CPA Projects Database

City/Town Namesort ascending Description Approval Date
Categories
Yarmouth Ancient Cemetery Grave Marker Preservation

Preservation and protection of grave markers in Ancient Cemetery from deterioration or destruction. Seven markers completed.

04/26/2022
 
Yarmouth Sandy Pondy Phase 1 Improvements

Final design and construction of Phase 1 improvements, including an inclusive playground and splash pad. Playground and splash pad opened in June 2023.

11/02/2021
 
Yarmouth Baxter Gristmill Phase 1 Structural Repairs

Repairs to the west side of the Baxter Gristmill building including sills, crossbeam, door frame, trim, shingles and side board.

05/22/2021
 
Yarmouth Municipal Affordable Housing Trust #15

Annual funding to the Yarmouth MAHT to create, preserve and support affordable housing at or below 80% AMI.

05/22/2021
 
Yarmouth Municipal Affordable Housing Trust Buy Down

Subsidize purchase of market rate housing to affordable price.

05/22/2021
 
Yarmouth Hands of Hope FY22

Funding for overdue rent payments for Yarmouth residents, or first/last/security for relocation within Yarmouth.

05/22/2021
 
Yarmouth Cape Playhouse Preservation

Preservation of northern façade of the Cape Playhouse located in Dennis, MA

05/22/2021
 
Yarmouth Riverwalk Park and Boardwalk Loop Supplemental Construction

Supplemental funding for the Construction of the Riverwalk Park and Boardwalk loop.

05/22/2021
 
Yarmouth Cape & Islands Veterans Outreach Center

Funding for Veterans Housing in Dennis. Solar panels installed. Retaining wall completed.

05/22/2021
 
Yarmouth Town Record Preservation

Identification and classification of stored documents. Preservation of and improved access to historic documents through scanning, refiling and permanent storage.

05/22/2021
 
Yarmouth Cultural Center Roof Rehab & Door Replacement

Preservation of the Cultural Center of Cape Cod with roof and baluster replacement as well as replacement of three exterior doors with historically accurate material. Roof work has been completed.

05/22/2021
 
Yarmouth Taylor Bray Farm Barn Phase 1 Structural Repairs

Phase 1 Structural Repairs to the Taylor Bray Farm Barn including a new foundation and structural reinforcements.

05/22/2021
 
Yarmouth HECH Emergency Loan Program

Funding to preserve homes for low-income residents with financial and technical assistance

06/22/2020
 
Yarmouth Municipal Affordable Housing Trust #14

Annual Funding to the Yarmouth Affordable Housing Trust to create, preserve, and support affordable housing at or below 100% of AMI

06/22/2020
 
Yarmouth Town-wide Archaeological Reconaissance

Identification of potential archaeological sites in Yarmouth. Products include sensitivity maps with relevant sites and surveyed areas and a written inventory of potential archaeological sites.

06/22/2020
 
Yarmouth Municipal Affordable Housing Trust #13

Annual deposit for the Housing Trust to create, preserve, and support affordable housing at or below 80% of the Area Median Income.

05/05/2019
 
Yarmouth Eviction Prevention

Hands of Hope - Financial assistance to low-income residents to afford rent so that they can avoid eviction.

05/05/2019
 
Yarmouth Yarmouth Housing Emergency Loan Program

Technical and financial assistance to income-qualifying residents for preserving homes.

05/05/2019
 
Yarmouth Taylor Bray Farm Barn Design and Engineering of a Rehabilitation Plan

Design and Engineering plan for the rehabilitation of the historic barn. Work is ongoing in conjunction with Taylor Bray Farm Phase 1 Structural Repairs (Project 51588).

05/05/2019
 
Yarmouth Riverwalk Park and Boardwalk Loop - Design, Permitting, and Partial Construction

Design, Permitting, and Partial Construction of a Riverwalk Park and Boardwalk Loop at the former Drive-In site. Local permits have been approved.

05/05/2019
 
Yarmouth Yarmouth Affordable Housing Trust General Deposit

Annual deposit for the Yarmouth Affordable Housing Trust to create, support, and preserve safe and decent housing affordable to residents.

05/05/2018
 
Yarmouth Sandy Pond Recreation Area Engineering and Design

To perform the engineering and design of Sandy Pond Recreation Area according to the Master Recreation Plan.

05/05/2018
 
Yarmouth Parkers River Tidal Restoration

To preserve open space, improve water quality, rebuild a healthy ecosystem, and restore the natural tidal flows to the Parkers River estuary and Swan Pond by widening Parkers River bridge from the existing 18 feet to 30 feet.

05/07/2016
 
Wrentham Council on Aging's Raised Garden Bed

Repair of the Council on Aging's Raised Garden Bed originally built in 1999.

