Somerville Somerville Museum Elevator Additional Funds

The Somerville Museum will construct an elevator, the design of which has been approved by the Massachusetts Architectural Access Board and the Somerville Historic Preservation Commission.

06/27/2019
 
Somerville 100 Homes Initiative

Unanticipated carrying costs for 100 Homes properties (Overages accumulated on 100 Homes properties that were already in process. The funds paid were used to pay for carrying costs, such as interest that accumulated on MHIC loans when projects were delayed due to unforeseen circumstances.

09/12/2019
 
Somerville Central Hill Campus Phase 1

The first phase of renovating Central Hill Park, CPA funds will be used for reconstruction of the Central Hill Playground.

12/12/2019
 
Somerville Elizabeth Peabody House Fire Alarm System

The Elizabeth Peabody House Association will install an addressable fire alarm system for their building at 277 Broadway.

12/12/2019
 
Somerville Somerville Museum Elevator

The Somerville Museum will construct an elevator, the design of which has been approved by the Massachusetts Architectural Access Board and the Somerville Historic Preservation Commission.

12/12/2019
 
Somerville Somerville Affordable Housing Trust Appropriation FY20

The Somerville Affordable Housing Trust serves as the housing arm of the Somerville Community Preservation Committee. FY20 is first year that debt service of $312,153 will be paid on the 100 Homes bond.

12/12/2019
 
Somerville Open Space Acquisition Fund

The City of Somerville Public Space and Urban Forestry Division is seeking seed funding for the Open Space Acquisition and Improvements Stabilization Fund.

12/12/2019
 
Somerville 100 Homes initiative - 21 Cutter Ave

As part of the 100 Homes Initiative, a property was acquired creating 2 two units at 80% AMI and one unit at 100% AMI.

01/07/2020
 
Somerville Respond Housing Program for Victims of Domestic Violence FY20

RESPOND will provide flexible rental assistance for up to 6 months for survivors of domestic violence who are seeking safe, independent housing in Somerville.

01/09/2020
 
Somerville 100 Homes Initiative Program Management FY20

Administrative expenses incurred under the program between 1/1/19 and 12/31/20. appraisal and inspection costs for properties not purchased; legal and purchase transaction costs; staff salaries; other unreimbursed costs.

01/09/2020
 
Somerville SHC Prevention and Stabilization Services (PASS) Program FY20

The Somerville Homeless Coalition will expand the PASS program, which provides rental assistance for up to two years, housing move-in assistance, supportive case management, and follow-up stabilization services to Somerville residents at risk of falling into homelessness, to approximately six additional households.

01/09/2020
 
Somerville CAAS Housing Stability Fund FY20

The Community Action Agency of Somerville provides up to $3,000 in assistance in the form of grants and loans to cover CPA eligible uses for homelessness prevention, including first and last month's rent and security deposits. The program is expected to serve at least 55 households.

01/09/2020
 
Somerville SHC Leasing Differential (Better Homes) Program FY20

This Leasing Differential Program continuation of the Better Homes Program will benefit 17 formerly homeless and disabled Somerville households. Funding will cover the gap in rent between what HUD can fund (up to FMR) and what the actual cost of the monthly rent is for the units in Somerville.

01/09/2020
 
Somerville 100 Homes Initiative

Unanticipated carrying costs for 100 Homes properties (overages accumulated on 100 Homes properties that were already in process. The funds paid were used to pay for carrying costs, such as interest that accumulated on MHIC loans when projects were delayed due to unforeseen circumstances).

01/10/2020
 
Somerville 100 Homes Initiative - 53 High Street

As part of the 100 Homes Initiative, a property was acquired to create two new units affordable at 100% AMI.

03/13/2020
 
Somerville ‱ Prevention and Stabilization Services (PASS) Program

Rental Assistance Program

07/01/2020
 
Somerville 100 Homes Initiative - 31-35 Linden St

As part of the 100 Homes Initiative, a property was acquired to create 3 new units, of which 2 are affordable to households earning 100% AMI and one affordable to households at 80% AMI.

11/02/2020
 
Somerville 100 Homes initiative - 27 Everett Ave

Part of the 100 Homes Initiative, a 3-family property was acquired, creating one unit affordable at 50% AMI and two units affordable at 80% AMI.

