Upton Warren Brook Bridge- Robertson Property

Construction of a trail bridge for public use across Warren Brook on the Robertson Family Conservation Restriction Area Trail Easement.

05/04/2023
 
Waltham 82-86 Orange St.

Housing Support for energy saving capital improvements at the Whalen Apartments of the Waltham Housing Authority.

02/11/2008
 
Waltham Hardy Pond Lands I

Acquisition, Preservation, Rehabilitation and/or Restoration of certain land parcels in the Hardy Pond area for the purpose of Open Space and possible future Open Space Recreation.

03/10/2008
 
Waltham 67 Crescent St.

Acquisition of land parcel at 67 Crescent St. for Open Space and future passive Open Space Recreation.

03/10/2008
   
Waltham Charles River Museum of Industry

Consultants studies of preservation and rehabilitation of historical mill buildings, documents and artifacts, to include concept drawings and cost estimates.

03/10/2008
 
Waltham Whittemore Historical Aspects

Restoration of the historical terrazzo floors of the Whittemore Elementary School.

03/10/2008
 
Waltham Paine Estate - Exterior Renovations

Preservation and Restoration of the 100+ windows and 15 exterior doors of the historic Robert Treat Paine House.

03/10/2008
 
Waltham City Documents Preservation

Preserve City of Waltham historic documents within the City Clerk's purview.

03/10/2008
 
Waltham Paine Estate - House Rehabilitation

#30847 The appropriation was for $111, 500 to the Planning Office.. Provide architectural and engineering services for construction of an elevator (accessible chair lift) and restrooms for the historic Robert Treat Paine House. Spending through 6/30/14 was completed.. #31853 12/27/12 The building phase for this project was created as a separate project under the Mayor. Spending through 6/30/14 was $336,439 with a remaining balance of $17,781 unencumbered and unspent. The two projects will be consolidated when both are completed.

03/12/2008
 
Waltham Wellington House

There were three appropriations for the Wellington House (1) 3/12/08 #30844 Exterior Restoration of the historic Wellington House $100,000 (2) #31206 10/26/09 Interior Restoration of the historic Wellington House $300,000. This project was closed in FY2012. (3) Complete the House for WHC Office and museum aspects. These projects will be consolidated when the Interior is completed.

03/12/2008
 
Waltham Library Antique Light Fixtures

Three antique light fixtures (chandeliers) are to be restored and rehabilitated in the entranceway of the Waltham Public Library.

04/28/2008
 
Waltham Acquisition of Lot 1, Parcel B, 775R Trapelo Rd.

Acquisition of former Middlesex County Hospital Lot 1, Parcel B, 775R Trapelo Rd. This parcel is located behind the rectory of Our Lady's church. Seller: Commonwealth of Massachusetts. Parcel ID R015/008/0004

12/08/2008
 
Waltham Paine Estate - Fire Suppression

Planning portion of the fire suppression project for the Paine Estate

01/12/2009
 
Waltham 133-151 Moody St.

Acquisition of 133-151 Moody St. for Creation and/or Restoration of Open Space

03/09/2009
 
Waltham St. Mary Rectory - Windows

The Historic windows in the Historic St. Mary Parish Rectory were restored.

10/26/2009
 
Waltham 21 Lexington St. - Handicap Access Elevator

Installation of an elevator for handicap access at Historic 21 Lexington St.

10/26/2009
 
Waltham Wellington House

There were three appropriations for the Wellington House (1) 3/12/08 #30844 Exterior Restoration of the historic Wellington House $100,000 (2) #31206 10/26/09 Interior Restoration of the historic Wellington House $300,000. This project was closed in FY2012. (3) Complete the House for WHC Office and museum aspects. These projects will be consolidated when the Interior is completed.

10/26/2009
 
Waltham St. Charles - Exterior Restoration

St. Charles Church - Exterior Restoration

10/26/2009
 
Waltham Gore Place - Fire Suppression

Install a mist fire suppression system in the 1806 Gore Place mansion.

04/27/2010
 
Waltham Waltham City Hall Roof

Restore the historic City Hall Roof and Council Chambers Ornamental Features to preserve the building. Added Supplemental funds $50,000 1/24/11 to meet bid requirements.The supplement of $50,000 1/24/11 appropriated was added to the original appropriation of $27,000 9/28/10. The two appropriations were consolidated in Auditors Office but only the spending from the original grant of $10,063.26 is reported here.

