Manchester Library generator & flood remediation

Historic preservation - generator for the library as well as floodproofing in order to protect/preserve the building/historic items.

04/03/2023
 
Manchester Cemetery Restoration

Continuous preservation work at the cemeteries in Town.

04/03/2023
 
Manchester Seaside 1 HVAC

HVAC update to regulate temperature for the building.

04/03/2023
 
Manchester Historic Origin of "Masconomo" sign

A sign noting the historic origin of "Masconomo" which was a part of Manchester history.

04/03/2023
 
Provincetown Provincetown Art Association & Museum

Historic preservation of Cook House roof

04/03/2023
 
Provincetown The Hindu

Rebuild of historic schooner Hindu deck.

04/03/2023
 
Provincetown Affordable Housing Trust Fund

Transfer of CPA funds to AHTF for housing purposes

04/03/2023
 
Provincetown 3 Jerome Smith Housing development

New construction to create 65 rental units.

04/03/2023
 
Provincetown Juniper Hill

Support for new housing development in Wellfleet

04/03/2023
 
Provincetown Chelsea Earnest Playgroumd

Resurfacing of playground to make accessible

04/03/2023
 
Wellesley Sprague Field Complex Bathroom Facility

This appropriation will allow for the construction of bathrooms at teh Sprague Fields in Wellesley, one of the most actively-used playing fields complex in town. The project is modeled after the Hunnewell Field aqueduct bathroom project where pre-fab construction was used and has been a very successful project.

04/03/2023
 
Holyoke Wistariahurst Museum Preservation Planning & Chimney/Wallpaper Restoration

A complete engineering survey of the Wistariahurst Main House Building with specifications for the foundation work and chimney rebuilding. Remaining funds will be used to restore the one chimney with the most immediate need as well as to restore the damaged wallpaper from the leaking chimney.

04/04/2023
 
Holyoke Jones Point Park Study

The creation of a master plan for Jones Point Park which will include a boundary survey and public outreach. The master plan will be used for future park improvements.

04/04/2023
 
Holyoke City Hall Basement Document Recovery

The removal and restoration of approximately thirty or more journals and ledgers housed in the City Hall Basement. The documents will be cleaned, sanitized and made available to the public in the History Room at the Holyoke Public Library. This project is currently complete except for the posting of the CPA acknowledgement sign.

04/04/2023
 
Holyoke Gloutak Woods, Rock Valley Road Open Space Trail Improvements

Trail improvements, reroutes and closures, invasive species removal, timber staircase construction, and other necessary trail improvements as identified during the last phase of this project at Gloutak Woods in Holyoke.

04/04/2023
 
Holyoke Wrights Block – 106-120 High St Rehabilitation

Historic rehabilitation of the exterior façade of 106-120 High Street to include historically appropriate windows, masonry restoration, and the installation of an accessible entrance (ramp and door) for 120 High Street.

04/04/2023
 
Holyoke Anniversary Hill Park Phase II - Design, Permitting and Construction

This project will build on the work completed in the first part of Phase II which encompassed the initial design, engineering and permitting of Anniversary Hill Park improvements. The current project is for the full design and construction of Phase II. The work will include trail improvements, landscaping, and restoration of historic stone structures built by the Civilian Conservation Corps from 1939-1941.

04/04/2023
 
Barnstable Cape Cod Rail Trail Extension Phase III

Additional funds to complete the required remaining Phase III design, permitting, bid phase and construction engineering tasks for the 100% design phase that is in-progress. Phase III of the Cape Cod Rail Trail will extend to the west approximately four miles from Old Town House Road in Yarmouth to Mary Dunn Road in Barnstable.

04/06/2023
 
Barnstable Unitarian Church Restoration

Restoration and preservation of the church tower, pavilion, and nave: structural framing and exterior architectural woodwork, copper dome, flashing, clocks and weathervane.

04/06/2023
 
Barnstable Cape Cod Rail Trail - Phase IV

Required Pre-25% Design Services for Phase IV of the Cape Cod Rail Trail project to be submitted to MassDOT for State Transportation Improvement Project funds for construction of the trail. Once constructed Phase IV will extend the Cape Cod Rail Trail westward approx. 10 miles from Mary Dunn Road in Barnstable to the Barnstable/Sandwich town line.

