CPA Projects Database

City/Town Namesort ascending Description Approval Date
Categories
Abington Turntable Park

Engineering study and excavation of the old railroad turntable located on the Rail Trail. Study will determine if the area can be used to create a park in the future.

05/20/2019
 
Abington Summer Concerts Pt. 2

Additional funds needed to begin work on the entrance and bridge at Reilly Field used for the Summer Concert series. Funds will be put towards an engineering study and a more detailed bridge design.

05/20/2019
 
Abington Library Story Garden

Restoration and preservation of library garden.

05/20/2019
 
Abington Pickleball Courts

Lighting for town pickleball courts.

05/21/2018
 
Abington Reilly Track

Track resurfacing.

05/21/2018
 
Abington Summer Concerts Pt. 1

Lighting installed around open space for town use and summer concerts.

05/21/2018
 
Abington Memorial Building (American Legion)

Renovations and updates to exterior of building to help preserve the building.

05/21/2018
 
Abington DPW Fencing

New fencing for various town fields and playgrounds.

05/21/2018
 
Abington Summer Concerts Pt. 2

Improvements to bridge and entrance to town open space and summer concert field.

05/21/2018
 
Abington Griffin Dairy Farm

Will be adding walking paths, foot bridges, and fields to town owned open space area.

05/21/2018
 
Abington Memorial Building (American Legion)

Restoration to Abington Memorial Building. Construction to envelope of building in order to preserve the building.

06/01/2017
 
Abington DPW Playground

Replacement of broken playground equipment for Arnold and Laidler Park. Replacement of wood chips and fence at Laidler.

06/01/2017
 
Abington Griffin Dairy Farm

Open space walking paths, recreation field space, fencing and parking lot

06/01/2017
 
Abington Island Grove Bridge

Study of Island Grove Bridge. Determining what is needed for restoration.

06/01/2017
 
Abington Open Space/Recreation Plan

Updated open space/recreation plan

04/03/2023
 
Abington Green Wave Connector Trail Design

Design of walking trail connecting Abington High School to Buckboard Lane through existing easement on conservation land. This is phase 1 of a multiphase project.

04/03/2023
 
Abington Griffin Dairy Farm

New fencing along walking trails through Griffin Dairy Farm.

04/03/2023
 
Abington Interpretive Signs

Interpretive signs for Island Grove Park noting historical significance.

04/03/2023
 
Abington Historical Inventory

Match for grant to provide a historical inventory report throughout Abington.

04/03/2023
 
Abington Island Grove Bridge

Design of repairs to the historic Island Grove Bridge. This is a multiphase rehabilitation project.

04/03/2023
 
Abington Island Grove Pavilion Repairs

Rehabilitation of historic pavilion built in 1893 at Island Grove Park.

04/03/2023
 
Abington Affordable Housing Trust Fund

Funds for the Abington Affordable Housing Trust to be used for future housing projects, housing aid for first time homebuyers and repairs to make potential housing projects up to code.

04/03/2023
 
Abington Housing Trust Action Plan

Third party report plan to list and prioritize all existing housing needs and potential housing related projects.

04/03/2023
 
Abington Orchard Lane Land Purchase

Purchase or acquire two parcels of land located on Orchard Lane for use of conservation land.

09/27/2022
 
Abington Beaver Brook Playground

Removal of old Beaver Brook Playground and materials/installation of new playground. Removal of trees and materials around the existing playground to expand the space.

04/04/2022
 
Abington Affordable Housing Trust Fund

Affordable Housing Fund to ease home costs for existing residents and/or assist in construction of affordable and senior housing.

04/04/2022
 
Abington Island Grove Pond Cleanup

Treatment of invasive plant species growing in the Island Grove Pond. Treatment is based of recommendation from the 2019 pond study completed.

04/04/2022
 
Abington Island Grove Snack Shack

Replacement of the Island Grove Pool snack shack

04/04/2022
 
Abington Softball Fields Updates

Updates to the Beaver Brook softball fields. Updates include a new backstop, fencing, irrigation and dug out improvements.

04/04/2022
 
Abington Restoration of the Exedra

Restoration of the exedra and historical marker for local veterans

04/04/2022
 
Abington Beaver Brook Playground

Phase II of funding for removal of old wooden playground, removal of dangerous trees and materials/installation of new playground.

05/24/2021
 
Abington Griffin Dairy Farm

Instillation of new well at Griffin Dairy Farm. The well will support the community garden and fields.

05/24/2021
 
Abington Beaver Brook Playground

Removal of old Beaver Brook Playground and materials/installation of new playground. Removal of trees and materials around the existing playground to expand the space.

06/22/2020
 
Abington Affordable Housing Trust Fund

Affordable Housing Fund to ease home costs for existing residents and/or assist in construction of affordable and senior housing.

06/22/2020
 

Pages

CSV