Franklin Nason Street Tot Lot

The current playground at this site is antiquated and in need of improvements. The new playground will be designed and built using the best fit equipment to meet the social, cognitive, sensory, and physical needs of children ages 2-5 year old. This new and improved playground will include parallel play and custom play equipment to represent the Town of Franklin. The current pricing estimate for this project is $300,000, this pricing includes all of the modifications needed to have the lot comply with all ADA (Americans with Disabilities Act) regulations. Original appropriation was for $300,000. Total actual amount expended was $296,170.

06/22/2022
 
Franklin Historical Museum Cupola

This project will restore the Cupola on top of the Franklin Historical Museum Building, the cupola will be lifted off of the building, restored, painted and reattached.

06/22/2022
 
Franklin Red Brick School House - Exterior Preservation

The Red Brick School house is a town owned building on the National Registry of Historic Places. This project would involve lead paint remediation on the exterior of the building, brick restoration and preservation, in addition to some structural and cosmetic improvements to the exterior of the building (doors, flagpole, windows) and surrounding landscaping, signage, landscaping and general improvements are also included. October 19, 2022 additional funds were appropriated in the amount of $50,000. $36,640 from Historic Preservation Reserve and $13,360 from Budgeted Reserve.

06/22/2022
 
Franklin Maple Hill Land Borrowing

The Town purchased open space "Maple Hill Land" for a total of $4.59 Million. These CPA funds will be used to pay the annual Maple Hill Land Bond Debt Service. The Town borrowed $3,040,152 for the Maple Hill Land, the bond premium that the Town received further reduced the borrowing amount to $2,965,000. This money will be borrowed against CPA future revenues. The Town also committed $1,559,900 from the 2017 sale of the Pond Street Sewer Beds towards the purchase of this land. On June 17, 2021 the CPC voted unanimously to purchase the Maple Hill land and committed to using approximately $210,000 of CPA money every year for twenty years to pay off the purchase and interest costs associated with the purchase of this land. This year the CPC and Town Council voted to appropriate $271,489 to pay for a portion of the debt service for the Maple Hill Borrowing.

06/22/2022
 
Franklin Franklin Ridge Affordable Housing Project

JNJUHL and Associates, LLC has been approved through a friendly Chapter 40B process to construct a three-story wood framed building that will contain (54) One-Bedroom Units and (6) Two-Bedroom Units, all of which would be affordable to seniors with incomes at or below 60% of the median for the long-term. The One Bedroom units will be a minimum of 660 square feet and the Two Bedroom Units will be 880 square feet. In addition, approximately 10% of the floor area will be developed into supportive service space for social service staff in order to provide resources for these residents to enable them to live independent and productive lives. There will be a minimum of 65 parking spaces to accommodate the needs of this new senior housing community. The Franklin Ridge Senior Housing project received a 40B Comprehensive Permit from the town of Franklin in December of 2019. In addition, the project received the Franklin Conservation Commission’s approval of the Project’s Determination of Applicability in November of 2019. These monies will specifically go towards the inputting of a sewer line and the prepared site work for this project.

06/22/2022
 
Franklin Dalzell Land Purchase

David and Kathleen Dalzell sold three unimproved parcels of land to the Town of Franklin for the price of $250,000. 1st parcel on Bald Hill contains 16 acres +/-. 2nd parcel is located on Grove St. near Mine Brook contains 1 acre +/-. 3rd parcel located off Pond St. contains 1 acres +/-. The Town Council desired to purchase land for open space and passive recreation and to access other Town owned land. The CPC voted to recommend that the Town purchase said land and fund the purchase from Community Preservation Fund Open Space account in the amount of $50,151 and from the Budgeted Reserve account in the amount of $199,849 for a total of $250,000. Town Council approved this Resolution #22-90 on 12/14/23.

12/14/2022
 
Franklin Schmidt Farm

TBD

05/25/2023
 
Franklin Fletcher St. Playground

Fletcher St. Playground will receive a new accessible play structure with a poured in place surface in the Spring. Appropriation of $150,000 was approved on May 25, 2023 but project will not commence until FY24.