04/06/2023
 
Scituate BEACH SIGNAGE

The Scituate Beach Commission requested funding to establish new entrance signage at the public beaches in Scituate. This includes the beaches at Egypt, Humarock, Minot, Museum, Peggotty and Sand Hills. Currently, the town’s beach signage is mismatched and inconsistent. This proposal will standardize the beach entrance signage and will conform to the “Sea Scituate” signage standards. throughout town.

04/10/2023
 
Scituate CUDWORTH HOUSE RESTORATION

The Scituate Historical Society requested funding for restoration improvements to the historic 1797 Cudworth House on First Parish Road. The house, barn, and animal pound are operated by the Scituate Historical Society and are open periodically to the public during the year. The Historical Society has begun restoration work on the house and some of the historic contents following a skunk infestation and issues with mold. The overall goal is to re-establish visitor access to the Cudworth House Museum, the barn, and the animal pound historic properties.

04/10/2023
 
Scituate PIER 44 PARK DESIGN & ENGINEERING

The Scituate Harbor Advisory Redevelopment Commission requested funding for the final design and engineering for the redevelopment of the 1.04 acre “Pier 44” site into a resilient harbor front park. The site is currently developed with an 8,000 square foot former restaurant building and 70 space asphalt parking lot. Current concept designs consider demolition of the old building and parking lot for conversion of the site to green open space for passive recreation with potential pavilion or pier for picnics and other outdoor events while providing public access to the harbor front in this area.

04/10/2023
 
Scituate NO. SCITUATE TRAIN CANOPY RESTORATION-PH 2

The Friends of North Scituate Village (FONSV) requested additional funding for completion of the restoration of the historic North Scituate Train Canopy. A series of delays including COVID, personnel changes and additional unexpected costs caused the previous funding to be insufficient. To complete the project, additional funding is needed for installation of the canopy lights, benches, tables, trash receptacles and signage. FONSV is planning future fundraisers to purchase and install planters and flowers to enhance this rejuvenated public space in North Scituate Village. Completion of the project is anticipated shortly after funds become available. The Friends of North Scituate Village are seeking $30,991 in CPA funding to cover the remaining costs of the project. The funds for this request will be appropriated from the CPC’s undesignated fund

04/10/2023
 
Scituate PURPLE DINOSAUR PLAYGROUND

The Friends of Purple Dinosaur (FoPD) are seeking CPA funding for reconstruction of the existing Purple Dinosaur Playground. The existing play equipment is nearly three decades old and in a state of disrepair and lacks compliance with today’s codes for playground safety. Due to the age of the existing play equipment, it cannot be successfully repaired for safety and to meet current standards. The new playground will continue to serve as a recreation space for the entire community with play equipment geared toward children in the 2-5 year age range.

04/10/2023
 
Scituate JENKINS SCHOOL PLAYGROUND

The Jenkins PTO/Jenkins Playground Committee is seeking funding to relocate and replace the existing playground at Jenkins School. The current playground is over 20 years old. A recent report by a Certified Playground Inspector identified many deficiencies and safety issues with the existing play equipment. The playground is heavily used by the school and by the surrounding community during non-school hours.

04/10/2023
 
Scituate WHEELER PARK WINDOW REPLACEMENT

The Scituate Housing Authority requested funding for replacement of 313 windows in the Wheeler Park II development. Owned by SHA, Wheeler Park II is an affordable housing facility built in 1975 off Common Street and provides housing for primarily elderly and disabled residents. The windows need replacement with more functional windows for the residents and ones that are more durable and long-lasting to handle Scituate’s maritime climate.

04/10/2023
 
Scituate MORDECAI LINCOLN DRIVEWAY & PARKING CONSTRUCTION

The Town of Scituate approved the purchase of the historic Mordecai Lincoln Property in the April 2022 Town Meeting to protect a historic property and to conserve a large tract of waterfront land for open space and recreation. The Scituate Conservation Commission requested funding for the design, engineering, and permitting for an expanded driveway and parking area near the existing main house to provide the public access to the land and the views along the river at one of the town’s newest land acquisitions.