09/28/2010
 
Waltham Waltham City Hall Roof

The supplement of $50,000 1/24/11 appropriated to the original appropriation of $27,000 9/28/10 to meet bids is reported here. The two appropriations were consolidated in Auditors Office but only the supplement is reported here.

01/24/2011
 
Waltham Lot#81 Arcadia Ave.

Acquisition of Open Space Lot#81 Arcadia Ave adjoining DCR Beaverbrook North Reservation. Seller: Walter E. Ohnemus, Inc. Parcel ID: R037/001/0001

02/28/2011
 
Waltham Historic Building Survey

Update Waltham Historical Building Survey

03/28/2011
 
Waltham Christ Church (Episcopal) Tower & Window Restoration

Restoration and Preservation of Historic Tower and Window. The project was closed prior to June 30, 2014

06/28/2011
 
Waltham Grove Hill Cemetery Markers

Waltham Historical Society Restoration and preservation of Grove Hill historic cemetery markers and artifacts

09/26/2011
 
Waltham Lyman Estate (SPNEA/HNE)

Provide a matching grant to finish underfunded work at the Waltham HNE Lyman Estate

09/26/2011
 
Waltham City Documents Preservation - Bright School - Vaults

9/26/11 #31609 $1,400,000 Build Historic Records Retention Center Vaults in previous Bright School.

09/26/2011
 
Waltham City Documents Preservation - Bright School - Fire Suppression

11/14/11 #31630 $259,000 Design and Install a fire suppression system for the preservation of the structure and Historic Records Center at the Bright School

11/14/2011
 
Waltham 385 Trapelo Rd.

Acquisition of the parcel at 395 Trapelo Rd. after the demolition of the existing house. Charles P. Mantenuto, Trustee. Parcel ID: R036/001/0001

12/27/2011
 
Waltham 287 AFT Grove St.

Acquisition of parcel 287 AFT Grove St. for Open Space purposes. An original appropriation for an appraisal $1,600 6/26/12, was changed to a "highest and best use" appraisal appropriation of $5,000. The final spending for these was $5,000. The appropriation 10/29/13 for the acquisition was $82,500 of which $75,000 was spent in August, 2014. The total spending will be shown for two appropriations of $5,000 in FY 2014 and eventually $80,000 when shown as completed in FY 2015. Remaining funds are awaiting approval of the Waltham Law Department approval of Historic and Conservation Restrictions. Seller: Enith Blodgett & Everett Roe Parcel ID: R061/021/0016

12/18/2012
 
Waltham Chauncy Newhall School 101 Prospect St. - Roof

There were two phases of this project. (1) 9/26/11 Council Order #31613 Architect plans to restore architectural elements and replace the slate roof over the former Chauncy Newhall Elementary School at 101 Prospect St. currently community housing, with construction oversight included. This phase was closed in July 2014 with $43,753 spent of $45,500 appropriated. (2) 12/26/12 Council #31852 Construction. This phase was closed 8/15/14 using the entire Order of $848,891. These two Orders are herein consolidated for FY 2015 with a Grand Total of $892, 644 spent .

12/26/2012
 
Waltham Gore Place Carriage House

Gore Place Society will select a more suitable site, rehabilitate the building, then move its historic carriage house. This project has been completed and requests for reimbursement expected in early FY2015. The final reimbursement occurred about 3/28/15.

12/26/2012
 
Waltham Mayor - Paine Elevator and Restrooms

#30847 The appropriation was for $111, 500 to the Planning Office.. Provide architectural and engineering services for construction of an elevator (accessible chair lift) and restrooms for the historic Robert Treat Paine House. Spending through 6/30/14 was completed.. #31853 12/27/12 $354,200 The building phase for this project was created as a separate project under the Mayor. Spending through 6/30/14 was $336,419 with a balance of $17,781 unencumbered and unspent. The two projects will be consolidated when both are completed.

12/27/2012
 
Waltham Wellington House - Interior#2

This is the 3rd Appropriation for the Wellington House. #31903 4/8/13 $160,000. The intent was to complete the details for possible use of the Waltham Historical Commission (WHC) for office space and museum purposes. As of FY 2014 spending was $67,198 with $31,562 encumbered and $61,240 available.The previous Appropriations will be consolidated with this one when they are all complete.

04/08/2013
 
Waltham WHA Playground Prospect Hill Rd.

Reimbursement for 10% of construction of new playground at Waltham Housing Authority (WHA) Apartments at 42 Prospect Hill Rd. This project was completed in August 2014, FY 2015

10/28/2013
 
Waltham The Leland Home Roof Replacement

Replace existing Leland Home Roof. This project was completed in August 2014, FY 2015.