05/25/2023
 
Franklin Beaver St. Challenge Course

Challenge Course at Beaver Pond Park - construction of an accessible press box with a ramp at the mid field at Beaver Pond, with walkways. Appropriation of $150,000 was approved on May 25, 2023 but project will not commence until FY24.

05/25/2023
 
Lowell Downtown Lowell Building Restoration

Lowell Development and Financial Corporation has received $500,000 of CPA Funds for a Historic Preservation Loan Fund. The applicant proposes to use the funds to create a loan fund that will be used to lower interest rates, help developers defer payments, etc. with the goal of offsetting costs for Downtown developers to restore and preserve historic Downtown buildings. The loan fund will be used for both historic preservation Downtown, as well as potentially for Community Housing projects. The applicant is currently seeking an eligibility determination from the Community Preservation Committee.

02/15/2022
 
Lowell 555 Merrimack Street

Construction of 27 affordable units for individuals/families with substance abuse disorders, and improvements to the adjacent canal walkway. The applicant will grant the City of Lowell a 30-year affordability restriction on the 27 units.

02/15/2022
 
Lowell Acre Crossing

Construction of 17 affordable units for individuals/families earning up to 80% AMI. The 17 units shall carry an affordability restriction for 15 years. The affordable units are a part of a larger mixed-use development.

02/15/2022
 
Lowell A Place to Live - Lowell

The development of pre-application plans to create 24-30 affordable, single-occupancy units. The units shall be have an affordability restriction for 30 years.

02/15/2022
 
Lowell 1827 Bell and Wheel Repair

The restoration of the historic church bell and wheel.

02/15/2022
 
Lowell Improve Clemente Park

Capital improvements to Clemente Park, a City park. Improvements include new playground equipment, new playground surface, and basketball court improvements.

02/15/2022
 
Lowell 80 Gorham Street - Structural Façade Restoration

Restoration of the façade and structural repairs to the historically significant building at 80 Gorham Street.

02/15/2022
 
Lowell Lowell City Hall Stained Glass Restoration

The preservation and restoration of 24 stained glass windows in Lowell City Hall.

02/15/2022
 
Lowell Protecting Lowell's Last Farm

The purchase and preservation of Lowell's last farm, Rollie's Farm. The final plans for the property include walking trails, community garden, and educational programs. The site will be open to the public and preserved in perpetuity.

02/15/2022
 
Lowell Whistler House Museum of Art - Park and Courtyard Project

Capital improvements to the park abutting the Whistler House Museum of Art. The park is open to the public.

02/15/2022
 
Lowell One + Lowell

Merrimack Valley Housing Partnership applied for $500,000 of CPA funds for the support of Community Housing. The applicant proposes to create an affordable homeownership program in Lowell based on the OnePlus Boston program. The program would use CPA funds to provide interest rate discounts on 30-year fixed rate mortgages for low- and moderate-income, first time homebuyers. The program would assist eligible homebuyers in the purchase of market-rate and higher priced deed-restricted properties.

02/15/2022
 
Lowell 635 Middlesex Street

Restoration of the historic building at 635 Middlesex Street including the restoration of the brick facade, and structural work.

06/27/2023
 
Lowell St. George's Church Dome

Restoration of the historic church dome of St. George's Church.

06/27/2023
 
Lowell Hadley House

Creation of 5 affordable units of veterans housing. The work also includes restoration of the historic Hadley House.

06/27/2023
 
Lowell Girls Inc: Connect Stronger Together Phase 1

The restoration of the historic structure at 228 Worthen St, Lowell, MA. Work to include windows, siding, and roofing.

06/27/2023
 
Lowell O'Donnell Park

Construction of a new playground and capital improvements to the existing park.

06/27/2023
 
Northbridge Linwood Basketball Courts

Town approved project that will improve the basketball courts including a new playing surface, improved drainage and new lighting.