04/10/2023
 
Waltham Waltham Housing Authority: Arthur Clark Apts. Design Services for Window Replacement

Architectural and engineering design services for bids and options to replace the windows at Arthur Clark Apts., 48 Pine St.

04/10/2023
 
Carver Union Society building repairs

Further repairs to one of the spires at the Union Society property.

04/11/2023
 
Carver Pickleball Courts

Demolish old tennis courts and construct 6 pickleball courts on Lakeview St.

04/11/2023
 
Carver Adirondak shelter construction

Construct 2 Adirondak style shelters on the Cole Property.

04/11/2023
 
Carver Avenues of Honor

Create an Avenues of Honor recognizing veterans of all services on the byways of Carver.

04/11/2023
 
Carver Outdoor classroom construction

Construct an outdoor classroom, and put in a small dock on Sampson's Pond.

04/11/2023
 
Edgartown PALS Program FY24

The PALS program provides interest free loans to Edgartown families earning less than 100% median income to fund emergency need structural home repairs to ensure safe and sanitary housing conditions.

04/11/2023
 
Edgartown Rental Assistance Program 2023

Rental Assistance to qualified Edgartown families through Dukes County Regional Housing.

04/11/2023
 
Edgartown The Vincent House - Phase 2

Restoration of the historic Vincent House (1672) - Address structural needs, restore roof, walls and windows.

04/11/2023
 
Edgartown Edgartown Lighthouse

Restoration of the lighthouse in partnership with the MV Museum who manages the lighthouse for the town.

04/11/2023
 
Edgartown Tabernacle Roof

Historic Restoration of the Tabernacle Roof at the Camp Meeting Association in Oak Bluffs

04/11/2023
 
Edgartown Robinson Rd. Recreational Area

Funding for development of the Robinson Road Recreational Area

04/11/2023
 
Edgartown Beach Nourishment

Conservation Commission restoration of town beaches by beach nourishment

04/11/2023
 
Edgartown North Wharf bulkhead

Additional funding toward the North Wharf project

04/11/2023
 
Edgartown Whale Tail Park

Restoration of the rescue boat "Half Moon"

04/11/2023
 
Edgartown Cemetery Fence

Phase 1 to restore the iron fencing at Old West Side Cemetery.

04/11/2023
 
Edgartown South Beach

Protection of the dunes at South Beach with "Snow fence"

04/11/2023
 
Falmouth Upper Coonamessett Restoration

Project funds will be used to restore retired cranberry bogs to more naturally functioning streams and wetlands for the purpose of improving water quality as well as ecosystem form and function.

04/11/2023
 
Falmouth Little Pond Conservation Area Public Access Improvements Phase II

Project funds will be used for public access improvements and restoration of open space with parking, trails, benches, kiosk, interpretive signage and native plantings to restore the buffer and water quality at Little Pond.

04/11/2023
 
Falmouth Edward Marks Building Exterior Rehabilitation

Project funds will be used to: 1) insulate walls and replace shingles with wooden clapboard on the front and sides of the building; 2) repair all windows; 3) replace all storm windows with new triple-track storm windows; 4) add wood-louvered shutters on the front and the sides of the building; and 5) paint windows, trim, and front door in accordance with the Historic Structures Report and the Secretary of the Interior's Standards for the Treatment of Historic Properties.

04/11/2023
 
Falmouth Old Burying Ground - Ground Penetrating Radar Survey

Project funds will be used to conduct a ground penetrating radar (GPR) survey to ensure all markers are found prior to any restoration work commencing.

04/11/2023
 
Falmouth Highfield Hall Exterior Rehabilitation & Water Abatement

Project funds will go toward rehabilitation of critical exterior features and water abatement work needed for the building’s longevity including the windows, roof, chimney flashing, cladding, gutters, downspouts, fascia, trim, doors, decking, and painting. The project will comply with the Secretary of Interior’s Standards for the Treatment of Historic Properties.

04/11/2023
 

Pages

CSV