CPA Projects Database

City/Town Name Description Approval Date
Categories
Greenfield Beacon Park Improvements

Installation of two new bocce courts and replacement of two water fountains at Beacon Park.

05/17/2023
 
Greenfield Shattuck Park Fitness Cluster

Installation of a fitness cluster at Shattuck Park.

05/17/2023
 
Greenfield Citywide Outdoor Site Amenities

Installation of interactive play amenities.

05/17/2023
 
Lancaster Resurface infields at Thayer Field and Mill St

Restore the infields of Thayer Field and Mill St. baseball and softball to ensure a safe area to play games.

05/03/2022
 
Lancaster Thayer Memorial Library Window Restoration

Restore two sets of window casements in the historic wing of the library.

05/03/2023
 
Lancaster Middle Cemetery Pre-restoration Assessment Plan

Obtain an assessment of the entire Middle Cemetery to determine where the most urgent areas for restoration. Ancestors of Lancaster's founding families are buried here as well as no less the 37 Revolutionary soldiers and 14 Civil War soldiers.

05/03/2023
 
Lancaster Thayer Field and Mill St dugout replacement/build

To provide a safe covered area to provide relief from the weather. Also, to provide equity as the girls' teams do not have such structures.

05/03/2023
 
Lancaster Thayer Field Fence Replacement

Replacement of the fencing surrounding the baseball fields. The current chain-link fence has holes and creates safety concerns. The replacement fence will be rubber/vinyl coated, that is more suited to an athletic and the users.

05/03/2023
 
Lancaster bulfinch Meeting House brick portico restoration

Restoration of the front and west side porticos, replace broken bricks and relevel the surface and repoint the granite steps. This building is a National Historic Landmark

05/03/2023
 
Milton Town Lock-Up Bldg Restoration

Restoration to historic building

05/01/2023
 
Milton Forbes House Museum

Restoration of historic building

05/01/2023
 
Milton Milton Affordable Housing Trust

Funding to support affordable housing projects

05/01/2023
 
Milton Milton Garden Club Spalding Garden

Restoration of historic Spalding Garden

05/01/2023
 
Milton Turners Pond Path

Reconstruction of recreational path

05/01/2023
 
Milton Peverly Park Playground

Planning and design for construction of new playground

05/01/2023
 
Milton Wharf Park Plan

Planning and design for reconstruction of park

05/01/2023
 
Milton Mary c. Lane Park Baseball Field

Adding fencing and safety improvements to ballfield

05/01/2023
 
Milton Middle Gile Sports Complex

Lighting improvements for safety and energy conservation

05/01/2023
 
Milton Pickleball Court Study

Find location for new pickleball courts

05/01/2023
 
Milton Pope's Poind Pedestrian Bridge

Design and construct pedestrian bridge

05/01/2023
 
Plainville Field of dreams design

Engineering design for expansion of Field of Dreams recreation complex

06/05/2023
 
Shrewsbury 1830 Brick Schoolhouse Heatpump

This project proposes to appropriate $65,000 from the Historic Resources Reserve for installation of a highly efficient electric heat pump HVAC system which will serve the first and second floors as well as other weatherization measures throughout the entire building as identified in an energy audit conducted by the Center for EcoTechnology (CET) on December 13, 2022. Installation of these systems will assist in the preservation of this historic structure through improved temperature and humidity control.

05/16/2023
 
Shrewsbury Prospect Park Pergola Restoration

This project proposes to appropriate $85,500 from the Historic Resources Reserve Account to conduct a Site and Structural Assessment of the Prospect Park Pergola which is over 100 years old. The site and structural assessment will be conducted by a Certified Landscape Architect with experience in Historic Preservation. The scope of the assessment will focus on restoration of the pergola, site access and use as community gathering space. Project deliverables will include the site and structural assessment, design specifications, recommendations, and assistance in preparing bid documents.

05/16/2023
 
Shrewsbury Mt. View Cemetery Historic Gravestones

This project proposes to appropriate $5,500 from the Historic Resources Reserve Account to conduct an Inventory and Assessment of historic gravestones located in the southeast corner of the Mt. View Cemetery, Sections 1-9. The cemetery is located in the Shrewsbury Historic District and is designated on the State Register of Historic Places and National Register of Historic Places. The Inventory and Assessment will review the current condition of historic gravestones, some of which date to the 1730’s, and prioritize their specific needs for restoration and preservation in accordance with the practices of the United States National Parks Service.