11/15/2020
 
Somerville Works Progress Administration Carved Wood Bas-Relief Restoration Project

The Somerville Public Library hired a conservator to restore the wood bas-relief in the Central Library carved by a local artist through the Works Progress Administration program in 1939. This funding allocation is for continuation of the work of installing the bas-relief at a safer location and restoring it to its original condition.

02/11/2021
 
Somerville Somerville Museum - Capital Improvements

Additional funds were awarded to complete the installation of an elevator for the museum, due to encountering a stone ledge when drilling for the foundation for the elevator shaft.

02/11/2021
 
Somerville Broadway House, 181 Broadway

Broadway House (181 Broadway) is a significant community asset, a historic building providing affordable housing for disabled young adults experiencing chronic mental illness. The Broadway House will rehabilitate the building's exterior and window replacement, improving energy efficiency and preserving historic details.

02/11/2021
 
Somerville Broadway Winter Hill Congregational Church Bell Tower

The Broadway Winter Hill Congregational Church Bell Tower project will restore the structural soundness to the bell tower and restore its existing slate roof surfaces.

02/11/2021
 
Somerville SHC CPA PASS FY21

Prevention and Stabilization Services (PASS) program. Grantee is Somerville Homeless Coalition.

02/11/2021
 
Somerville SHC Leasing Differential FY21

Funding to assist agencies with HUD funded Continuum of Care Permanent Supportive Housing (PSH) program use these funds to make up the differential between HUD program leasing dollars and the actual rent cost. Grantee is Somerville Homeless Coalition.

02/11/2021
 
Somerville SHC Tenancy Stabilization Program FY21

Tenancy Stabilization Program (TSP) which assists with rental arrears and start up costs. Grantee is Somerville Homeless Coalition.

02/11/2021
 
Somerville CAAS Tenancy Stabilization Program FY21

Tenancy Stabilization Program (TSP) which assists with rental arrears and start up costs. Grantee is Community Action Agency of Somerville.

02/11/2021
 
Somerville CAAS CPA PASS FY21

Rental assistance program (Prevention and Stabilization Services). Grantee is Community Action Agency of Somerville.

02/11/2021
 
Somerville Grace Baptist Church Restoration

The Somerville Hispanic Association for Community Development will repair the existing slate roof surfaces and related flashing and brick masonry.

02/11/2021
 
Somerville Healey School Tot Lot Renovation

The City of Somerville and Friends of the Healey will procure a firm to renovate the Healey School tot lot, which is the primary outdoor play and learning environment for students in pre-K through Grade 2.

02/11/2021
 
Somerville Respond CPA PASS FY21

Rental assistance program specifically for households who are victims of DV, contract expended in FY23. Grantee was Respond Inc.

03/11/2021
 
Somerville Somerville Affordable Housing Trust Appropriation FY21

Appropriation to Somerville Affordable Housing Trust

05/27/2021
 
Somerville Open Space Acquisition Fund

Seed funding for the Open Space Land Acquisition Fund so that open space parcels can be acquired.

05/27/2021
 
Somerville Grace Baptist Church Restoration

Provide accessibility improvements to the basement level, creating an accessible entrance, eliminating changes in floor elevation, and installing the foundation for an elevator to eventually serve the upper floors of the building. The grant also covers the cost of emergency structural repairs to the roof, and will restore wooden window frames and sashes in the upper floor of the southwest tower.

01/27/2022
 
Somerville Junction Park

Seed funding for design and engineering services for the expansion of Somerville Junction Park, combining an existing 0.6 acre passive park with an adjacent 0.83 acre city-owned lot that had been used for parking to create new park amenities adjacent to the MBTA Somerville Community Path.

01/27/2022
 
Somerville Glen Street Park Community Garden Expansion

Construction funding for the expansion of the community garden at Glen Park. The proposed improvements include abandoning Palmer Avenue, installing a new accessible parking and garden utility area, new accessible raised beds, a seating area, and doubling the amount of existing garden area.

01/27/2022
 
Somerville Elizabeth Peabody House 2nd Floor Reinforcement Design

Architectural drawings, structural reports, and inspections related to strengthening the beam under the second floor, which is needed to meet the State Building Code for assembly spaces.