11/16/2020
 
Wrentham Wrentham Housing Authority Improvements

Installation of a basketball hoops at New Emerald Lane.

11/04/2019
 
Wrentham Restoration and Preservation of Cowell Paintings

The preservation and restoration of the remaining Cowell paintings in the possession of the Wrentham Historical Commission.

11/15/2021
 
Wrentham Roderick School Playground Project

Improve the accessibility of the Roderick School playground to comply with state and federal laws/standards. Adding new play structures and surface.

11/16/2020
 
Wrentham Lake Pearl Invasive Weed Project

Part 2 - $27,100 Additional allocation needed due to Covid related cost increases for the purchase of a mechanical, aquatic weed mechanical harvester and trailer.

11/16/2020
 
Wrentham Rice Complex Playground

Creation of a high quality playground within the Rice Complex recreation area that meets current standards for quality, healthy play and accessibility for all youth.

11/04/2019
 
Wrentham Wrentham Open Space and Recreation Plan

Creation of a strategic plan that will map out how the town envision's using land and open space/recreation assets into the future.

11/04/2019
 
Wrentham Restoration and Preservation of Cowell Paintings

Part 1 : Restoration and preservation of four of the paintings and frames of Joseph Goss Cowell a Wrentham resident and renowned artist, sculptor and designer.

11/04/2019
 
Wrentham Lake Pearl Invasive Weed Project

Purchase of a mechanical harvester for removal of invasive aquatic weeds to help preserve Lake Pearl.

11/04/2019
 
Wrentham Original Congregational Church - Pillar Restoration

Rehabilitation and Preservation of Greek Revival Pillars on the 200 year old Original Congregational Church of Wrentham which is registered as a National Historic Landmark with the National Park Service.

11/21/2022
 
Wrentham Conservation & Recreation Land Acquisition Fund

Fund established to acquire land for the purposes of conservation, passive and/or active recreation.

11/21/2022
 
Wrentham Preservation of Mirror Lake

Continued funding of Mirror Lake weed mitigation, and sediment study in an effort to preserve this open space in town of Wrentham.

11/15/2021
 
Wrentham Historical Commission Archivist

Archiving project including the funding of an archivist contractor and archivist supplies to catalog and preserve significant artifacts in the Wrentham Historical Commission’s possession.

11/15/2021
 
Wrentham William Rice Complex Walking Path

Phase 2 of the Rice Recreation Complex master plan.

11/16/2020
 
Wrentham Metacomet Greenway Engineering Feasibility Study

Engineering feasibility study to determine the anticipated route, access to future project needs and produce estimated costs for the proposed 5.3-mile portion of a rail trail in Wrentham, MA.

11/16/2020
 
Wrentham Housing Authority Bulkhead and Storm Door Replacement

Supply project materials for replacement bulkheads and storm doors.

11/16/2020
 
Wrentham Preservation of Mirror Lake

Aquatic weed treatment and storm water runoff study to preserve Mirror Lake.

11/04/2019
 
Wrentham Lake Archer Invasive Weed Control Project

3 year project to control and potentially eradicate an invasive weed (Brazilian waterweed) while it is still limited to Lake Archer.

11/04/2019
 
Williamstown Dolan-Jenks Barn Preservation

To fund a grant to the Williamstown Historical Museum for preservation of the Dolan-Jenks Barn Double entered project in error.

06/09/2021
 
Williamstown Sands Springs ADA P20SS

For creating ADA accessibility to the second floor community room at Sand Springs Recreational Center

05/21/2019
 
Williamstown A Brush With Kindness

Collaborative with HfH. The goal of the program is to boost the HgH Critical Repairs Program in Williamstown. This program helps low income homeowners make necessary home repairs: those that address accessibility, safety and efficiency.

07/01/2018
 
Williamstown Affordable Housing Trust

To fund a grant to the Williamstown Affordable Housing Trust for a Critical Repairs Program in partnership with Northern Berkshire Habitat for Humanity. P19AT

05/15/2018
 
Williamstown Sand Springs Recreational Center

To develop detailed plans, designs and costs for conversion of Spruces land into a community amenity.

05/17/2016
 
Williamstown Berkshire Housing/Proprietors Field

Creating additional housing.

05/20/2014
 
Williamstown Berkshire Housing/Proprietors Field

Creating additional housing at Proprietors Field

05/15/2012
 
Williamstown Linear Park Fence

To preserve Linear Park by the installation of protective fencing

05/16/2006
 
Williamstown Store at Five Corners

For historic preservation purposes with respect to the Store at Five Corners P23FC

06/14/2022
 

Pages

CSV