05/16/2023
 
Shrewsbury District #5 Schoolhouse Facility Review

This project proposes to appropriate $2,000 from the Historic Resources Reserve to conduct a Facility Review by the Institute for Human Centered Design. The Facilities Review will evaluate ADA accessibility and pedestrian infrastructure of the structure itself as well as surrounding routes and parking. The District #5 Schoolhouse was built in 1828, is the oldest schoolhouse in Shrewsbury and is listed on the State Register of Historic Places and National Register of Historic Places.

05/16/2023
 
Shrewsbury Arrowwood Park Restoration

This project proposes to appropriate $40,000 from the Open Space and Recreation Reserve Account for design services for restoration of the playground equipment at Arrowwood Park. The project will redesign the existing playground equipment and surface to provide an improved playground design meeting modern design and safety standards. This park currently serves a large portion of the community, however the current condition deters significant use.

05/16/2023
 
Shrewsbury Town-wide Playground Assessment

This project proposes to appropriate $70,000 from the Open Space and Recreation Reserve Account for design services for restoration of the playground at Edgemere Park as well as a town wide assessment of the nine (9) Town parks and six (6) school parks. Many of the playgrounds were built as part of subdivision construction or fundraising done by school PTO groups. The majority of the playgrounds do not have accessible surfaces or modern safety surfaces. The playgrounds do get a lot of use and are typically 15 to 30 plus years old. Play for children is essential for their development of social and motor skills. Designing a new playground at Edgemere Park will align with the Parks Division goals for continuing to improve recreation areas for our community.

05/16/2023
 
Shrewsbury Dean Park Basketball Courts

This project proposes to appropriate $375,000 from the Community Preservation Reserve Account for reconstruction of the existing basketball courts. The Town’s 2018 Master Plan indicated the basketball courts were in poor condition and needed to be rebuilt. The courts currently have deep cracks, backboards which need to be upgraded, and fences which are worn. The fenced in courts will also need to have a sidewalk added to make it more accessible. This project will rebuild the three (3) basketball courts, two (2) of which are fenced in.

05/16/2023
 
Shrewsbury Camp Wunnegan Parking

This project proposes to appropriate $142,000 from the Community Preservation Reserve Account for design and construction of nine (9) standard and one (1) ADA accessible parking spaces at 645 and 645R Grafton Street fka “Camp Wunnegan”. This will improve accessibility to and use of the associated trail systems for more equitable enjoyment by the community. The proposed design also incorporates improved storm water management systems.

05/16/2023
 
Shrewsbury Howe/Sears Farm Acquisition

This project proposes to appropriate $435,000 from the Fund Balance Account for acquisition for conservation purposes under Chapter 44B, parcels of land located at 443 and 457 Lake Street and 104 Grove Street aka the Howe/Sears Family Farm. The proposed project would be the contribution of half of the funds required to purchase the property with the remaining funds provided via American Rescue Plan Act (ARPA) funds. With the purchase of this property the Town hopes to create connectivity between current Town owned land to promote passive recreation, such as walking trails, and preserve open and natural space in Town. These parcels help to create connectivity between Lake Street Park all the way to Camp Wunnegan through sidewalks and walking trails. The Town is working to develop a formal trail network throughout the Town and this project contributes to this effort. The Greater Worcester Land Trust has expressed interest in the project and holding the conservation restriction on the property.

05/16/2023
 
West Stockbridge Historical Society

Renovation of 2 existing bathrooms on the first and second floors of the Historical Society Building at 9 Main Street to be ADA compliant.

01/10/2023
 
Whitman Inventory of Historic Resources

The goal of the Inventory of Historic Resources is to support efforts to identify and plan for the protection of the significant historic buildings, structures, archaeological sites, and landscapes in the Town of Whitman.

05/01/2023
 
Whitman Stetson Terrace Underground Wiring Project

Currently, the Stetson Terrace development has underground wiring that is deteriorating and needs replacement as soon as possible to avoid the loss of electricity in occupied units.

05/01/2023
 
Whitman New Picnic Tables for Whitman Town Park

The picnic tables surrounding the playground area of the playground are in need of replacement. This will replace the older tables and add additional tables that are ADA approved. These new picnic tables will promote family activity at the park and allow everyone to be able to access the park for picnics and social activities.

05/01/2023
 

Pages

CSV