CPA Projects Database

City/Town Name Description Approval Date
Categories
Tisbury Martha's Vineyard Regional HS Track/Field Replacement

To resurface existing track at regional high school. Track is open to the public.

04/15/2015
 
Tisbury Lagoon Pond Bridge Waterfront Park

To expand a waterfront park in conjunction with the new lagoon drawbridge.

04/15/2015
 
Tisbury Dukes Co. Regional Housing Auth. Rental Assistance

To allow low income households to participate in subsidized housing.

04/15/2015
 
Tisbury KC Theatre Stage Lighting Rehabilitation

To restore the Katherine Cornell Theatre's theatre equipment to a working condition.

04/15/2015
 
Tisbury Gay Head Lighthouse Preservation

To move structure before it is lost to cliff face erosion.

04/15/2015
 
Tisbury MV Playhouse Foundation Facade

To refinish and repaint existing brick lower foundation facade.

04/15/2015
 
Tisbury Stone Church Stained Glass Window Preservation

Restore architectural integrity to large stained glass window in historic Stone Church.

04/15/2015
 
Tisbury MV Playhouse Pocket Park Creation

Create public pocket park with benches, plantings, sculptures, flat/level surfaces ensuring full accessibility.

04/15/2015
 
Tisbury Tisbury Housing Trust Fund

Pursue affordable housing opportunities for housing offered to the Town.

04/15/2015
 
Tisbury MV Museum, Roof Restoration

To preserve, restore and rehabilitate the original room and chimneys of the 1895 Marine Hospital.

04/15/2015
 
Tisbury Tashmoo Overlook Vegetation Management

Clear trees and vegetation on Town land within view corridor.

04/15/2015
 
Tisbury 14 Village Court

To renovate and rent a 6 unit multi-family apartment building to income qualified tenants and provide ongoing property management services to low income households earning 60% or less of the area median income.

04/15/2015
 
Tisbury Water Street Apartments

Proposal to build 6 one bedroom apartments in downtown Tisbury.

04/15/2015
 
Tisbury Water Street Apartments

Six apartments completed.

04/15/2015
 
Tisbury Gravestone Restoration

Center St. S. End, Grove Avenue gravestone restoration and training for DPW employees.

04/15/2015
 
Tisbury Tashmoo Overlook Waterworks Park Development

Planning and design for new pedestrian public access for Tashmoo Overlook Waterworks park development.

04/15/2015
 
Tisbury Owen Park Landscaping

Improve pedestrian access, create sidewalk, install irrigation system for Owen Park.

04/15/2015
 
Tisbury Firehouse/Beach St. Pocket Park

To create pedestrian walkway and pocket park between Beach Street and sports field.

04/15/2015
 
Tisbury Tisbury Town Tennis Court Repair

Renovation of Town Clay Tennis Courts.

04/12/2016
 
Tisbury Lagoon Pond Drawbridge Sign

Design of an Educational sign at the site of the new drawbridge at Lagoon Pond.

04/12/2016
 
Tisbury Kahn's Way Land Acquisition/Predevelopment

Funding for the 14.8 acre Kuehn's Way Land Acquisition and predevelopment costs.

04/12/2016
 
Tisbury Lake Street Public Landing Restoration

Restoration of the Lake Street Public Landing Dock's pilings and decking.

04/12/2016
 
Tisbury Gravestone Restoration

Continue gravestone restoration and training to preserve and restore 75 gravestones in Tisbury's South End Cemetery, Village Cemetery and Holmes Hole Cemetery.

04/12/2016
 
Tisbury Owen Park Showers

Rehabilitation of Owen Park Shower facility.

04/12/2016
 
Tisbury MV Campground Assn. Restoration Chairs/Benches

Restore Chairs and Benches at the MV Campground Association's Tabernacle Building.

04/12/2016
 
Tisbury Tisbury Town Hall

Immediate roof repairs

04/12/2016
 
Tisbury Water Street Apartments

Final appropriation for 6 new one bedroom apartments.

04/12/2016
 
Tisbury Tisbury Housing Trust Fund

Ongoing Housing Trust Fund.

04/12/2016
 
Tisbury Owen Park Master Plan Development

Development of a Master Plan for Owen Park Development and Rehabilitation.

04/12/2016
 
Tisbury Tisbury Town Dock on Lagoon Pond Repair/Replacement

Replace 12 dock pilings at the Lagoon Pond dock.

04/12/2016
 
Tisbury MV Baseball Field Concession Stand

Tisbury's share of building permanent concession stand as part of larger improvements to the field.

04/12/2016
 
Tisbury Dukes Co. Regional Housing Auth. Rental Assistance

Ongoing rental assistance program for Dukes County.

04/12/2016
 
Tisbury Tisbury Lagoon Pond Dock Stairs

Replace stairs to dock at Tisbury Lagoon Pond.

04/12/2016
 
Tisbury MV Museum Window Restoration

Restore approximately fifty (50) windows at the MV Museum's historic 1898 Marine Hospital building.

04/12/2016
 
Tisbury KC Theatre Stage Lighting Rehabilitation

Continuing work on updating and restoring historic KC Theatre Lighting and sound equipment.

04/25/2017
 
Tisbury Tisbury Housing Trust Fund

Continuing support of Tisbury Housing Trust Fund

04/25/2017
 
Tisbury Dukes Co. Regional Housing Auth. Rental Assistance

Continuing support for Dukes County Rgl. Housing Authority Rental Assistance program

04/25/2017
 
Tisbury Kahn's Way Land Acquisition/Predevelopment

Kuehn's Way, currently in litigation, progress continues to move forward, looking for positive outcome.

04/25/2017
 
Tisbury Veteran's Park Field Restoration

Rehabilitation of infield playing surface and lights, and associated costs of the work.

04/25/2017
 
Tisbury Lake Street Park Restroom

Construct two handicapped accessible bathrooms.

04/25/2017
 
Tisbury MV Museum Porches

Preserve, restore, rehabilitate the MV Museum's historic 1895 Marine Hospital porches.

04/25/2017
 
Tisbury Lagoon Pond Herring Run

Repair framing and chain link fencing, lumber and fasteners for Denil ladder on herring run.

04/25/2017
 
Tisbury Kahn's Way Land Acquisition/Predevelopment

Regional appropriation toward Kuehn's Way housing project.

04/25/2017
 
Tisbury American Legion Post #257 Artifact Cataloging/Preservation

Cataloging, preserving, appraising, displays and associated labor costs of artifacts.

04/25/2017
 
Tisbury American Legion Post #257 Building Restoration

Building restoration including engineering study, architectural drawings, window/door replacement, painting, carpentry, insulation, sidewall removal deck replacement, electrical work and associated costs.

04/25/2017
 
Tisbury American Legion Post #257 Pocket Park Flagpole

Flagpole Restoration in pocket park.

04/25/2017
 
Tisbury Gravestone Restoration

Continuing work of preserving and restoring historic gravestones in Old Village Cemetery.

04/25/2017
 
Tisbury Firehouse/Beach St. Pocket Park

Second phase, includes design, site work, addition of plant materials, reconfiguration of parking, adding lighting, info kiosk, benches, bike racks.

04/25/2017
 
Tisbury Owen Park Upper Entrance and Overlook

Design work, safety improvements, ADA accessibility, sitting, viewing and gathering area that is ADA accessible, pavers and pavement improvements, including slope/grade requirements, benches, plantings and supporting infrastructure.

04/25/2017
 
Tisbury Owen Park Bandstand

Develop design drawings and construction documents for bandstand.

04/25/2017
 

Pages

CSV