12/09/2013
 
Waltham Acquisition of the Arrigo Farm

Acquisition of the Arrigo Farm to include a small portion in Watertown. Parcel ID's:R055/002/0027 R055/002/0028 530/16/0 (Watertown)

03/10/2014
   
Waltham Acquisition of Surplus Fernald Property

During long term efforts to acquire the Fernald School property, an initial request was Recommended by the CPC and appropriated by City Council Orders#31308 and 31309 on April 13, 2010 for planning for the surplus of the Fernald, of which $9850 was spent.. The Mayor negotiated a price for the Fernald which subsequently was Recommended by the CPC for a portion of the property and appropriated by the City Council on City Council Order #33161 for $2,714,331.80 on December 9, 2014. Future projects for CPA funds will be added as appropriated. Property is 190 acres total, 140 of which were purchased with CPA funds, (50 acres are non-CPA). Seller: Commonwealth of MA. Parcel ID: R045/001/0001

12/09/2014
   
Waltham Acquisition of Surplus Fernald Property

Demolition of Buildings - Fernald. The entire campus of the Fernald School is designated historic. The buildings within the portion acquired with CPA funds will be classified as contributing (historic and usable) or non- contributing and selectively removed or maintained. Twenty buildings were initially designated as non-contributing. As of the beginning of FY 2018, $46405 has been spent, $798569 encumbered and $200669 available. Hazards studies are in progress prior to demolition.

10/27/2015
 
Waltham Tenant Based Rental Assistance (TBRA)

A Tenant Based Rental Assistance Program (TBRA) initiated by the Waltham Association to Create Housing (WATCH) was co-sponsored by the Waltham Housing Authority (WHA) . The WHA became the sole program administrator with WATCH assisting renters with TBRA applications. The grant of $2,001,500.00 is a 3 year pilot program which will provide subsidies as vouchers to landlords to supplement the affordable rent paid by an estimated 50 families living or working in Waltham..

01/25/2016
 
Waltham Historic Old Sacred Heart Church Facade

As part of the larger preservation, restoration and accessibility of the historic old Sacred Heart Church building, the exterior front facade improvements will be done with CPA funds. The building is not used for religious purposes and is the site of projects for public benefit. The CPA grant is for $86,400.

04/25/2016
 
Waltham HNE Lyman Estate Greenhouses

The historic Lyman Estate Greenhouses and handicap accessible trail were to be restored and left with similar historic appearances. A substantial benefit was that the previous technology was extremely wasteful of energy which was to be remediated. $165,900

06/07/2016
 
Waltham Paine Estate - Roof

The first phase of a roof design for preservation and restoration of the historic Paine Estate roof and the house was appropriated. The construction phase will follow after the cost is estimated by the architect.

06/13/2016
 
Waltham Acquisition of Surplus Fernald Property

CO#33482 $75,000 The Fernald Campus now owned by the City of Waltham will be reviewed to determine the historical significance of each existing building according to the Secretary of the Interior Standards and what condition (contributing) they are in currently.

06/27/2016
 
Waltham Gilmore Playground - 45AFT High St

CO#33480. $1,754,634. The new Gilmore Playground is designed to meet public input. It is divided into four recreation zones for different age groups, uses, and neighborhood compatibility. As of the beginning of FY2018 spending is 98% complete with $37185 available.

06/27/2016
 
Waltham Acquisition of 67 Crescent St. parcel

Council Order #33549 A request was made to the Mayor for acquisition of the parcel for a riverside "pocket park" in the limited open space in the South side area. $695,750

09/19/2016
 
Waltham French American Victory Club (FAVC)

Council Order #33606 The partially historic building and culturally historic site of the French American Victory Club French American organization was to be updated with fire protection and and a handicap accessible ramp. $95,000

12/12/2016
 
Waltham Charles River Museum of Industry and Innovation (CRMII)

CO#33668 Handicap accessibility with two ramps and a climate control system to preserve collections of prior Waltham historic industries. The current lease was to be increased by no less than 27 years. $350,000

02/13/2017
 
Waltham Acquisition of Surplus Fernald Property

Unexpected asbestos found during the previously approved demolition of 20 buildings on the Fernald property led to this project to abate any such asbestos hazards prior to continuation of the demolition project.

06/06/2017
 
Waltham Wayside Trail Design

Design of the Waltham Component of the Wayside Trail (Bicycle Trail)

06/06/2017
 