01/27/2022
 
Somerville Somerville Museum: Collection Preservation

Design and renovation of the museum’s collection storage areas to provide for climate control, flood protection, and space optimization, and to upgrade electrical circuitry, lighting, and storage furniture.

01/27/2022
 
Somerville Open Space Acquisition Fund

Seed funding for the Open Space Land Acquisition Fund so that open space parcels can be acquired

01/27/2022
 
Somerville Somerville Affordable Housing Trust Appropriation FY22

Appropriate funds to the Somerville Affordable Housing Trust

01/27/2022
 
Somerville Clarendon Hill Redevelopment

To finance a portion of the Somerville Housing Authority's project to redevelop its Clarendon Hill development. A total of 591 new units on the site will replace 216 deeply affordable public housing units, build 80 new affordable units, and 223 units of market rate housing. CPA funds will support Phase 1, which includes 38 new affordable units and 130 replacement units.

06/09/2022
 
Somerville 100 Homes acquisition 184 Broadway

184 Broadway-acquisition by SCC for 100 Homes

06/09/2022
 
Somerville JAS Tenancy Stabilization Program FY22

Tenancy Stabilization Program (TSP) which assists with rental arrears and start up costs. Grantee is Just A Start.

07/14/2022
 
Somerville Somerville Museum: Collection Preservation

Additional funds for design and renovation of the museum’s collection storage areas to provide for climate control, flood protection, and space optimization, and to upgrade electrical circuitry, lighting, and storage furniture.

07/14/2022
 
Somerville 100 Homes Initiative Program Management FY22

Funds awarded to the Somerville Community Corporation to assist with prospecting and other pre-development activity related to the 100 Homes Initiative

07/14/2022
 
Somerville SHC HOME PASS Rental Assistance Program FY22

CPA funds contribute to the administrative side of the HOME-funded PASS rental assistance program. Grantee is Somerville Homeless Coalition.

07/14/2022
 
Somerville Broadway House, 181 Broadway

Additional funds to close a budget gap for the CPA-funded restoration of 181 Broadway, which is a group home for young adults with psychiatric disabilities owned by Cascap. Since receiving CPA funding in FY21, construction costs have increased significantly, while the contractor has determined that larger sections of trim and siding need to be replaced.

10/25/2022
 
Somerville Elizabeth Peabody House Window Restoration

The Elizabeth Peabody House will renovate windows throughout the historic building at 277 Broadway from which the organization operates its programs to benefit children and families. The project will replace inappropriate windows on the first floor and will restore and preserve the tall stained glass windows on the second floor. The organization will use funds from private donors to treat the small sections of stained glass which contain religious imagery. The project also includes the restoration of exterior trim around the windows, installing a historically-accurate three-paned window above the main doors, replacing the main doors with wood-paneled doors, and restoring the three clock faces in the tower of the building.

03/09/2023
 
Somerville Mudflat Studio Facade Preservation Study

Mudflat Pottery School, Inc. will prepare an assessment of current conditions and a plan to preserve original decorative elements on the façade of their building at 81 Broadway in East Somerville, a former movie theater converted to a pottery arts school and studio. The study represents the first phase of the restoration project; a future second phase will entail hiring contractors to make recommended repairs.

03/09/2023
 
Somerville Henry Hansen Park Construction

Funding for construction for the renovation of Henry Hansen Park. This project will implement a previous CPA-funded design phase. The project will improve a park which is currently in poor condition, providing greater street access, handicapped accessibility, new seating, green spaces and plantings, a water bottle filler, and a historic memorial plaza space that incorporates educational elements.

03/23/2023
 
Somerville Junction Park

This project implements a previous CPA-funded design phase for the expansion and renovation of Somerville Junction Park, which combines an existing 1 acre passive park with an adjacent 0.5 acre City-owned lot that had been used for parking to create new park amenities adjacent to the MBTA Somerville Community Path. Improvements will include a large passive lawn area, native pollinator plant beds, ADA accessible walking paths, overlooks, fixed and movable lounge seating, cafe and picnic tables, a water bottle filler, bike repair station, cooling water mist stations, and artistic elements calling back to the history of Somerville Junction Park.

03/23/2023
 