05/03/2022
 
Northbridge Castle Hill Farm conservation land

Purchase 97.67 acres of land known as " The Castle Hill Farm." The land is for passive recreation. The Metacomet Land Trust holds a conservation restriction

10/25/2022
 
Watertown Irving Park

Rehabilitation of Irving Park to improve passive recreation through ADA access renovations, lighting, plantings, improved hardscape, seating, and fencing.

06/21/2022
 
Watertown City Hall 1630 & 1930 Geographical Paintings

Restoration and preservation of two historically significant paintings that flank the lobby of Watertown City Hall, depicting a map of Watertown in its founding year, 1630 and an aerial view in its tercentenary year, 1930.

06/21/2022
 
Watertown Preservation of Old Burying Ground and Common St. Cemetery

Development of masterplans for the Old Burying Ground and Common Street Cemetery to prescribe rehabilitation and preservation, establish priorities, estimate costs, and plan for future maintenance.

04/25/2023
 
Watertown Commander's Mansion Cultural Landscape Report and Bldg. Assessment

Development of a Cultural Landscape Report (CLR) and building assessment of the Commander's Mansion property found on the MA Register of Historic Places. The CLR will guide the restoration and preservation priorities of this property.

04/25/2023
 
Watertown Edmund Fowle House Museum Gutters Replacement

Replacement of deteriorated wooden gutters and fascia boards on the Edmund Fowle House Museum, found on the National and Massachusetts Register of Historic Places, with fiberglass gutters and cedar fascia boards.

04/25/2023
 
Watertown 103 Nichols Avenue Group Home

Predevelopment funds for engineering fees, architectural design, construction and bidding documents to build a 5-bedroom group home for individuals with developmental disabilities, affordable at 60% Area Median Income.

04/25/2023
 
Framingham Framingham Accessible Dock (Waushakum Beach)

The purchase and installation of an adaptive boat dock at the City Beach at Lake Waushakum, to also include funding of the dock bulkhead and necessary permit expenses for environmental permitting. This project will expand recreational offerings by providing universal access to Lake Waushakum Beach, and opening up boating to people with disabilities, older people and others who might otherwise face barriers to access. This project will complement other efforts to improve the site and will allow more people to enjoy this valued resource.

04/25/2023
 
Framingham Universally Accessible Walking Trail with Scenic View Platforms on the Carol Getchell Trail

Construction of an ADA compliant compacted gravel walking path on the north side of the Getchell trail beginning at Little Farms Road, along the Sudbury River, and to build two viewing platforms and ramps, to replace four pedestrian bridges, and to fund the design and permitting. This project, to improve the north side of the Carol Getchell Trail in Saxonville, will expand recreational offerings with universal access. It will open up this natural environment and scenic views along the Federally designated Wild and Scenic Sudbury River to people with disabilities, older people, and others who might otherwise face barriers.

04/25/2023
 
Framingham Design Study for New Community Garden Sites in Framingham

The funding will be used to hire a consultant to develop a Community Garden Design Study at two City parks: Bates Road Park and Roosevelt Park. Both are located on the south side of Framingham in environmental justice neighborhoods. The design process will include community participation and various options for site design, and will incorporate accessibility and universal design. The study will also include regulatory permitting and cost estimates for future implementation.

04/25/2023
 
Framingham Arlington Street Park Construction

Providing two elements, the playground equipment and a splash pad, including materials and construction, as part of a larger construction program to update the Arlington Street Park. This project to redevelop the Playground and build a Splash Pad at the Arlington Street Park will expand recreational offerings to an underserved community. These improvements are part of a larger effort to revitalize the Park and address the current deteriorated condition, improve accessibility, expand recreational offerings, provide new amenities and furnishings, and increase security at the site.

04/25/2023
 
Framingham The Academy - Preservation and Accessibility

The funding will be used for Design Services including site planning and construction documents to facilitate an ADA compliant walkway and public access via the main entry to the historic (1837) Academy Building, as well as plans for restoration of the front portico, and preservation treatment of historic artifacts on lawn of the building. Funding will also be used to widen the interior entry door for ADA compliant access into the building. This site is in the State MACRIS database and on the National Register of Historic Places.

04/25/2023
 
Framingham Edgell Memorial Library - Preservation and Restoration

The funding will be used to restore broken historic Minton floor tiles in the main hall of the building, restore damaged walls and replicate an historic stenciled border on main hall walls, and restore damaged walls in the director’s office, which will eventually become exhibit space. Project funds will also be used for the CPC to hire to an independent historic preservation consultant to ensure that the rehabilitation and restoration will be done in compliance with the Secretary of the Interior’s Standards for Rehabilitation of Historic Structures. Funding will also pay for structural engineering review of the main hall floor. This site is in the State MACRIS database and on the National Register of Historic Places. This work will address a long-standing need to preserve this historic resource and will help facilitate better use of this space to educate more in the community about Framingham’s history.

04/25/2023
 
Framingham Chris Walsh Memorial Trail Design

The funding will be used to assist in the engineering, design and permitting of the Chris Walsh Memorial Trail, an accessible trail to be constructed in Farm Pond Park, around and through its Ponds, along the Sudbury Aqueduct with connections to Cushing Park and other trail networks. This project will ultimately increase recreational opportunity for all Framingham residents and will support access to this centrally located, highly utilized waterfront recreational park for South Framingham Environmental Justice neighborhoods.

04/25/2023
 
Framingham 103 Guild Street

The funding will be used for the purchase of 11.13 acres of undeveloped land in South Framingham for resource protection, stormwater management, and passive outdoor recreation. The parcel, crossed by Beaverdam Brook, is predominantly wetlands and includes 3 to 4 acres of wooded upland and trails. It is part of a larger tract that includes land in Sherborn and Ashland. The site will also offer passive outdoor recreation with its walking trails and potential connections to current and future off-site trails in and beyond the City, thus offering a valuable passive recreation opportunity to nearby economic justice neighborhoods and the larger community.

04/25/2023
 
Framingham Edgell Grove Cemetery Tomb House Emergency Roof Repair

The funding will be used for the emergency roof repair of the historic (1885) Tomb House in the Edgell Grove Cemetery; including replacement of the damaged slate roof, flashing, gutters, and downspouts, and associated work. This is the first phase of a long-range plan to repair, restore and repurpose the building, which is listed in the State MACRIS database and on the National Register of Historic Places. This project, to replace the damaged slate roof, underlayment, flashing, gutters, and downspouts of the historic (1885) Tomb House, previously used as a Receiving Tomb at Edgell Grove Cemetery, will help to stabilize an identified cultural resource of the City.

04/25/2023
 
Framingham Temple Street Park Improvements

The funding will be used for the planning and redesign of the Temple Street Park, a park located in a central west neighborhood off of Route 9, with future playground to offer new playground equipment and surfacing, various amenities, and increased accessibility and safety. This design phase will include a site assessment and review of conditions, schematic design alternatives and cost estimates, as well as community outreach and participation, for an updated, accessible park and playground. This project to plan for the future redevelopment of a deteriorated and unsafe park and playground at the Temple Street Park will ultimately revitalize the park and expand recreational offerings to an underserved community to meet their recreation needs.

04/25/2023
 
Greenfield Historical Society Document Preservation

Preservation of documents from the Estate of Peter Miller.

05/17/2023
 
Greenfield FCAS Barn Rehabilitation

Rehabilitation of cattle barn roofs at Franklin County Fairgrounds for the Franklin County Agricultural Society.

05/17/2023
 
Greenfield MOIH Shop Equipment Restoration

Restoration of antique Goodell-Pratt Light Machine Shop.

05/17/2023
 
Greenfield CSO Wells Street Shelter Expansion

Clinical and Support Options is creating 36 studio apartments for permanent support of housing at 60 Wells Street.

05/17/2023
 
Greenfield Pickleball Court Expansion

Design, engineering, and site readiness of a multi-court pickleball facility adjacent to Abercrombie Field.

05/17/2023
 
Greenfield Highland Park Trail Restoration

Renovation of trails in Highland Park and Temple Woods.

05/17/2023
 
Greenfield GHS Track ADA Access

Creation of concrete connection path to provide access to the GHS track and spectator viewing area.

05/17/2023
 